My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:41:42 PM
Creation date
1/25/2023 9:39:24 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/10/2021 9/10/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 9/9/202112:19 PM Adam Chudoba <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (9/10/202110:07 AM SKB) <br /> 2 2"GRC and 11&1/4" rigid extending from MDP to x-ray and or CT. 2 2"inch and 1"inch PVC extending upstairs for distribution panels on second floor <br /> and fire alarm for non-patient care areas. Extended 3 1" PVC extending out of building line in the south west corner for parking lot lights etc.Three stub <br /> ups one GRC and 1 PVC stub up at each location on the center of Gridline five for patient care. <br /> 9/14/2021 9/14/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 9/13/202112:52 PM Adam Chudoba <br /> Will be on site as usual. <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (9/14/202111:12 AM SKB) <br /> GRC stub ups one in each of three exam rooms one also has a 11/4 inches low-voltage conduit on Grid line 6.2 GRC Stub ups,one each of 2 exam room <br /> on Gridline 7.On Gridline 7.5 we have two floor boxes and wall Stub ups on Gridline E and Gridline F all PVC.Three conduit extending from the subpanel <br /> in the CT area to door operators in the south west quadrant.Two stub ups from the electrical room to soiled room and 1 stub ups in 131 in southwest <br /> quadrant. Teamwork one and teamwork to floor boxes Power and low-voltage all in PVC.Set ups in panel room and three ties into you for brown <br /> stubbed up 1 for each,main,transformer and MDP. 1 UFFER stubbed up at pump room.2 1"inch from server room to IDF room. <br /> 9/16/2021 9/16/2021 ELEC 02-GROUND TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 9/15/202110:37 AM Adam Chudoba <br /> Requesting AM inspection if possible. <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (9/16/20211:36 PM T110) <br /> Approved underground between gridlines c&d :4-8. <br /> I <br /> Printed: Friday, 20 January,2023 4 of 18 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.