My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:41:42 PM
Creation date
1/25/2023 9:39:24 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/6/2021 8/6/2021 BLDG 04-UFER STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> GROUND APPROVAL <br /> Notes: <br /> 8/5/20218:48 AM Adam Chudoba <br /> Consultation inspection. <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (8/6/202111:25 AM SKB) <br /> skb changed Inspection Type from ELEC 08-OTHER to BLDG 04-UFER GROUND <br /> (8/6/202111:32 AM SKB) <br /> 3/0 copper stubbed up at service location and at IDF 2 grounding electrodes tied in and stubbed up at service location. <br /> 8/25/2021 8/25/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 8/24/202112:22 PM Adam Chudoba <br /> Requesting PM inspection if possible <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (8/25/202110:49 AM SKB) <br /> 2 4 inch from the vault into the building to the server room in the southwest corner with 2 2inch returning back to the south about 100 feet.Seven <br /> conduit stub from the server room from to the east perimeter wall for parking lot lights andcar charging stations. <br /> 8/26/2021 8/26/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 8/25/20211:00 PM Adam Chudoba <br /> Will be on site. <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (8/26/202110:14 AM SKB) <br /> Stub ups with PVC and two GRC from line D 2 to electrical room.Floor box at room 176 women's Health to G line.Two 1 inch conduit 2 inch conduit <br /> from COM room to 4.5 heading south.Extend the 2 2inch that came from the common room outside of the building at about 6.5 heading west. <br /> I <br /> Printed: Friday, 20 January,2023 2 of 18 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.