Laserfiche WebLink
SOURCES: Portion of total amendment quantity (from line 11) that is: <br />12. Purchased from off -site sources.....................................................................---_____ % <br />13. Stockpiled soil and duff from on-site................................................................---_____ % <br />14. Chipped and stockpiled woody material from on -site ........................................... % <br />15. Imported topsoil..........................................................................................-------- % <br />16. CHECK: The total of lines 12 through 15 should total 100%................................... 100% <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) .................................... ----------- ft2 <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />18. MULCH QUANTITY NEEDED.............................................................................------------- yd3 <br />SOURCES: Portion of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................---------- % <br />20. Chipped and stockpiled woody material from on -site .............................................. _--------- % <br />21. CHECK: The total of lines 19 and 20 should total 100%......................................... 100% <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 43 <br />