Laserfiche WebLink
REINFORCING STEEL <br />1 REINFORCING STEEL SHALL BE DETAILED, INCLUDING HOOKS AND SENDS, AIND <br />PLACED IN ACCORDANCE WITH ACI 315 AND ACI 318. <br />2. REINFORCING STEEL SHALL CONFORM TO ASTM A-615 OR A-706, GRADE 60. <br />3. WELDED TORE FABRIC SHALL CONFORM TO ASTM A-185. <br />4� -THE FOLLOWING SHALL BE USED IN CONCRETE BUILDING STRUCTURES: <br />A. THE ACTUAL- YIELD STRENGTH BASED ON MILL TESTS SHALL NOT EXCEED <br />THE 'SPECIFIED YIELD STRENGTH 13Y MORE THAN 18,000 PSI. RETESTS <br />SHALL NOT EXCEED THIS VALUE BY MORE THAN AN ADDITIONAL .3000 PSI� <br />8. THE RA310 OF THE ACTUAL ULTIMATE TENSILE STRESS TO THE ACTUAL <br />TENSILE YIELD STRENGTH SHALL NOT BE LESS THAN 1�25� <br />5. ALL, REINFORCING BAR BENDS SHALL BE MADE COLD. BARS SHALL NOT B,',-- <br />RE-43EN1 <br />6. REINFORCING SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. <br />7. WELDED WARE FABRIC SHALL- BE LAPPED AT SPLICES SUCH THPT A MINIMUM OF <br />THREE YPRES PARALLEL TO THE SPLICE AIRE OVERLAPPED. SPLICES SHALL <br />OVERLAP A M101MUM OF- 8 INCHES. <br />DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME <br />GRADE, SIZE AND SPACING AS THE VERTICAL REINFORCING, RESPECTIVELY, <br />UNLESS OTHERWISE NOTED. <br />9. PROVIDE #4 x 0-0' DIAGONAL BAR AT ALL REENTRANT CORNERS OF CONCRETE <br />SLABS ON GRADE AND SLABS ON METAL- DECK. <br />!0 NO BARS PARTIALU'( EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT <br />UNLESS SPECOFICALL1 SO DETAILED AND REVIEWED BY THE STRUCTURAL <br />ENGINEER. <br />'I I WELDING OF' REIN FORCEMENT SHALL CONFORM TO THE 2005 EDITION OF AWS <br />D1.4 "STRUCTURAL WELDING CODE -REINFORCING STEELA WELDED CONNECTIONS <br />NOT SPECIFIED ON THE PLANS "--)HALL BE ISUBMI-FTED FOR REVIEW AND APPRO'vAL <br />BY THE STRUCTURAL ENGINEER. <br />1 On REINFORCING TO BE WELDED SHALL CONFORM TO ASTM A-706, BARS <br />CONFORMING TO ASTM A-415 MAA1 13E SUBSTITUTED PROVIDED THAT <br />DOCUMENT/AkTION IS SUBMITTED -TO THE STRUCTURAL ENGINEER FOR REVIEW <br />SHOWING THAT THE BARS FUL1Y CONFORM TO THE WELDABILITY REQUIREMENTS <br />OF AWS 0-1.4. <br />11 REINFORCEMENT SHALL BE SECURELY TIED IN PLACE PRIOR TO THE PLACEMENT <br />OF CONCRETE OR GROUT. CONCRETE REINFORCEMENT OF SHALL- BE SECURED <br />IN CONFORMANCE WITH ACI-3118 SECTION 7.5. MASONRY REINFORCEMENT SHALL <br />BE SECURED IN CONFORMANCE WITH ACI-3,50.1 SECTION 14. <br />14� REINFORCING STEEL PROJECTING FROM THE CONCRETE OR MASONRY AND <br />CONNECTING DIRECTLY TO STRUCTURAL STEEL WHERE DIMENSIONAL CONTROL IS <br />CRITICAL OR WHERE. SPECIFICALLY P40TEED ON THE PLAN SHALL BE TREAVTIED AS <br />AN ANCHOR ROD AND SHALL CONFORM TO THE TOLERANCES SPECIFIED 11\1 <br />SECTION 7.5 OF AISC 30-.3--05 "CODE OF STANDARD PRACTICE FOR STEEL <br />BUILDINGS AND BRIDGES". <br />CONCRETE <br />1. ALL CONCRETE CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE <br />BUILDING CODE AND ACI SPECIFICATIONS. <br />2. CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF THE PROJECT <br />SPECIFICATIONS IN ADDITION TO -THE REOUIREMENTS IN THESE DRAWINGS. <br />WHERE THE SPECIFICATIONS APPEAR TO CONFLICT WITH THE REQUIREMENTS IN <br />THESE DRAWINGS, THE CONTRACTOR SHALL OBTAIN CLARIFICATION FROM THE <br />ARCH ITECT/STRUCTU RAL ENGINEER BEFORE PROCEEDING WITH WORK. <br />3. CONCRETE SHALL CONFORM TO THE STRENIGTH, WATER -CEMENT RATIO, EXPOSURE <br />CLASS, MAXIMUM UiNIT WEIGHT AND CEMENT TYPE SPECIFIED IN THE TABLE <br />BELOW� CONCRETE STRENGTHS SHALL BE VERIFIED BY 28-DNY CYLINDER TESTS. <br />ELEMENT f , c MAX W/C EXPOSURE MAX UNIT CEMENT <br />P �15 I R AT 10 C Gt\ S S WEIGHT TYPE <br />ALL CONCRETE 4,500 0.45 C1,S2 -145 1 OR 11 <br />EXPOSURE CLASSES ARE F% SO, PO, CO UNLESS NO -FED OTHERWISE IN THE <br />TABLE ABOVE. <br />TOTAL WATER IN CONCRETE FOR SLABS ON GRADE SHALL NOT EXCEED 285 <br />LBS PER CUBIC YARD. <br />4. CONCRETE MIXES SHALL COMPLY WITH ACI 318 SECTION 4.3 FOR TIHIE EXPOSURE <br />CLASSES INDICATED THE TABILE ABOVE, FOR CLASSES F1 THROUGH F3, /AfR <br />ENTRAINMENT SHALj_ MEET THE REOUIREMENTS OF ACI­318 TABLE 4.4.1. <br />5. PORTILAND CEMENT SHALL CONFORM -TO ASTM C­150 OF -THE TYPE SPECIFIED IN <br />THE TABLE ABOVE. <br />6� COARSE AND FINE AGGREGATE FOR NORMAL WEIGHT CONCRETE SHALL CONFORM <br />TO ASTM C­3.3, <br />7. AGGREGATE FOR LIGHTWEIGHT CONCRETE SHALL CONFORM TO ASTM C-3.30, <br />CONCRETE CONT. <br />8. WATER SHALL BE CLEAR AND SHALL CONFORM TO AsTm C­994. <br />9. CONCRETE MIXING OPERATIONS SHALL CONFORM TO ASTM C­94. <br />1 (1 CONTRACTOR MAY USE AN ADMIXTURE SYSTEM TO PRODUCE FLOWABLE <br />CONCRETE. MAXIMUM SLUMP SHALL NOT EXCEED 8 INCHES MEASURED AT THE <br />PUMP. THE WATER/CEMENTIOU. MATERIAL RATIO 0;F THE APPROVED MIXES <br />SHALL BE MAINTAINED OR LOWERED WHEN FLOWABLE CONCRETE IS USED. A <br />REPRESENTATIVE OF THE ADMIXTURE SYSTEM SHALL ASS'l-ST IN DETERMINING <br />PROPORTIONS FOR FLOWABLE CONCRETE AND SHALL BE REVIEWED BY THE <br />STRUCTURAL ENGINEER AND ARCHITECT PRIOR -TO EMPLOYING THIS PROCEDURE. <br />SEE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENIT& <br />11 THE FOLLOWING MINIMUM CONCRETE COVER SHAL-L BE PROVIDED FOR <br />REINFORCEMENT PLACED IN CAST-IN--PI_ACE CONCRETE: <br />CONCRETE <br />COVER <br />(MINIMUM' ) <br />A. CONCRETE CAST AGAINST AND PERMANENT& EXPOSED TO EARTH: 3" <br />B. CONCRETE EXPOSED TO EARTH OR WEATHER: <br />116 THROUGH #18 BARS 2 <br />-Tf <br />#5 BAR, W31 OR D31 WIRE, AND SMALLER 1 1 /2 <br />C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUOIID: <br />SLABS, WALLS, JOISTS: <br />#14 AND #10 BARS 1 1/2'' <br />#11 BARS AND SMALLER 3/43Y <br />BEAMS, COLUMNS3: <br />PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS 1 1 /2 <br />SHELLS, FOLDED PLKFE MEMBERS: <br />#6 BAR AND LARGER 3/4-2 <br />#5 BAR, W& OR D31 WIRE, AND 'SMALLER i /2 <br />10n BASE PLATE GROUT SHALL BE NON -SHRINK TYPE CONFORMING TO AS_FM <br />(2-11097 WITH A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 7000 PSI. <br />13. PLACEMENT OF CONCRETE SHALL CONFORM TO ACI REQUIREMENTS AND TrHE <br />CONTRACT DOCUMENTS. SANDBLAST ALL CONCRETE SURFACES AGAINST WHICH <br />CONCRETE IS TO BE PLACED, UON. <br />14-. FORMS FOR CONCRETE SHALL BE" LjWD OUT AND CONSTRUCTED TO PROVIDE THE <br />SPECIFIED CAMBERS SHOWN ON THE DRAWINGS, <br />15. THE CONTRACTOR SHALL MAINTAIN A LOG OF STRUCTURAL SLA 8 ELEVATIONS <br />BASED ON -THE STRUCTURAL DRAVANGS PLUS THE ADDITION OF ANY CAMBERS <br />INDICATED ON THE CONSTRUCTION DOCUMENTS, THIS LOG SHALL INDICATE <br />SCREED EIEVA-TIONS PRIOR TO THE CONCRETE POUR AND TOP OF CONCRETE <br />SLAB PPJOR TO REMOVAL OF FORMS. <br />16� PROJECTING CORNERS OFF BEAMS, WALLS, COLUMNS, ETC., SHALL BE FORMED <br />WITH A 3/4 INCH CHAMFER, UNLESS OTHERWISE NOTED ON THE STRUCTURAL <br />DRAWINGS. <br />17� PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL OPENINGS 1N CONCRETE <br />BEFORE PLACING, FlEI14FORCING SHALL NOT BE CUT. CORING OF CONCRETE IS <br />NOT PERMITTED EXCEPT AS INDICATED� <br />18. CONDUIT OR PIPE OUTSIDE DIAMETER SrHALL NOT EXCEED ONE THIRD OF THE <br />SILAB TIHICKNESS AND SHALL BE PLACED BETWEEN THE TOP AND BOTTOM <br />REINFORCING, UNLESS SPECIFICALLY DETAILED OTHERWISE, CONDUITS SHALL BE <br />SPACED SUCH THAT THE CLEAR DISTANCE BETWEEN IS NOT LESS THAN THE <br />LARGER OF THREE TIMES THE LARGER PIPE DIAME:FER OR FOUR INCHES. <br />CO, -RATIONS OF CONDUrr NOT MEETING THESE LIMIT Tno S SHALL BE <br />C NCENI A N <br />SUBMITTED TCO THE STRUCTURAL ENGINEER FOR REVIEW AND APPROVAL PRIOR 1-0 <br />PLACEMENT, <br />SPECIAL INSPECTION <br />1, SPECIAL INSPECTION BY A REGISTERED OEPUTFt BUILDING INSPECTOR, IN <br />CONTRACT' WITH THE OWNER AND APPROVED BY THE BUILDING OFFICIAL, SHALL <br />BE REQUIRED FOR THE FOLLOWING TYPES OF WORK (SEE THE PROnJECT <br />SPECIFICATIONS FOR FURTHER REQUIREMENTS): <br />ITEM BUILDING CODEE <br />REFERENCE <br />CONCRETE 1704.7 <br />SOIL 17017 <br />SPECIAL SYSTEMS- 17051.1 <br />EXPANSION/EPDXY ANCHOR DOLTS <br />2. SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHEN THE WORK IS DONE ON <br />FHE PREMISES OF A FABFACATOR REGISTERED AND APPROVED BY 'THE BUILDIING <br />OFFICIAL TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. CERTIFICATES <br />OF COMPLIANCE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FROM THE <br />FABRICATORS OR MANUFACTURERS OF THE FOLLOWING COMPONENTS: <br />STRUCTURAL STEEL <br />SAY <br />,RiG <br />REVISION <br />45-004 MISCELLPANEOUS SYSTEMS 1786915 <br />_R(� -1 <br />ca <br />t <br />�W�OVEW <br />EO <br />rVf E SUM <br />DX <br />121911 <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SPECIAL INSPECTION CONT. <br />3. EPDXY OR EXPANSION TYPE ANCHORS S11ALL BE APPROVED BY THE BUILDING <br />OFFICIAL FOR THEIR USE AND SHALL BE INSTALLED ACCORDING 1-0 THE <br />MANUFACTURER'S RECOMMENDATIONS AND !CC PRODUCT APPROVAL CONDITIONS1 <br />4. NONDESTRUCTIVE INSPECTION OF ALL WELDS, SHOP AND FIELD, OF <br />MOMENT --RESISTING FRAMES 'SHALL BE PROVIDED IN ACCORDANCE WITH THE <br />GOVERNING CODE. <br />1 SUMMARY REPORTS OF ALL INSPECTIONS AND TEST RESULTS SHALL BE <br />DISTRIBUTED TO THE OWNER, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL <br />WITH DEFICIENCIES CLEARLY NOTED. <br />6� DEFICIENCIES SHALL BE REPORTED TO THE CONTRACTOR ON A DAILY BASIS. <br />DEFINITIONS OF SPECIAL INSPECTIONS AND TESTING FREQUENCY: <br />A. (PER) PERIODIC OBSERVATION OF WORK REOUIRING SPECIAL INSPECTION <br />BY AN APPROVED SPECIAL INSPECTOR. WHO IS PRESENT IN THE AREA <br />WHERE THE WORK HAS BEEN OR 15; BEING PERFORMED AND AT THE <br />COMPLETION OF THE WORK. <br />B. (CONT) CONTINUOUS OBSERVAFION OF WORK REQUIRING SPECIAL <br />INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN <br />THE AREA WHERE THE WORK IS BEING PERFORMED. <br />STRUCTURAL OBSERVATION <br />1. STRUCTURAL OBSERQTION IS; REQUIRED FOR THE STRUCTURAL SYSTEM IN <br />ACCORDANCE WITH THE GOVERNING CODE. STRUCTURAL OBSERVATION IS THE <br />VISUAL OBSERVATION OF- THE EIEMENTVS AND CONNECTIONS OF THE STRUCTURAL <br />SYSTEMS AT SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED <br />STRUCTURE FOR GENERAL CONFORMANCE -TO THE APPROVED PLANS AND <br />SPECIFICATIONS. STRUCTURAL 08r��`,FRVATION DOES NOT WAIVE JFHE RESPONS��IBILITY <br />FOR THE INSPECTIONS REQUIRED OF THE BUILEANG INSPECTOR OR THE" DEPUTY <br />INSPECT01 <br />2� THE OWNER SHALL EMPLOY AN ENGINEER LICEN-::ED TO PERFORM STRUCTURAL <br />OBSERVATION IN THE PROJECT JURISDICTION. <br />3, THE STRUCTURAL OBSERVER SHALL PROVIDE A LETTER To BE SUBMITTED TO THE <br />BUILDING OFFICIAL, AS REQUIRED BY THE JURISDICTION, BEFORE 'THE FIRST SITE <br />VISIT. THE STRUCTURAL OBSERVER SHALL ALSO INFORM THE OWNER OF THE <br />REQUIREMENTS FOR A PRECONSTRUCTION MEETING AND SHALL PRESIDE OVER <br />[HIS MEETING. <br />4, THE OWNER OR OWNEFVS REPRESENTATIVE SHALL COORDINATE COMMUNICATION <br />BETWEEN THE EKKANEER OR ARCHITECT RESPONSIBLE FOR 'THE STRUCTURAL <br />DESIGN, STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND <br />SPECIAL INSPECTORS, THE PURPOSE OF THIS COMMUNICATION SHALL BE TO <br />IDENTIFY THE MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT <br />THE VERTCAL AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW <br />SCHEDULING OF THE REQUIRED OBSERVATIONS. <br />5. REPORTS SHALL BE ISSUED FOR EACH STRUCTURAL OB'S)ERVA;rION AND ISSUED <br />TO THE OWNER, ARCHITECT, CONTRACTOR AND BUILDING OFFICIAL, A RECORD <br />OF THE PRECONSTRUCTION MEETING NOTED ABOVE SHALL BE INCLUDED IN THE <br />FIRST OBSERVATION REPORT, <br />6. THE CONTRACTOR SHALL SCHEDULE EACH OBSERVATION AT LEAST TWO WEEKS <br />PRIOR TO DATE OF THE PROPOSED OBSERVATION, <br />7. 'THE STRUCTURAL OBSERVER SHALL PERFORM OBSERVATIONS AT THE FOLLOWING <br />SIGNIFICANT CONSTRUCTION STAGES: <br />(CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE OBSERVED: <br />k AT SUBSTANTIAL COMPLETION OF THE PRIMARY STRUCTURE <br />SUBMITTALS <br />1. THE FOLLOWING ITEMS SHALL BE SUBMITTED -TO THE STRUC-11-URAL ENGINEER FOR <br />REVIEW AND APPROVAL PRIOR TO FAB R ICATI OIN/ FIR ECTIO N/I NSTALLATI ON. THESE <br />ITEMS ARE IN ADDITION TO ANY SUBMITTAL REQUIREMENTS SPECIFIED ON THESE <br />PLANS OR IN THE PROJECT SPEC! FIC,1VFIONS. <br />STRUC-11-URAL SUBMITTALS <br />1TEINVI <br />PROD <br />SHOP <br />TEST <br />CALCS <br />BLDG <br />DATA <br />DWGS <br />RESULTS <br />1) E PT <br />CONCRETE <br />YES <br />YES <br />GROUT <br />YES <br />["EPDXY AND EXP ANCHORS <br />YES <br />On "PROD DATA" - SUBMIT ADEQUATE DOCUMENTATION THAT THE PRODUCT <br />PROPOSED TO BE USED MEETS THE" REOUIREMENTS ON THESE PLANS AND THE <br />PROJECT SPECIFICAT IONS. <br />g-, (&A <br />mma a <br />gv <br />ffim N 1_7 <br />We <br />1 4 A-A-101 cal aw <br />Imill <br />V i <br />ACCEFFABILITY 'R� REEVES <br />I <br />THIS DESIGN AND/OR T-1 ED <br />SPECIFICATION IS APPRO E J� VOLKMAN <br />EIN INE�� <br />ON F_D;�l J - VOLKIMAN <br />CHECKED <br />E. OJALA <br />Al�l SU BTITLE <br />12.0U1 <br />IZ0121 <br />TIME <br />12-09.21 <br />1ZOU-1 <br />STRUCTURAL MASTER <br />SUBMI-91-ALS CONT <br />3, "SfHOP DWGS" --- SUBMIT COMPLETE SHOP DRAWINGS SUFFICIENT -TO SHOVY, <br />QUANTITIES AND KINDS OF MATERIALS, METHODS OF ASSEMBLY, AND ALI.- DATA <br />REQUIRED FOR FABRICATION, ERECTION, AND INSTALLATION. THE PURPOSE OF <br />TI-IESE- DRAWINGS IS TO DEMONSTRATE THAT THE CONTRACTOR UNDERSTANDS THE <br />DESIGN CONCEPT DOCUMENTED HEREIN, SUBMITTALS CONSISTING OF DRAWINGS <br />TA,KEI,j DIRECTLY FROM THESE PLANS TOLL NOT BE APPROVED. IF' DEVIA'TIONS, <br />DISCREPANCIES OR CONFLICTS BETWEEN SHOP DRAWING SUBMITTALS AND THE <br />CONTRACT DOCUMENTS ARE EASCOVERED, EITHER PRIOR TO OR Af'FER REVIEW BY <br />THE STRUCTURAL ENGINEER, THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL <br />CONTROL AND SHALL BE FOLLOWED. RESPONSIBILITY FOR ADHERENCE 1-0 THE <br />CONTRACT DOCUMENTS UES SOLELY WITH THE! CONTRACTOR. DIMENSIONS AND <br />QUANTITIES ARE NOT REVIEWED BY THIE STRUCTURAL ENGINEER AND THEREFORE <br />MUST BE VERIFIED BY THE CONTRACTOR. <br />4� "TEST RESULTS" - SUBMIT RESULTS FOR ANY TESTING REQUIRED BY BUILDING <br />CODE OR THESE PLANS, <br />5. "CAL -CS" - SUBMIT SIGNED AND SEALED PREPARED BY A DESIGN PROFESSIONAL <br />AUTHORIZED TO PERFORM WORK IN THE PROJECT JURISDICTION. CALCULATIONS <br />SHALL INDICATE THE MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE <br />BASIC STRUCTUREF. THE COMPONENT DESIGNER SHALL BE RESPONSIBLE FOR <br />CODE CONFORMANCE AND &L NECESSARY CONNECTIONS NOT SPECIFICALLY <br />CALLED OUT ON THE ARCHITECFURAL AND STRUCTURAL DRAWINGS. <br />"BLOG DEPT" - IF CHECKED, THE SUBMITTALS SHALL BE REVIEWED, AND <br />APPROVED BY 'THE I UILDING OFFICIAL PRIOR TO FABRICATION AND/OR <br />INSTALLATION. <br />7. THE CONTRACTOR SHALL REVIEW, STAMP AND APPROVE SUBMITTALS PRIOR TO <br />REVIEW BY THE STRUCTURAL ENGINEER. UNREVIEWED OR UNSTAMPED SUBMITTALS <br />WILL BE RETURNED TO THE CONTRACTOR UNREVEWED. <br />8. THE CONTRACTOR SHALL ALLOW TWO WEEKS FOR REVIEW OF SUBMITTALS, <br />COMMENTS OF! MARKS ON SUBLITTALS ARE A NORMAL AND EXPECTED PART OF <br />THE SUBMITTAL PROCESS AND SHALL NOT BE USED AS A BASIS FOR CHANGE <br />ORDERS. TIME REQUIRED TO REVISE AND RESUBMIT ANY SUBMITTAL SHALL BE <br />CONSIDERED INHERENT IN THE TO THE SUBMITTAL REVIEW PROCESS AND SHALL <br />NOT BE DEEMED A CHAINGE ORDER. <br />9. RESUBMITTALS SHALL HAVE ALL REVISIONS CLEARLY IDENTIFIED WITH DRAWING <br />CLOUDS AND REVISION DATES. TIHE STRUCTURAL ENGINEER SHALL NOT BE <br />RESPONSIBLE FOR THE REVIEW OF ANY UNMARKED REVISIONS. <br />10� CONTRACTOR REOUESTED CHANGES OF? SUBSTITUTIONS SHALL BE SUBMITTED IN <br />WRITING TO THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TOFABRICATION <br />OR CONSTRUCTION. CHANGES SHOWN (ON SHOP DRAWINGS ONLY WILL NOT <br />SATISFY THIS REQUIREMENT. CONTRACTOR WILL BE RESPONSIBLE FOR ANY <br />ADDITIONAL ENGINEERING EFFORT AND ASSOCIATED FEES REQUIRED FOR REVIEW <br />AND APPROVAL OF REQUESTED CHANGES AND SUBSTITUTIONS, <br />POST INS-117'\LLED ANCHORAGE <br />i. ADHESIVE ANCIHORAGES, WHERE SPECIFIED ON THE DRAWINGS, SHALL CONFORM <br />TO THE FOLLOWING: <br />A. CONCREjE EPDXY AkICIHORS: HILTI HIT --RE 500-SD ESR-2._322 <br />& GROUTED REINFORCED <br />CMU EPDXY ANCIHORS: 1-1111131 HIT-IHY 70 ESR-2682 <br />C, UNREINFORCED OR UNGROUTED <br />MASONRY EPDXY ANCHORS HILTI HIT-HY 70 ESR-2682 <br />2. MECHANICAL- ANCHORAGES, WHERE SPECIFIED ON THE DRATOINGS, SHALL <br />CONFORM TO THE FOLLOWING: <br />A, CONCRETE EXPANSION ANCHORS: HILTI KWIK BOLT Tz ESR--- 19 17 <br />0 CONCRETE UNDERCUT ANCHORS: 11ILTI HAD ESR-- 1546 <br />C. GROUTED REINFORCED <br />CMU EXPANSION ANCHORS: HILTI KWIK BOLT 3 ESR- 1 .385 <br />3. DRILL-ING SHALL BE PERFORMED WITH A ROTARY HAMMER [)Ed[-[- AND CARBIDE <br />TIPPED DRILL BIT IN ACCORDANCE WITH THE MANUFA(,TURER'S INSTRUCTIONS <br />AND THE APPLICABLE ICC EVALUATION REPORT. <br />4. BORE HOLE CLEANING PROCEDURES MUST COMPLY WITIH THE MANUFACTURER'S <br />INSTRUCTIONS AND THE APPLICABLE ICC EVALUASION REPORT IN ORDER TO <br />PRODUCE A DRY, DUST -FREE HOLE. <br />5. INJECTION OF ADHESIVE SHALL BE PERFORMED It! ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS AND THE APPLICABLE ICC EVALUATION REPORT 11\1 <br />ORDER TO PRODUCE AN AIR -VOID FREE INJECTION. <br />6. SPECIAL CONDITIONS SUCH AS WATER SATURATED CONCRETE, wATER-FILIED <br />HOLES, UNDERWATER AND OVERHEAD INSTALLATIONS MUST BE APPROVED BY 'THE <br />ENGINEER OF RECORD AND COMPLY WITH THE APPLICABLE ICC-ES REPORT. <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />A 1 <br />2.094, U <br />Em. - Im, I iw 1, <br />3 <br />rDj' ri <br />rn <br />J%, <br />c rm u r AN <br />!`3'T R U C`��,T U FR L N 0 T E S <br />45-004 MISCELLANEOUS SYSTEMS <br />BUILDING 45-004 <br />m"M <br />,h M, - 3 1 - � - Im <br />S-_ ft <br />MEMO WIN <br />701r, <br />I al <br />m <br />WIMP <br />1101 2nd Ave., SLfite 400 1 Seaitla, VVA 98101 <br />ph 206.623.0717 1 f�m 20S.624,3776 <br />coffinamcfAn <br />LASTING <br />CURRENT REVISION � SYNISO, DATE <br />17 8 6 915 7nmc) 12�O9�21 <br />- V'-A <br />JOB NO. COMP NO. <br />1786915 <br />EVERETT, WAF"c' "10- ___4 _00-0 4 - S 2 0 - 2 <br />'19 M 0 (T) I <br />