ABBREVIATIONS <br />GENERALSTRUCTURALNOTES <br />CODES AND REFERENCES: <br />2015 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC), WITH STATE OF WASHINGTON AND CITY OF <br />EVERL17 AMENDMENTS AND SUPPLEMENTED WITH ASCE 7-10. <br />ALL CODE REFERENCES HEREAFTER SHALL CORRESPOND TO THE FOLLOWING EDITIONS, U.N.O.: <br />MATERIAL CODE COTTON <br />CONCRETE <br />BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE <br />AND COMMENTARY, ACI 318-14. <br />CONCRETE (PRECAST) <br />7TH EDITION OF PCI DESIGN HANDBOOK: PRECAST AND <br />PRESTRESSED CONCRETE. <br />CONCRETE REINFORCING <br />CBS[ REINFORCING BAR DETAILING, 2015, <br />STRUCTURAL STEEL <br />141H EDITION OF STEEL CONSTRUCTION MANUAL (ACC <br />SCM) INCLUDING THE SPECIFICATION FOR STRUCTURAL <br />STEEL BUILDINGS AISC 360-10. <br />STRUCTURAL STEEL WELDING <br />STRUCTURAL WELDING CODE —STEEL, AWS D1.1-15. <br />STAINLESS STRUCTURAL STEEL WELDING <br />STRUCTURAL WELDING CODE —STEEL, AWS D1.6-17. <br />LOADS: <br />RISK CATEGORY = II <br />TRENCHES: <br />HS-20 TRUCK LOADING_ <br />SEISMIC: <br />IMPORTANCE FACTOR Ie = 1.0. <br />LATITUDE = 47.9237; LONGITUDE =—122.2765 <br />Ss = 1.446, S1 = 0.559, SEISMIC SITE CLASS = C. <br />Sds = 0,964, Sdt = 0.484, SEISMIC DESIGN CATEGORY = D. <br />ANALYSIS. PROCEDURE USED = EQUIVALENT LATERAL FORCE PROCEDURE. <br />FOUNDATIONS: <br />REFERENCE GEDTECHNICAL REPORT SUPPLIED BY TERRACON: JOB NO. 81115035; DATED JANUARY 17, <br />2012. SPREAD FOOTINGS AND MAT FOUNDATIONS SHALL BEAR ON A MINIMUM OF 6" OF ENGINEERED <br />FILL 18" MINIMUM BELOW FINISHED GRADE. ENGINEERED FILL SHALL MEET THE REQUIREMENTS OF <br />FOUNDATION MATERIAL CLASS A, AS DEFINED IN SECTION 9-03.17 OF THE WSDOT STANDARD <br />SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION. DESIGN SOIL BEARING VALUE _ <br />4,000 PST; MODULUS OF SURCEASE REACTION = 300 PSI. REFER TO GEOTECHNICAL REPORT FOR <br />ADDUIONAL INFORfOWHON PRIOR TO COMMENCEMENT OF EARTHWORK. <br />CONCRETE: <br />MINIMUM 28—DAY STRENGTH OF CONCRETE SHALL BE 4500 PSI <br />ALL CONCRETE CONSTRUCTION SHALL CONFORM TO ACI: MECHANICALLY VIBRATE ALL CONCRETE WHEN <br />PLACED, EXCEPT THAT SLABS ON GRADE NEED BE VIBRATED ONLY AT TRENCHES, FLOOR DUCTS, <br />TURNDOWNS, ETC. MAXIMUM SLUMP IS 4 1/'2" FOR CONCRETE WITHOUT PLASTICIZER. IF PLASTICIZER IS <br />USED, A HIGHER FINAL SLUMP MAY BE ALLOWED UPON STRUCTURAL ENGINEER'S APPROVAL. MAXIMUM <br />WATER/CEMENT RATIO (W/C) SHALL BE 0.45 FOR GENERAL CONCRETE. USE 1 1/2" MINUS COARSE <br />AGGREGATE FOR CONCRETE 6" THICK AND GREATER; USE 3/4" MINUS COARSE AGGREGATE FOR <br />THINNER SECTIONS. PROVIDE AIR ENTRAINMENT (5% } 1%) IN CONCRETE EXPOSED TO FREEZE —THAW <br />ACTION, <br />FLY ASH <br />FLY ASH,IF PERMITTED BY ENGINEER, SHAH BE LIMITED TO 18% OF CEMENTITIOUS MATERIALS AND <br />SHALL HAVE A REPLACEMENT FACTOR OF 1.2 RELATIVE TO CEMENT REPLACED. NO FLY ASH ADDITIVES <br />SHALL BE USED IN FLATWORK OR ARCHITECTURALLY EXPOSED CONCRETE. <br />REINFORCING STEEL FOR CONCRETE <br />USE ASTM A615, GRADE 60 (BY = 60 KSI), DEFORMED BARS FOR ALL BARS, NO TACK WELDING OF <br />REINFORCING BARS ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE WITH THE STRUCTURAL ENGINEER <br />ACI 318 SHALL APPLY. SUPPORT OF FOUNDATION REINFORCING MUST PROVIDE ISOLATION FROM <br />MOISTURE AND CORROSION <br />REINFORCINGBAR SPACING GIVEN ARE MAXIMUM ON CENTERS- ALL BARS SHALL BE PER AS SP-66. <br />DOWEL ALL VERTICAL REINFORCING TO FOUNDATION WITH STANDARD 90—DEGREE HOOKS, U.N.O. <br />SECURELY TIE ALL BARS IN LOCATION BEFORE PLACING CONCRETE. <br />LAP SPLICES IN CONCRETE: <br />LAP SPLICES, U.N.O., SHALL BE CLASS "B" TENSION LAP SPLICES PER ACI 318. STAGGER SPLICES A <br />MINIMUM OF (1) LAP LENGTH, <br />ALL SPLICE LOCATIONS SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER. PROVIDE BENT <br />CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT ALL CORNERS AND INTERSECTIONS PER <br />TYPICAL DETAILS. <br />REINFORCING STEEL COVER <br />ALL REINFORCING SHALL BE CHAIRED TO ENSURE PROPER CLEARANCES. CLEAR CONCRETE COVERAGES <br />AS FOLLOWS: <br />CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH' <br />3" <br />EXPOSED TO EARTH OR WEATHER <br />#6 OR LARGER . . . . .. . . .. . . .. .... . . .. .. . . <br />. . . . . . .. . 2„ <br />#5 OR LARGER- . . . .... ... . ... ... . . .. .... <br />. . .. . ... . 1 1/2" <br />SLABS NOT EXPOSED TO EARTH OR WEATHER <br />3/4" <br />ALL OTHER PER ACI 318. <br />rxn0miwnWrm <br />ALL ADHESIVE DOWELS SHALL HAVE CURRENT ICE APPROVAL FOP. MATERIAL INTO WHICH INSTALLATION <br />TAKES PLACE, SUCH AS HILTI HY200—R (ICC ESR-3187) OR APPROVED EQUIVALENT. <br />PRECAST CONCRETE: <br />REINFORCING SHOWN IN DETAIL IS FOR IN —PLACE CONDITION. CONTRACTOR SHALL BE RESPONSIBLE <br />FOR PICK UP POINT INSERTS AND LOCATIONS, SPECIAL PICK UP REINFORCING AND STRONG BACKS, <br />AND ALL PICK UP AND PLACING OPERATIONS. <br />DRYPACK: <br />DRYPACK SHALL BE 5,000 PSI NON —SHRINK GROUT, FIVE STAR OR EQUIVALENT. INSTALL DRYPACK <br />UNDER BEARING PLATES BEFORE FRAMING MEMBER IS INSTALLED. <br />CHEMICAL —RESISTANT COATING: <br />POLYSHIELD SS-100 OR OWNER APPROVED ALTERNATE SHALL BE USED AT TRENCH SURFACES. <br />PREPARE EXISTING AND NEW CONCRETE AND STEEL SURFACES ACCORDING TO MANUFACTURER'S <br />RECOMMENDATIONS_ APPLY PRIMER AND COATINGS PER MANUFACTURER'S RECOMMENDATIONS. <br />HYDROPHILIC WATERSTOPS: <br />HYDROPHILIC WATERSTOPS SHALL BE INSTALLED AT ALL BELOW —GRADE CONCRETE TRENCH JOINTS OR <br />INTERFACES. HYDROPHILIC WATERSTOPS SHALL BE 3/4" x 1" ARA SWELLSTOP OR APPROVED <br />EQUIVALENT. INSTALL HYDROPHILIC WATERSTOPS PER MANUFACTURER'S RECOMMENDATIONS. <br />JOINT SEALANTS: <br />JOINT SEALANTS SHALL BE SIKAFLEX —1C SL OR APPROVED EQUIVALENT POLYURETHANE JOINT <br />SEALANT. FOAM BACKING RODS SHALL COMPLY WITH WSDOT SPECIFICATION 9-08.8. INSTALL JOINT <br />SEALANT PER MANUFACTURER'S RECOMMENDATIONS. <br />STRUCTURAL STEEL: <br />ALL CONSTRUCTION SHALL BE PER AISC—SCM. <br />ALL STRUCTURAL STEEL SHALL BE AS FOLLOWS: <br />WIDE FLANGE STEEL A.STA. A992, GRADE 50 BY = 50 KSI <br />ALL OTHER STRUCTURAL STEEL SHAPES A.ST.M. A36 BY = 36 KSI <br />HIGH —STRENGTH BOLTS: <br />ALL HIGH —STRENGTH BOLTS SHALL CONFORM TO ASTM A325 AND SHALL BE INSTALLED AS <br />BEARING —TYPE CONNECTIONS WITH THREADS INCLUDED IN SHEAR PLANE H.E. A TYPE "N" CONNECTION). <br />HIGH —STRENGTH BOLTS SHALL BE SNUG —TIGHT, TYPICAL, U.N.O. AN INDEPENDENT TESTING LABORATORY <br />SHALL INSPECT ALL HIGH —STRENGTH BOLTING. <br />WELDING: <br />WELDERS HOLDING VALID WA.B.O. CERTIFICATES AND HAVING CURRENT EXPERIENCE IN THE TYPE OF <br />WELD SHOWN ON THE DRP,WINGS OR NOTES SHALL PERFORM ALL WELDING CERTIFICATES SHALL BE <br />THOSE ISSUED BY AN ACCEPTED TESTING AGENCY. <br />ALL WELDING DONE BY E70 SERIES LOW HYDROGEN RODS, U.N.O. ALL WELDING SHALL BE PER LATEST <br />AWS STANDARDS <br />THESE DRAWINGS DO NOT DISTINGUISH BETWEEN SHOP AND FIELD WELDS; THE CONTRACTOR MAY SHOP <br />WELD OR FIELD WELD AT THEIR DISCRETION. SHOP WELDS AND FIELD WELDS SHALL BE SHOWN ON <br />THE SHOP DRAWINGS SUBMITTED FOR REVIEW. ALL FULL/COMPLETE PENETRATION WELDS SHALL BE <br />TESTED AND CERTIFIED BY AN INDEPENDENT TESTING LABORATORY. <br />HEADED STUDS: <br />ALL REFERENCE TO HEADED STUDS SHALL BE AUTOMATIC WELDED HIGH —STRENGTH HEADED STUDS. <br />ATTACHMENT SHALL CONFORM TO ALL REQUIREMENTS OF AWS. CONFORMANCE SHALL INCLUDE, BUT NOT <br />BE LIMITED TO, ALL QUALITY CONTROL TESTING PROVISIONS OF THE AFOREMENTIONED PUBLICATIONS. <br />STEEL EMBEDS AT INTERIOR OF TRENCHES: <br />ALL STEEL EMBED PLATES AT INTERIOR OF TRENCHES SHALL BE STAINLESS STEEL (SS) ASTM 240 <br />TYPE 304L UNLESS NOTED OTHERWISE. <br />PROTECTIVE COATINGS FOR CARBON STEEL TRENCH EMBEDS: <br />ALL EXPOSED SURFACES OF CARBON STEEL EMBEDS AT TRENCHES SHALL RECEIVE POLYESTER POWDER, <br />COATING WNH A MINIMUM THICKNESS OF 3 MILS. USE POWDURA SUPER DURABLE TGIC POWDER <br />COATING OR APPROVED EQUIVALENT. APPLY PRIMER AND COATING PER MANUFACTURER'S <br />RECOMMENDATIONS. COORDINATE COLOR WITH OWNER. <br />FIELD REPAIR: FIELD REPAIR OF DAMAGED POLYESTER POWDER COATING SHALL BE DONE IN <br />ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. <br />HANDLING: AFTER SHOP FABRICATION AND COATING, STRUCTURAL STEEL MEMBERS SHALL BE HANDLED <br />WITH SUFFICIENT CARE TO MINIMIZE DAMAGE DURING SHIPMENT. SUFFICIENT DUNNAGE SHALL BE USED <br />TO PREVENT ANY RUBBING OF STEEL TO STEEL. <br />SYM REVISION _ BY I APPP.OVED DATE I SYM REVISION BY APPROVED DATE <br />I I SITE PUMPED INDUSTRIAL WASTE 20R08468I SI S BKL "D03.20 <br />SHOP DRAWINGS: <br />SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS. <br />THE CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS PRIOR TO SUBMITTAL. ITEMS NOT IN <br />ACCORDANCE WITH CONTRACT DOCUMENTS SHALL BE FLAGGED UPON CONTRACTOR'S REVIEW. <br />VERIFY ALL DIMENSIONS WUH OWNER, <br />MANUFACTURER OR FABRICATOR SHALL CLOUD ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM <br />CONTRACT DOCUMENTS. ANY OF THE AFOREMENTIONED WHICH ARE NOT CLOUDED OR FLAGGED BY <br />SUBMITTING PARTIES, SHALL NOT BE CONSIDERED APPROVED AFTER ENGINEER'S REVIEW, U.N.O. <br />THE ENGINEER HAS THE RIGHT TO APPROVE OR DISAPPROVE ANY CHANGES TO CONTRACT DOCUMENTS <br />AT ANY TIME BEFORE OR AFTER SHOP DRAWING REVIEW. <br />THE SHOP DRAWINGS DO NOT REPLACE THE CONTRACT DOCUMENTS. ITEMS OMITTED OR SHOWN <br />INCORRECTLY AND ARE NOT FLAGGED BY THE STRUCTURAL ENGINEER SHALL NOT BE CONSIDERED <br />CHANGES TO CONTRACT DOCUMENTS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ITEMS ARE <br />CONSTRUCTED TO CONTRACT DOCUMENTS. <br />THE ADEQUACY OF ENGINEERING DESIGNS AND LAYOUT PERFORMED BY OTHERS RESTS WITH THE <br />DESIGNING OR SUBMITTING AUTHORITY. <br />REVIEWING IS INTENDED ONLY AS AN AID TO THE CONTRACTOR IN OBTAINING CORRECT SHOP DRAWINGS. <br />CONTRACTOR HAS THE RESPONSIBILITY OF THE CORRECTNESS OF ALL APPROVAL DRAWINGS. <br />GENERAL: <br />THE STRUCTURAL CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT <br />INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES <br />NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, <br />BUT ARE NOT LIMITED TO BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. <br />THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, <br />TECHNIQUES, SEQUENCES OR PROCEDURE OF CONSTRUCTION, OR THE SAFETY PRECAUTIONS AND THE <br />PROGRAMS INCIDENT THERETO NOR SHALL OBSERVATION VISITS TO THE SITE INCLUDE INSPECTION OF <br />THESE ITEMS. <br />CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED CONSTRUCTION. LOAD SHALL <br />NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. <br />WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS OR MATERIALS, SUCH STANDARDS SHALL BE <br />THE LATEST EDITION AND/OR ADDENDA, U.N.O. <br />ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL, MECHANICAL, PLUMBING AND <br />ELECTRICAL WITH APPROPRIATE TRADES, CRAVINGS AND SUBCONTRACTORS PRIOR TO CONSTRUCTION. <br />OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE IF AN OPTION IS CHOSEN, CONTRACTOR SHALL BE <br />RESPONSIBLE FOR ALL NECESSARY CHANGES AND SHALL COORDINATE ALL DETAILS, <br />NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER, GENERAL STRUCTURAL NOTES AND <br />TYPICAL DETAILS. WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK <br />ON THE PROJECT. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS PRIOR TO START OF <br />CONSTRUCTION. RESOLVE ANY DISCREPANCY WITH THE OWNER. <br />TYPICAL DETAILS MAY NOT NECESSARILY BE CUT ON PLANS, BUT APPLY, U.N.O. <br />WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL STRUCTURAL NOTES AND/OR <br />SPECIFICATIONS, THE GREATER REQUIREMENTS SHALL GOVERN. <br />ANY ENGINEERING DESIGN, PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW, SHALL BEAR THE SEAL <br />OF A REGISTERED ENGINEER RECOGNIZED BY THE BUILDING CODE JURISDICTION OF THIS PROJECT. <br />SPECIAL STRUCTURAL INSPECTION: <br />SPECIAL INSPECTION IS TO BE PROVIDED FOR THE ITEMS LISTED BELOW IN ADDITION TO .THE <br />INSPECTIONS CONDUCTED BY THE BUILDING SAFETY DEPARTMENT. "SPECIAL STRUCTURAL INSPECTION" <br />SHALL NOT RELIEVE THE OWNER OR THEIR AGENT FROM REQUESTING THE CITY INSPECTIONS REQUIRED <br />BY DEC SECTION 110.3, SPECIAL INSPECTION IS REQUIRED PER SECTIONS 1704 AND 1705 FOR THE <br />FOLLOWING: <br />1. CONCRETE: <br />A) DURING THE TAKING OF TEST SPECIMENS. <br />B) DURING THE PLACEMENT OF ALL REINFORCED CONCRETE,. U.N.O. <br />C) VERIFICATION OF CURING TEMPERATURE AND TECHNIQUE (PERIODIC). <br />D) NO INSPECTION IS REQUIRED FOR SLABS ON GRADE. <br />2. PRECAST CONCRETE (IN ADDITION TO ABOVE): <br />A) DURING ERECTION OF PRECAST MEMBERS (PERIODIC). <br />3. BOLTS IN CONCRETE: <br />A) DURING THE PLACING OF CONCRETE AROUND BOLTS, <br />4. REINFORCING STEEL (PERIODIC): <br />A) DURING THE PLACING OF REINFORCING STEEL FOR ALL CONCRETE REQUIRED TO HAVE <br />SPECIAL INSPECTION NOTED ABOVE. <br />5. WELDING: <br />A) VISUAL INSPECTION OF ALL FIELD WELDS. <br />B) NON—DESTRUCTIVE TESTING OF ALL COMPLETE PENETRATION WELDS. <br />6, DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: <br />A) THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED TO BE CERTAIN IT <br />CONFORMS TO THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. <br />B) PER IBC SECTION 1704.2.4: THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS <br />TO THE BUILDING OFFICIAL AND TO THE ENGINEER OF RECORD. ALL DISCREPANCIES <br />SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF <br />UNCORRECTED TO THE DESIGN AUTHORITY AND THE BUILDING OFFICIAL. SUBMIT A FINAL <br />REPORT AS REQUIRED. <br />C) UPON COMPLETION OF THE ASSIGNED WORK, THE ENGINEER SHALL COMPLETE AND SIGN <br />THE APPROPRIATE FORMS CERTIFYING THAT, TO THE BEST OF THEIR KNOWLEDGE, THE <br />WORK IS IN CONFORMANCE WITH THE APPROVED PLANS, SPECIFICATIONS AND THE <br />APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE. <br />FOR ADDITIONAL INFORMATION ON SPECIAL STRUCTURAL INSPECTIONS, CONTACT STRUCTURAL ENGINEER <br />PRIOR TO START OF CONSTRUCTION. <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY I DEPT. I D <br />A.B.C. - <br />-AGGREGATE BASE COURSE <br />H/C <br />HOLLOW CORE <br />A F.F. <br />ABOVE FINISHED FLOOR, <br />HORIZ: <br />HORIZONTAL <br />ALT. <br />ALTERNATE <br />I.F.W; <br />INSIDE FACE OF WALL <br />A.B. <br />ANCHOR BOLT <br />I.E. <br />INVERT ELEVATION <br />BM <br />BEAM <br />K (KIP) <br />1,000 POUNDS <br />S F F. <br />BELOW FINISHED FLOOR <br />L.L. <br />LIVE LOADS <br />B.O.B. <br />BOTTOM OF BEAM <br />LBS ffl <br />POUNDS <br />B.O,D. <br />BOTTOM OF DECK <br />L.L.H. <br />LONG LEG HORIZONTAL <br />PC F. <br />BOTTOM OF FOOTING <br />FLA. <br />LONG LEG VERTICAL <br />B.O.P. <br />BOTTOM OF PLATE <br />MFR('S) <br />MANUFACTDRER('S) <br />B.OS. <br />B070M OF STEEL <br />HAS. C.J. <br />MASONRY CONTROL JOINT <br />BRG <br />BEARING <br />MECWL <br />MECHANICAL <br />C.I.P. <br />CAST —IN —PLACE <br />N/A <br />NOT APPUCABLE <br />C.L. <br />CENTERLINE <br />TUTS <br />N0T TO SCALE <br />C.L.B. <br />CENTERLINE OF BEAM <br />O.C. <br />ON CENTERS <br />C.L.C. <br />CENTERLINE OF COLUMN <br />O.F.W. <br />OUTSIDE FACE OF WALL <br />C.L.F. <br />CENTERLINE OF FOOTING <br />OPP. <br />OPPOSITE <br />C.L.W. <br />CENTERLINE OF WALL <br />P.C. <br />PRE —CAST CONCRETE <br />GILD <br />CLEAR <br />P.L.F. <br />POUNDS PER LINEAR FOOT <br />CONC. <br />CONCRETE <br />PREFAB <br />PRE —FABRICATED <br />CONC, CA. <br />CONCRETE CONTROL JOINT <br />P.S.F. <br />POUNDS PER SQUARE FOOT <br />GONG. S.J. <br />CONCRETE SAWCUT JOINT <br />P.S.I. <br />POUNDS PER SQUARE INCH <br />C.M.U. <br />CONCRETE MASONRY UNIT <br />P,EINF. <br />REINFORCING <br />CONN. <br />CONNECTION <br />SL.H. <br />SHORT LEG HORIZONTAL <br />CONT. <br />CONTINUOUS <br />SLV. <br />SHORT LEG VERTICAL <br />D.L. <br />DEAD LOAD <br />SUM. <br />SIMILAR <br />DIA. <br />DIAMETER <br />SO. <br />SQUARE <br />DO <br />DOWN <br />STD <br />STANDARD <br />DWG(S) <br />DRAWINGS) <br />T.L. <br />TOTAL LOAD <br />E.O.S. <br />EDGE OF SLAB <br />T.O.B. <br />TOP OF BEAM <br />El. <br />ELEVATION <br />T.O.D, <br />TOP OF DECK <br />E0. <br />EQUAL <br />T.O.F. <br />TOP OF FOOTING <br />EQUIP. <br />EQUIPMENT <br />T.O.G. <br />TOP OF GRATING <br />EXP. <br />EXPANSION BOLT <br />T.O.L. <br />TOP OF LEDGER <br />EXP. JT. (E.J.) <br />EXPANSION JOINT <br />T.O.M. <br />TOP OF MASONRY <br />E.W. <br />EACH WAY <br />T.O.P. <br />TOP OF PLATE <br />F.F. <br />FINISHED FLOOR <br />T.O.S. <br />TOP OF STEEL <br />F.O.M. <br />FACE OF MEMBER <br />T.O.W. <br />TOP OF WALL <br />F.05. <br />FACE OF STEEL <br />TYE. <br />TYPICAL <br />F.O.W. <br />FACE OF WALL <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />GA. <br />GAUGE <br />VERT. <br />VERTICAL <br />GALV. <br />CON <br />GALVANIZED <br />GENERAL STRUCTURAL NOTES <br />WSTP <br />W.W.R. <br />'NATERSTOP <br />WELDED WIRE REINFORCEMENT <br />SITTS & HILL <br />ENGINEERS, INC. <br />CIVIL • STRUCTURAL • SURVEYING <br />PNoxE•:ElzesU aza-sane 1 Ax�olrz al aa>a�me9 <br />Project No.: 17659 Project Mgr.: BKL <br />Proj. Engineer: EMF Proj. Drafter: JDK <br />GENERALSTRUCTURALNOTES <br />JMPED INDUSTRIAL WASTE <br />SITE 45-YD POE NO <br />04.03.20 <br />EVERETT, WAI-"- -' 45-YD-S2F-4 <br />