Laserfiche WebLink
LEGEND <br />GENERAL NOTES <br />al I <br />+�a� 1 1. COORDINATE DISPOSAL WITH EHS. <br />❑ + \ \ 2. REMOVAL OF LINES REQUIRES REMOVAL AND REPLACEMENT <br />\° I OF TRENCH LIDS. TRENCH INCLUDES BOTH STEEL AND <br />i <br />CONCRETE LIDS. TAKE CAUTION NOT TO DAMAGE LIDS AND <br />\+ + �� REPLACE WJTH NEW GASKET MATERIAL. REMOVE <br />�� ACCUMULATED TRASH - NOT INCLUDING DEMOLITION DEBRIS <br />- FROM TRENCH AND DISPOSE, PROVIDE REQUIRED TRAFFIC <br />-tst — CONTROL AND PLANS FOR LID REPLACEMENT. <br />\\\ 3. REMOVE AND DISPOSE OF PIPE SUPPORTS ASSOCIATED WITH <br />4" PIW FRP PIPING WHEN NOT SHARED WITH OTHER LINES. <br />') SLY OL STORAGE \ V�4 \ \\ \\ <br />o ° = TAN EV 69 1 <br />�ANH'LE "c" ° <br />1 A� <br />A Au�4" PIW FRP —11 <br />° EV_25 (S45-03) — <br />° ° <br />0� N" ( - UST DIESEL <br />M170R E H.M170R ° �� R �� rN.17 .11 �— I <br />M170R EXH.M170R ° 4 <br />�-° ° ° w G E ❑ REMOVAL NOTES <br />OVERFLOW J17D-1 <br />SEE 45-001-M1R FOR REMOVAL IN 45-001 BLDG. <br />REMOVE APPROX. 1,100 FEET PIW 0700 4" FRP PIPING <br />I FROM EXTERIOR OF BLDG 45-001 TO INSIDE 45-06 <br />\— WATER TREATMENT PLANT. COORDINATE DISPOSAL WITH <br />° ° ° unurY TRENCH �' 4"P1 �Y �Ot BUIC a5 O1 8 BOEING ENS. <br />M170R EXH.M170R p I PIw F oM B GS �o-s1, 50 <br />�_ <br />6"F NAB�vE 3 M170R EXH.M770R Nsl p REMOVE APPROX. 1,100 FEET OF ABANDONED 6" FRP <br />2 3 ' Iw S.S. 40-031 "PLATING" LINE FROM INTERSECTION WITH PIW <br />° ° 0700 TOAINSIDE P45-06 WATER TREATMENT PLANT. <br />@ x COORDINATE DISPOSAL WITH BOEING ENS <br />j <br />4 nV40 ° )� � 3 E }rN LO �� A .2 BLDGE40 -51PLACE <br />INSIDE 45- O6 WATER REATMENTPIPING � FROM <br />45 59 <br />I o -- <br />T. <br />I F� <br />-Lx \ ✓ REMOVE LEAK DETECTION PER ELECTRICAL DEMOLITION <br />DRAWINGS. <br />° M170 t70R <br />o-X o x o � , e o o <br />/ \ <br />I ® 2 i o0 soy <br />° �° �x—X — x—x—X—x X-x x� —x—x—% �I� <br />� °� � �° ozo 1141 , 6 <br />06 07 -WRTir-1 <br />0 a 45-07 <br />20 21= 22 - 25 <br />° ' I EV-148-1 / j <br />213 <br />j �6� 7 O/W EV-13/ L <br />KEY PLAN <br />SCALE: NONE N <br />40 20 0 20 40 80 <br />SCALE: 1i40 <br />-- -- -- -- - -- -- -- -- -- -- -- ISSUED ®RCONSTRUCTION REMOVAKennedy/,Jenks Consultants <br />PARTIAL PLAN N 04-03�2020 32DD, 32 dA ED ego h,S I9800 <br />SCALE: 1" = 40' FederalwaV, -83 DBo00 <br />Ph. 253-835�6400 <br />Fax 253-9523435 <br />SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY <br />DRAWN ATE SOBv1 CURRENT REVISION SYMBOL DATE <br />04.03.20 <br />CIIDESIGN <br />AND/OR cN cK <br />L.INDUSTRIAL WASTE s''fiy ND SPECIFICATION IS APPROVED SHEET <br />® @ EN EER ME 17 <br />APPROVED BY DEPT. DALE <br />CHECKED �/qePy <br />27 2 APPROVED SITE 45- (�/ <br />D JOB NO. COMP M <br />��O APPROVED MECHANICAL MASTER EVERETT, WA DWG NO. 45-YD-M170R <br />