My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4828 DELAWARE AVE 2025-03-27
>
Address Records
>
DELAWARE AVE
>
4828
>
4828 DELAWARE AVE 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:00:09 PM
Creation date
1/25/2023 8:25:46 AM
Metadata
Fields
Template:
Address Document
Street Name
DELAWARE AVE
Street Number
4828
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT <br />Inspection Date <br />02/08/2023 <br />AAR TESTING AND INSPECTION, INC. <br />7126 180th Ave NE, Suite C101 <br />Redmond, WA 98052 <br />425-881-5812 <br />Report Number <br />JAH020823A <br />CLIENT INFORMATION <br />PROJECT INFORMATION <br />Contact <br />Bruce Christopher <br />Project No. <br />23-072 <br />Company <br />Bruce Christopher Construction <br />Project Name <br />Ohlfs ADU <br />Address <br />8816, Cascadia Ave <br />Address <br />4828 Deleware Ave <br />City <br />Everett <br />City <br />Everett <br />Contractor <br />Permit No. <br />B2210-031 <br />INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br />Proprietary Anchors - Epoxy Dowels South stair case retaining wall <br />Weather Start Time End Time <br />Cloudy 07:00 AM 10:00 AM <br />DRAWINGS / DOCUMENTS REFERENCED <br />EST 2508 <br />INSPECTION OBSERVATION / REMARKS <br />Epoxy Reinforcing Steel Dowel Installation: <br />As requested, I was on site to observe the installation of epoxied reinforcing steel dowels on the South stair case retaining wall. I observed the <br />contractors cleaning the drilled holes by blowing the holes with compressed air and brushing the holes with a bottle brush. The holes were at <br />least 6" deep. The contractors used Simpson Strong Tie Set XP epoxy, with an expiration date of 05/10/24. Sufficient quantities of the epoxy <br />was placed in the holes prior to installing the #4 reinforcing steel dowels, with one full circle rotation. <br />Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements <br />Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br />Inspectors Signature James Huggins 02/08/2023 �. �'?A Teajalam (TJ) Gounden 02/09/2023 <br />20EE58AE-AA39-4959-A497-87D866A03377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.