My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 81ST PL SE 2023-05-10
>
Address Records
>
81ST PL SE
>
2602
>
2602 81ST PL SE 2023-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 9:44:20 AM
Creation date
1/24/2023 11:51:41 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST PL SE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: List #1 approach to MR #5 compliance <br />You are required to use the first applicable BMP that is considered feasible in each <br />0 category (lawn, landscape, and hard surfaces) below. Mark whether the BMP is feasible or <br />infeasible. If you selected infeasible, cite the reasons for infeasibility (see Worksheet 2) <br />and or a professional, site specific reference to supporting documentation (such as a <br />geotechnical report). <br />List #1: On -Site Stormwater Management BMPs for MR #1-5 Projects <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T5.13: <br />Post -Construction Soil Quality <br />and Depth <br />F_ <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T5.10A: <br />Downspout Full Infiltration* <br />*Soils report required for this BMP <br />or <br />BMP 5.30: <br />Full Dispersion <br />BMP T5.14A: <br />Rain Gardens* <br />L <br />*Soils report required for this BMP <br />or <br />BMPT7.30: <br />Bioretention Cells, Swales, <br />and Planter Boxes <br />BMP T5.1013: <br />Downspout Dispersion <br />Systems <br />BMP T5.10C: <br />Perforated Stub -out <br />Connections <br />Feasible <br />Infeasible <br />If infeasible provide justification <br />BMP T.530: <br />Full Dispersion <br />BMP T5.15: <br />Permeable Pavements* <br />F <br />*Soils report required for this BMP <br />or <br />BMP T5.14A: <br />Rain Gardens* <br />— <br />or <br />BMPT7.30: <br />Bioretention Cells, Swales, <br />and Planter Boxes <br />BMP T5.12: <br />Sheet Flow Dispersion <br />— <br />—I <br />or <br />BMP T5.11: <br />Concentrated Flow Dispersion <br />—1 <br />L <br />* If you selected BMP T5.10A Downspout Full Infiltration submit 1 and 3 below. <br />* If you selected BMPT5.15 Permeable Pavement, or T5.14A Rain Gardens in List#1, on -site soils information for sizing <br />or infeasibility determination is required from 1 through 4 below. <br />Submit the following information to Permit Services with this report: <br />1) A USDA Custom Soil Report from websoilsurvey. sc. egov. usda.gov <br />2) Small-scale Pilot Infiltration Tests (PIT) per SWMMWW specifications <br />3) USDA Soil Type(s)= <br />4) Measured Infiltration Rate = --- __----- in/hr (from PIT) <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.