My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2917 CEDAR ST US FOOD CHEF STORE 2023-11-01
>
Address Records
>
CEDAR ST
>
2917
>
US FOOD CHEF STORE
>
2917 CEDAR ST US FOOD CHEF STORE 2023-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:33:07 AM
Creation date
1/25/2023 9:56:44 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2917
Tenant Name
US FOOD CHEF STORE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1 <br />L.J <br />STANLEYROOFING CO. <br />19710 144th .4ve AT <br />WOODINVILLE, TV4 98072 <br />ST.4NLR*3755T <br />PH: 425.483.6666 <br />TO: Evans Company <br />A T TN: Tim Collelan <br />`l e submit speciflcati(flt5 an(1 ---- (>P <br />0 <br />PROPOSAL <br />PHONE <br />4�S-c�6-J��{j <br />:EDATE <br />?0?-) <br />JOB NAME! LOC'ATIO`: <br />US Food C:Icf Store <br />2917 ('edar ST <br />Eyerctt WA 98201 <br />JOB NUNIBFR <br />JOB PHONE <br />SCOPE OF WORK: ROOF REPLACEtIEN I SOPREILA 603IIL PVC <br />• Retnove and dispose of existing roof s�•stem including metal copings & Reglet. <br />• At four locations replace existing plastic drains & overflows with new cast iron drains & overflows <br />• InstalI crickets to help alleviate ponding water (see attached cricket plan). <br />• Install a wood plate on top of the parapet wall where none exist. <br />• Mechanically fasten a i:" H-Shield HD coverboard over the existing plywood deck • Mechanically fasten a Soprema 60mil PVC over the HD coverboard. <br />• All curb wall & pipe flashings will be done to manufacturers specifications. <br />• InstaII new clad scuppers into existing collector boxes (see price <br />downspouts with new). below to replace existing collector boxes <br />• Fabricate & install prefinished 24-gauge coping to the perimeter of the building (standard colors only). <br />• Do all related cleanup and provide a Two -Year Stanley Roofing Warranty. <br />• \Manufacturer will provide a Twenty Fear NDL Warranty, <br />TOTAL MATERIAL & LABOR................................................................. S 248.250.00 + tax &permits <br />NEW COLLECTOR BOXES & DO» NSPOUTS ADD ..................................... $ 4,750.00r tax <br />NOTE: <br />o If we replace collector boxes & downspouts new downspouts will be tied into existing drainage system. <br />y Owner is responsible haying a good faith survey done. If a <br />abatement sbestos is found there will be an added cost for <br />EXCLUSIONS: ALL WOODWORKNOTMENTIONED ABOVE IATERIOR DAMAGE, INTERIOR PROTECTION, BONDS, PERMITS, <br />WSST, <br />All materials are rjwfeed to be as apeeified; All work to be compiled in professional manner seconding to standaOd plc, Any altevatioas or deviation hum theabove <br />spoe ions imrdving etas mats will be executed only upon written Orders and will bomme art exora �Se overaod above the a mule. All <br />strikes. aocidauts, w delays beyond our cotrhol. l)vvrter to carry foe, tQn0de, and otlur necessary irontanoe. Oacwarkras ate � <br />Standard ercluslons our s ei ed abm e. nai! interior rorecrion loss a business snvcarral r airs eOurwmkc chani� frc�ov and tbsy ¢r) es Com ra ' <br />mold abaremen OW eering hauls vermin l4XST <br />NOTE: This proposal may be withdrawn by us if not accepted within 30 days. <br />Payment to be made as follows: PROGRESS PAYMENTS INFULL UPON COMPLETION <br />Stanley Roofing Authorized Signature: Date of Acceptance <br />'tt <br />Signature: <br />i <br />PG+O �r-� 21I0 <br />�v— <br />
The URL can be used to link to this page
Your browser does not support the video tag.