Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/4/2022 5/4/2022 ELEC 07-TGRID STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 4/29/2022 9:50 AM Adam Chudoba <br /> 1st Floor T-Grid <br /> Site Contact:Fabian Garcia 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (5/4/2022 12:27 PM SKB) <br /> OK first floor T Grid excluding x-ray,CT,and the break room. <br /> 5/4/2022F5/4/2022 ELEC 10 FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 4/29/2022 9:51 AM Adam Chudoba <br /> Elevator pit and elevator controller <br /> Site Contact:Fabian Garcia 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (5/4/2022 12:02 PM SKB) <br /> skb changed Inspection Type from ELEC 09-OTHER to ELEC 10-FINAL <br /> (5/4/2022 12:27 PM SKB) <br /> No access.Provide access to the elevator tech 32 panel so I can do my inspection of the elevator. I also need access to the pit. <br /> 5/9/2022 5/9/2022 ELEC 07-TGRID MIKE BEARDA PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/4/2022 1:05 PM Adam Chudoba <br /> 2nd Floor T-Grid <br /> Site Contact:Fabian Garcia 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:adamc@northstar-electrical.com <br /> (5/9/2022 10:20 AM MCB) <br /> Ok t bar 2 floor except conference rooms <br /> I <br /> Printed: Friday, 20 January,2023 10 of 18 <br /> SUPERION <br />