Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/25/2022 5/25/2022 ELEC 06-ROUGH IN STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/23/2022 2:57 PM Adam Chudoba <br /> Cover Inspection for South Stairwell <br /> Site Contact:Fabian 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:lukasm@northstar-electrical.com <br /> (5/25/2022 12:12 PM SKB) <br /> OK hard lid in north west stairwell top floor. <br /> 5/25/2022 5/25/2022 ELEC 10-FINAL STEVE BANKS 7NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 5/23/2022 3:06 PM Adam Chudoba <br /> Elevator Inspection <br /> LNI Elevator Inspector:Scott Scanbargin 360-661-0495 <br /> Site Contact:Fabian 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:lukasm@northstar-electrical.com <br /> (5/25/2022 12:12 PM SKB) <br /> Electrician said he has nothing to inspect on the elevator at this time. <br /> 5/26/2022MIKE BEARDA PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> F5/26/2022 ELECO2-GROUND <br /> Notes: <br /> 5/25/2022 1:42 PM Adam Chudoba <br /> Ditch cover inspection <br /> Site Contact:Fabian 206-380-2540 <br /> Contact Name:Fabian Garcia <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2063802540 <br /> e-Mail:lukasm@northstar-electrical.com <br /> (5/26/2022 2:01 PM MCB) <br /> Ok lighting conduits to first box.Ok conduits to mri trailer <br /> I <br /> Printed: Friday, 20 January,2023 12 of 18 rk <br /> SUPERION <br />