Laserfiche WebLink
Task 2: Select where the project will discharge its stormwater <br />R An existing piped conveyance system <br />❑ Outlet protection such as rip -rap pad (less than 0.3 CFS) <br />❑ Dispersion trench or other dispersion facility (0.3 to 0.75 CFS) <br />❑ Piped conveyance to appropriate discharge location with easement if required <br />(greater than or equal to 0.75 CFS) <br />❑ Other: -------------------------------- <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 16 <br />