My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:41:42 PM
Creation date
1/25/2023 9:39:24 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/25/2021 3/25/2021 ELEC 02-GROUND I STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 3/24/20212:48 PM Adam Chudoba <br /> Inspect under ground conduit for cover that feeds temp trailer power.Please call 30 min prior to the inspection. <br /> Contact Name:Adam Chudoba <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2067862983 <br /> e-Mail:adamc@northstar-electrical.com <br /> (3/25/20213:42 PM SKB) <br /> 1 Half inch and 1 inch PVC to job shack from Temp service 18 inches deep Along property line on North heading east then south not to be driven on or <br /> use after construction. <br /> 3/25/2021 3/25/2021 ELEC 04- STEVE BANKS PARTIAL <br /> GROUNDING APPROVAL <br /> Notes: <br /> One ground rod at trailer. <br /> 3/25/2021 3/25/2021 ELEC 06-ROUGH IN STEVE BANKS PARTIAL <br /> APPROVAL <br /> Notes: <br /> Cables entering the back of the temp job trailer panel go through 2 big knock outs without fiitnigs.They must enter through proper fittings. <br /> ELEC 01-TEMP <br /> 5/10/2021 5/10/2021 SERVICE STEVE BANKS PARTIAL APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 5/7/20212:14 PM Adam Chudoba <br /> 2nd Temp Power Inspection on SW corner. PM inspection if possible <br /> Contact Name:Adam Chudoba <br /> Site Address:220 OLYMPIC BLVD <br /> Phone:2067862983 <br /> e-Mail:adamc@northstar-electrical.com <br /> (5/10/202112:55 PM SKB) <br /> Label AIC on service.Contractor is bonding the service nipple. <br /> 10/19/202110/19/2021 ELEC 08 OTHER STEVE BANKS CORRECTION <br /> REQUIRED <br /> Notes: <br /> Provide GFCI protection to the 2 50 amp cord caps. <br /> I <br /> Printed: Friday, 20 January,2023 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.