Laserfiche WebLink
GENERAL NOTES® <br />1 <br />GPM FLOW RATE FROM FIELD MEASUREMENTS. GPD AVG AND MAX <br />ESTIAMTED FROM 3 MONTH HISTORICAL DATA OF PUMP RUN <br />DURATION AND FREQUENCY. HEADER PIPE SHOWS FUTURE <br />ESTIMATED FLOWS IN PARENTHESES. <br />FLOOR WATER <br />< <br />DRAIN <br />TO <br />TRENCH <br />� <br />2 <br />GPM FLOW RATE FROM HYDRAULIC MODEL RESULTS. GPD AVG <br />AND MAX FLOWS PROVIDED BY URPH 99INDUSTRIAL WASTE 40-5 <br />0 <br />BUILDING SUMMMARY.99 DEADER PIPE SHOWS FUTURE ESTIMATED <br />FLOWS IN PARENTHESES. <br />� <br />9 <br />3 <br />AVERAGE GPD FLOWRATES ESTIMATED BY COMPARING 3 MONTH <br />HISTORICAL DATA DIFFERENCE BETWEEN FACTORY FLOW TO 40-51 <br />SUMP AND 40-51 SUMP DISCHARGE. 3,000 GPD ESTIMATED FOR <br />40-51 PAINT HANGER BUILDING PIW AND GRAVITY TO 40-51 <br />SUMP. MAX GPD FLOWRATE ESTIMATED ASSUMING A PEAKING <br />FACTOR O F 3. <br />PUMP: PPWP-1, PPWP-2 <br />4 <br />COMBINED ESTIMATED GPD AVG AND GPD MAX FOR BOTH GRAVITY <br />50 GPM AT 23 FT <br />AND PUMPED SYSTEMS WITHIN 40-51 BUILDING. 3,000 GPD AVG <br />(4) <br />STRINGER <br />PREP BOOTHS <br />1.549-6" <br />FROM BOEING PFD ESTIMATES. 16,000 GPD MAX FROM BOEING <br />1 HP, 1750 RPM <br />PRELIMINARY TANK ASSESSMENT ESTIMATES AND ASSUMING LARGE <br />480V/3PH/60HZ <br />PEAKING FACTOR DURING SIMULTANEOUS SYSTEM OPERATION <br />MFG: PACO <br />WITHIN 40-51 BUILDING.. <br />Lu <br />DRAIN FROM AIR DUCT <br />MOD: 1570®0 SLD <br />OF PREP BOOTHS <br />2" DIAPHRAGM PUMP. SEE 40-51 EQUIPMENT LEGEND FOR MORE <br />PUMP INFO. <br />I <br />L <br />b I <br />w <br />SUMP: VPB #1 <br />6 <br />PIPING ENTERS 40-51 BUILDING PLENUM. SINGLE WALLED SS <br />® <br />- <br />CAP: XXX GAL <br />SCH 40. <br />5 <br />PIW OTBD <br />DIM: XXX <br />299 GALV SCH 40 <br />LINED: XXX <br />REFERENCE AEU I G <br />PUMP: N/A <br />40-51-M I J 40-051-4001-M 114 <br />XXX GPM AT XX FT <br />40-051®UGM113 40-051-4001-M136 <br />AIR INLET AT XX PSI <br />40-51-UGM163 40-051-4001-M138 <br />MFG: XXX <br />40-51-UGM164 40-051-4001-M139 <br />� <br />MOD: XXX <br />= <br />PUMP: PPWP-3, PPWP-4 <br />40-51-UGM165 40-051-4001®M143 <br />® <br />50 GPM AT 23 FT <br />40-051®UGM166 40-051-4001-M144 <br />0T13- <br />DSCH <br />c� <br />PIW OTBD <br />- -- - <br />1.59�-6 <br />40-051-UG 167 40-034-UGM507 <br />®X XX <br />�98 GALV SCH 40 <br />1 HP, 1750 RPM <br />40-51- 504 40-034-UGM510 <br />PIW OTBD <br />4 OV/3PH/60HZ <br />40-051-4001-M106 <br />699 CS SCH 40 <br />MFG: PACO <br />_ <br />IW OTBD <br />MOD: 1570-0 SLD <br />4" XX SCH <br />XX <br />� <br />� <br />GENERAL NOTES <br />J- <br />SUMP: VPB 2 <br />V <br />� <br />� <br />� <br />PUMP: P1T <br />1050 GPM AT 40 FT <br />CAP: XXX GAL <br />REVISIONS INCLUDE REMOVAL OF ABANDONED 4-INCH FRP, <br />M <br />® <br />DIM: XXX <br />(A <br />� <br />V <br />4 <br />XX9'XXP'®XX98 <br />LINED: XXX <br />4X6-INCH SSxCPVC, AND INSTALLATION OF NEW 4x6-INCH <br />®� <br />15 HP, 1800 RPM <br />SUMP: <br />AWLS <br />SSxSS PIW 0600. <br />00 <br />4®V/KPH/60HZ <br />CAP: XXX GAL <br />� <br />� <br />144 GPM <br />MFG: <br />DIM: <br />XXX <br />-- <br />12000 <br />GPD <br />AVG <br />_ <br />_ <br />MOD: VERTICAL TURBINE <br />LINED: XXX <br />� <br />` <br />3,000 <br />GPD <br />MAX <br />3,000 GPD AVG <br />PIW 0600 (NEW) <br />16,000 GPD MAX <br />FLOW METER <br />40-51 <br />40-YARD <br />399 �� <br />- - <br />SS SCH 10S <br />SS SCH 10S <br />�o 0®�1 <br />PIW 03_00 <br />PUMP: Pm9 P®10 <br />PIV� 0600 x SS SCH 10S <br />x SS SCH 10S <br />To p <br />p o�YD�M <br />)—og <br />4" SS SCH 40S <br />- <br />254 GPM AT 224 FT <br />99 99 99 <br />P® <br />- <br />4'�x6" SS SCH 10S x <br />45®YD®M3-01 <br />3 X2 ®7.5 <br />I <br />SS SCH 10S <br />� <br />PIW 000LABELED <br />25 HP--t, 3550 RPM <br />- <br />Poc <br />4" SS <br />SCH 40S <br />460V/3PH/60HZ <br />3" SS <br />a ® <br />1 <br />MFG: SUMMIT <br />�9Ld <br />MOD: 2196 <br />Pa 10 <br />r- <br />40.51 ivORlli I'il^,' SUMP <br />