Laserfiche WebLink
9 <br />LEVEL 5 FLOOR <br />LEVEL 4 FLOOR 9 <br />LEVEL 2 FLOOR <br />6I 6 i Jot <br />1 <br />60x20 <br />141 /43 SECTIO <br />�J&I <br />I <br />41 /43 SECTION 41 /43 SECTION <br />MAJOR ASSEMBLY MAJOR ASSEMBLY <br />— UNIT 2 — UNIT 1 <br />-SECTION B <br />SCALE: 1 /8"= V —0" M520M520 <br />l___li <br />SYM REVISION BY APPROVED DATE I SYM <br />0 RRO — 767 RATE INCREASE AFT SI — IF�EVE-13-30055-601) DCS I KMB 08/16/19 <br />LEGEND <br />z, <br />1 45 5 <br />z <br />I <br />i SEE DWGS <br />? FOR BUILDING ( I I 40-033 FOR <br />DETAILS <br />S <br />I <br />I <br />! I a I I <br />GENERAL MOTES <br />i 1. ALL ABOVE GROUND CIC DUCTWORK IS SPRINKLERED. SEE <br />CRANE ; i FIRE PROTECTION DRAWINGS. PROVIDE WATER PRESSURE <br />3 RELIEF DOORS AT ALL LOW POINTS IN DUCTWORK. <br />PROVIDE DUCT ACCESS DOORS PER SPECIFICATIONS. <br />I 36" I I <br />� � I I j , <br />I ; 24990 I <br />f <br />VRECTANGULAR DUCTS EXTEND ABOVE I <br />3 EXISTING ELECTRICAL ROOM <br />TRANSITIONS TO ROUND AND CONTINUE <br />i TO BUILDING 40-033 WITH OTHER <br />i I EXISTING RISERS NOT SHOWN <br />I WINDOW I I <br />f d I <br />60x20 1 46x10 i <br />60x20 <br />CONSTRUCTION NOTES <br />I <br />f <br />I C i 1 WHERE POSSIBLE SUPPORT DUCT ON EXISTING TOOL <br />I I M520 I I i I I STRUCTURE. ELSEWHERE PROVIDE COMMON STRUT <br />, SUPPORTS FOR DUCT AND SPRINKLER PIPING. <br />D 41 /43 SECTION I 41 /43 SECTION i I 41 /43 SECTION I 46 SECTION I ATTACH TO BUILDING STRUCTURE PER STRUCTURAL <br />PICK UP i MAJOR ASSEMBLY LOWER LODE TOOL SHEETS 3S14, 3S15, S599 & S600. <br />M520 t <br />I } I 2 PROVIDE CIC DUCT DROP DOWN TO 16 —2 FROM <br />THE FACTORY FLOOR. CENTERLINE OF DUCT MATCHES <br />THE CENTERLINE BETWEEN THE FIRST TWO COLUMNS <br />ON THE FME140T0000-6000 TOOL, <br />B <br />SECTION FACING E--LIME NIGH BAY A M520 <br />SCALE: 1 "=20'®Q" M05 M520 <br />i 0 <br />C`i®I IOTI I D A I r1n] I RM n n -"-"r r--' <br />REVISION I BY I APPROVED I DATE <br />STRUCTURAL COLUMN <br />E <br />MAXIMUM 30" <br />ENCROACHMENT <br />DISTANCE SPRIN LER <br />%PIPE <br />SECTION <br />c <br />SCALE: 1/2"=19-0" M520 LIM520 <br />LEVEL 3 FLOOR <br />4802 01 <br />TOOL DW, <br />BOX OUT <br />DUCT <br />SECTION rD__� <br />SCALE: NONE M520 M520 <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />UHAWN <br />D. SMITH <br />BAIL SUBTITLE <br />0816 19 SECTIONSECKED CIC <br />Oi3 16 19 <br />J� MCCORVEY <br />ENGINEER <br />K. BENHAM <br />TITLE <br />o� 16/19 767 RATE INCREASE AFT SI <br />BUILDING <br />MECHANICAL MASTER COL. E—DG/13-15 <br />APPROVED BY <br />DEPT. <br />DATE <br />CHECKED <br />APPROVED <br />APPROVED <br />REFERENCE DRAWINGS <br />FME146T0000-7000 <br />SCALE: 1 /2"=1 ' —0" <br />��3q'i x� g �✓ d l y 4 <br />www,brph.coni Copyright © 2019 <br />Architects Engineers, Inca <br />19020 33rd Ave W, Suite 530 State of Washington <br />Certificate of Authorization <br />Lynnwood, Washington, 98036 Architecture No. 603235512 <br />425-921-3500 Engineering No. 3137 <br />CURRENT. REVISION SYMBOL DATE <br />0 06/16/19 <br />