My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2917 CEDAR ST US FOOD CHEF STORE 2023-11-01
>
Address Records
>
CEDAR ST
>
2917
>
US FOOD CHEF STORE
>
2917 CEDAR ST US FOOD CHEF STORE 2023-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:33:07 AM
Creation date
1/25/2023 9:56:44 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2917
Tenant Name
US FOOD CHEF STORE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New---------- <br />Construction Retrofit <br />Application <br />over BUR <br />TYPICAL PHYSICAL PROPERTY DATA CHART <br />PER ASTM C 1289 _ POL yIsO FOAM CORE ONi y <br />Compressive <br />Strength ! ASTM D 1621 ! Grade 1 (109 psi <br />Dimensional Stability ` ASTM D 2126 < 0.5% linear change <br />' (7 days) <br />Water Absorption ASTM C 209 < 1 %volume <br />Flame Spread* I ASTM E B4 <br />< 75 <br />Smoke Developed* ! ASTM E 84 <br />I _ < 450 <br />Service Temperature ! 260° F < less <br />Recycle Content _ 9% - pre -consumer <br />*Meets the requirements of the IBC code. For specific Flame Spread or <br />Smoke Developed Ratings please contact the <br />Hunter Panels Technical Department <br />Insulation must be protected from open flame and kept dry at <br />all times. Install only as much insulation as can be covered the <br />same day by completed roof covering material. Hunter Panels will <br />not be responsible for specific building and roof design by others, <br />for deficiencies in construction or workmanship, for dangerous <br />conditions on the job site or for improper storage and handling. <br />Technical specifications shown in this literature are intended to be <br />used as general guidelines only and are subject to change without <br />notice. For more information refer to the Storage and Handling <br />Technical Bulletin at www.hunterpanels.com. or refer to PIMA <br />Technical Bulletin No. 109: Storage & Handling Recommendations <br />for Polyiso Roof Insulation at www.polyiso.org. <br />--HIE[ n HD <br />h <br />'" High -Density Potyisocyanurate Cover Board <br />Ballasted Single_PlySystems <br />Each H-Shield HD panel should be loosely laid as a cover board <br />over either an existing roof system or base layers of insulation <br />on the roof deck. Butt edges and stagger joints of adjacent <br />panels. Install the roof covering according to the manufacturer's <br />specifications. <br />Mechanically Attached Single -ply Systems <br />Each H-Shield HD panel should be secured as a cover board over <br />either an existing roof system or base layers of insulation. Butt <br />edges and staggerjoints of adjacent panels. Install the roof covering <br />according to the manufacturer's specifications. <br />Fully Adhered Single -Ply <br />Each H-Shield HD panel should be secured as a cover board over <br />either an existing roof system or base layers of insulation. H-Shield <br />HD may be adhered to a prepared concrete deck or subsequent <br />layers of insulation with a full mopping of hot steep asphalt, <br />insulation adhesive or cold applied mastic. Butt edges and stagger <br />joints of adjacent panels. Install the roof covering according to the <br />manufacturer's specifications. Either the dark side or the white <br />side may be installed face -up to allow for desired adhesive flash -off times. Install the roof covering according to the manufacturer's <br />specifications. <br />sy,_ d Modified Bitulnen Systems (APP, SBS) <br />Each H-Shield HD panel should be secured as a cover board over <br />either an existing roof system or base layers of insulation. H-Shield <br />HD may be adhered to a prepared concrete deck or subsequent <br />layers of insulation with a full mopping of hot steep asphalt, <br />insulation adhesive or cold applied mastic. Butt edges and stagger <br />joints of adjacent panels. Install the roof covering according to the <br />manufacturer's specifications. <br />REiGodiieg Siligie-Ply Systems <br />H-shield HD provides a singular and sustainable solution in retrofit <br />applications when existing insulation is left in place. To facilitate <br />compliance with ASHRAE 90.1 Standards for energy efficiency, <br />H-Shield HD can be installed in a single layer on top of intact and <br />dry insulation after the Single -Ply membrane is removed. Butt <br />edges and stagger the joints in accordance with good roofing <br />practice and fasten as per manufacturer's specifications. The new <br />Single -Ply membrane can then be installed over an insulation <br />assembly that complies with the latest energy code requirements. <br />FASTENING REQUIREMENTS* <br />_1-75 0.5 121 16 24 <br />1-90 0.5 1—' <br />16� * i <br />* Contact your membrane manufacturer for ter specific fastenin <br />NEGEN!PIMA I hig requirements -- <br />H U N+ E R <br />Hunter Panels i Energy Smart Polyiso 888.746.1114 i www.hunterpanels.com IN <br />iVew York Illinois Texas Utah Pennsylvania "�€" t e f.ncr } .tir ar, rof,rs,, <br />c.S.eaeS��:? <br />(�p �lo <br />
The URL can be used to link to this page
Your browser does not support the video tag.