Laserfiche WebLink
Permit #: 82210-073 RC <br />Site Address: 3003 W INCH RID <br />PUGET SOUND REGION <br />N <br />NO SCALE LOCATION MAP <br />SI TE <br />0.30 40.31 40.32 40.33 <br />40.35 40.36 <br />40.53 <br />40.21 40.22 40.23 40.24 40.25 40.26 <br />F <br />_�PROJECT LOCATION <br />N <br />SITEPLAN NO SCALE <br />-/'67- VE, T_ CAL PA NT BOOTH VENT LAT ON PHA'�F <br />40-051 <br />BULDNIG 40-051 <br />BOENG . OMMERUAL ARPLANES <br />SCOPE OF WORK <br />40-51 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2, #W5523782 <br />PERMIT SUBMITTAL <br />SUMMARY <br />THE PROJECT WILL ADDRESS THE RECURRING HEATING ISSUES WITHIN THE 767 VERTICAL PAINT <br />BOOTH'S (BOOTH #1) PROCESS VENTILATION SYSTEM. <br />COORDINATION WITH PRODUCTION IS NECESSARY TO ACCOMPLISH THE REQUIRED WORK. THIS <br />PROJECT WILL BE COMPLETED IN CONCURRENCE WITH SEMI —CONTINUOUS OPERATION AND THUS <br />THE BOOTH WILL NEED TO MAINTAIN OPERATIONAL STATUS WHEN USED BY PRODUCTION. <br />THE 40-51 FACILITY HAS BEEN USED FOR DECADES TO SPRAY HEAVY METAL PRIMER. PERSONAL <br />PROTECTIVE EQUIPMENT AND PROCEDURES MUST BE USED TO LIMIT EXPOSURES WITHIN APPROVED <br />LEVELS. THOROUGH SAFETY REVIEWS AND ESTABLISHED PROTECTIVE METHODS MUST BE <br />IMPLEMENTED PRIOR TO START OF WORK. <br />MECHANICAL SCOPE OF WORK <br />REMOVAL OF HEAT WHEELS FROM HEAT RECOVERY UNITS: <br />THE HEAT RECOVERY WHEELS IN EXISTING HEAT RECOVERY UNITS (HRU) HRU-1 AND HRU-2 WILL <br />BE REMOVED AND THE UNITS WILL BE BLANKED OFF TO SEPARATE THE SUPPLY AND EXHAUST AIR <br />STREAMS. THE STEAM HEATING COIL (HC-1) WILL ALSO BE REMOVED FROM BOTH HRU-1 AND <br />HRU-2, TO INCLUDE ADDITIONAL CAPACITY LOST THROUGH REMOVING THE HEAT RECOVERY WHEELS. <br />STRUCTURAL SCOPE OF WORK: <br />NEW CONDENSATE PIPE ROUTING WILL BE PROVIDED FROM HC-1 AT BOTH HRU-1 AND HRU-2. <br />THE PATH OF THIS NEW PIPING WILL CONTINUE TO THE MEZZANINE, WHERE THE STEAM TRAPS AND <br />OTHER PIPE ACCESSORIES WILL BE INSTALLED, BEFORE CONNECTING TO AN EXISTING MAIN. AN <br />EXTENSION OF THE EXISTING CATWALK WILL BE CREATED FOR MAINTENANCE ACCESS TO THE STEAM <br />TRAPS AND ACCESSORIES. <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE SYM <br />REVISION <br />BY <br />APPROVED <br />DATE C ACCEPTABILITY <br />�� of WAsy q� THIS DESIGN AND/OR <br />��` 4'c SPECIFICATION IS APPROVED <br />® w �P <br />a � APPROVED BY DEPT. DATE <br />' 329 4 <br />RF0/STE, <br />esslOVAL LNG\ <br />10.28.2022 <br />L M S <br />A <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />cHE( <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />ENGI <br />LMS <br />C <br />767 VERTICAL PAINT BOOTH - PHASE 2 PERMIT W5523782 <br />FSi <br />KMC <br />10.28.2022 <br />CHE( <br />DH <br />APPF <br />FB <br />AP P F <br />REV. <br />ORIGINAL ISSUE ORIG <br />f YET ISSUED FOR CONSTRUCTION <br />DRAWING REVISION - A <br />T IN THIS RELEASE SEE SPECIFIC DRAWING <br />FOR NATURE OF REVISION <br />THIS ISSUE <br />40-051-3S11 <br />40-051-S437 <br />40-051-S547 <br />INDEX <br />'E; <br />Cwner: <br />R®EING COMPANY <br />Tenant: <br />ROEING <br />App. Date: <br />10128/2022 <br />Proposed Use. <br />COMMERCIAL ALTERATION <br />Descriptions <br />767 VERTICAL PAINT BOOTH <br />PHASE 2 <br />Reviewed By6,%/ <br />Date: <br />V,Office Set <br />7y <br />Job Site Set Fire, <br />GENERAL_ NOTES <br />1. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO <br />PROCEEDING WITH THE WORK. <br />SCOPE OF WORK (SUMMARY) <br />THE PROJECT WILL ADDRESS THE RECURRING HEATING ISSUES WITHIN THE <br />767 VERTICAL PAINT BOOTH'S (BOOTH #1) PROCESS VENTILATION SYSTEM, <br />CODE DATA <br />LOCATION EVERETT, WASHINGTON <br />CODE: SEE STRUCTURAL SHEETS. <br />CITY OF EVERETT, CURRENT BLDG. REGULATIONS <br />ZONING: M2 <br />SEISMIC: ZONE 3 <br />DESIGN BY FSi/KPFF DATE 10.28.2022 <br />\TE I SUBTITLE <br />11.13.08 COVER SHEET - DRAWING INDEX <br />TMESE DOCUMENTS HAVE NOT BEEN <br />APPROVED FOR THE IS' IJAN <br />PUBLIC WORKS, ME:0HANI AL, FIRE <br />SUPPRESSION, LECTI I(3AIL (j <br />PLUMBING PERMITS, <br />El Plumbing <br />ecnicei <br />Electrical <br />I <br />Sprinkler <br />Fire Alarm <br />y Z 3 y <br />CURRENT REVISION SYMBOL DATE <br />W5523782 10.28.2022 <br />SHEET <br />11.13.08 TITLE 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />11.13.08BUILDING 40-051 Joe No. <br />11.13.08 <br />MECHANICAL MASTER EVERETT, WA DWG No. <br />VENTILATION <br />Planning Set <br />