Laserfiche WebLink
DAILY FIELD REPORT <br />Inspection Date <br />02/14/2023 <br />AAR TESTING AND INSPECTION, INC. <br />7126 180th Ave NE, Suite C101 <br />Redmond, WA 98052 <br />425-881-5812 <br />Report Number <br />TJD021423A <br />CLIENT INFORMATION <br />PROJECT INFORMATION <br />Contact <br />Bruce Christopher <br />Project No. <br />23-072 <br />Company <br />Bruce Christopher Construction <br />Project Name <br />Ohlfs ADU <br />Address <br />8816, Cascadia Ave <br />Address <br />4828 Deleware Ave <br />City <br />Everett <br />City <br />Everett <br />Contractor <br />Permit No. <br />B2210-031 <br />INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br />Reinforced Concrete Wall for Stairs at the South side of the building <br />Weather Start Time End Time <br />Sunny 08:00 AM 12:00 PM <br />DRAWINGS / DOCUMENTS REFERENCED <br />Approved plans <br />INSPECTION OBSERVATION / REMARKS <br />Arrived on site, as requested, to inspect and test concrete. <br />Stanwood supplied 7 cyds of mix design 55111. <br />Concrete was placed by boom pump and consolidated via mechanical vibration. <br />Concrete field test results were as follows: <br />Sample 1: Truck 211, Ticket No.: 210431, Slump: 4", and Concrete Temp: 50 <br />Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements <br />Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br />Inspectors Signature Tony Dalzell 02/14/2023 Teajalam (TJ) Gounden 02/15/2023 <br />l <br />5270e64939402c42-1676432018220 <br />