Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/25/2021 3/25/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 3/24/20212:48 PM Adam Chudoba <br /> Inspect under ground conduit for cover that feeds temp trailer power.Please call 30 min prior to the inspection. <br /> Contact Name:Adam Chudoba <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2067862983 <br /> e-Mail:adamc@northstar-electrical.com <br /> (3/25/20213:42 PM SKB) <br /> 1 Half inch and 1 inch PVC to job shack from Temp service 18 inches deep Along property line on North heading east then south not to be driven on or <br /> use after construction. <br /> 3/25/2021 3/25/2021 ELEC 04- STEVE BANKS PARTIAL <br /> GROUNDING APPROVAL <br /> Notes: <br /> One ground rod at trailer. <br /> 3/25/2021 3/25/2021 ELEC 06-ROUGH IN STEVE BANKS PARTIAL <br /> APPROVAL <br /> Notes: <br /> Cables entering the back of the temp job trailer panel go through 2 big knock outs without fiitnigs.They must enter through proper fittings. <br /> ELEC 01-TEMP <br /> 5/10/2021 5/10/2021 SERVICE STEVE BANKS PARTIAL APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 5/7/20212:14 PM Adam Chudoba <br /> 2nd Temp Power Inspection on SW corner. PM inspection if possible <br /> Contact Name:Adam Chudoba <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2067862983 <br /> e-Mail:adamc@northstar-electrical.com <br /> (5/10/202112:55 PM SKB) <br /> Label AIC on service.Contractor is bonding the service nipple. <br /> 10/19/202110/19/2021 ELEC 08 OTHER STEVE BANKS CORRECTION <br /> REQUIRED <br /> Notes: <br /> Provide GFCI protection to the 2 50 amp cord caps. <br /> I <br /> Printed: Friday, 20 January,2023 2 of 3 rk <br /> SUPERION <br />