Laserfiche WebLink
POST <br />INSTALLED ANCHORAGE <br />SUBMITTALS <br />SPECIAL INSPECTION <br />INSPECTIONS CONT. <br />1. <br />ADHESIVE ANCHORAGES, WHERE SPECIFIED ON THE DRAWINGS, SHALL CONFORM TO <br />1. <br />THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER <br />1. <br />SPECIAL INSPECTION BY A REGISTERED DEPUTY BUILDING INSPECTOR, <br />D. BOLTS, PRIOR TO BOLTING <br />THE FOLLOWING: <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION/ERECTION/INSTALLATION. <br />IN CONTRACT WITH THE OWNER AND APPROVED BY THE FOR AND THE <br />i. (CONT) MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER <br />THESE ITEMS ARE IN ADDITION TO ANY SUBMITTAL REQUIREMENTS SPECIFIED <br />BUILDING OFFICIAL, SHALL BE REQUIRED FOR THE FOLLOWING TYPES OF WORK: <br />MATERIALS <br />A. CONCRETE EPDXY ANCHORS: HILTI HIT -RE 500 V3 ESR-3814 <br />ON THESE PLANS OR IN THE PROJECT SPECIFICATIONS. <br />ii. (PER) FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS <br />B. GROUTED REINFORCED <br />ITEM PROD SHOP TEST CALLS BLDG <br />BUILDING CODE <br />REFERENCE <br />iii. (PER) PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, <br />CMU EPDXY ANCHORS: HILTI HIT-HY 70 ESR-2682 <br />DATA DWGS RESULTS DEPT <br />TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR <br />SPECIAL SYSTEMS 1705.1.1 <br />PLANE) <br />2. <br />MECHANICAL ANCHORAGES, WHERE SPECIFIED ON THE DRAWINGS, SHALL CONFORM TO <br />A. EPDXY X <br />EXPANSION/EPDXY ANCHOR BOLTS <br />iv. (PER) PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL <br />THE FOLLOWING: <br />B. EXPANSION ANCHORS X <br />v. (PER) CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING <br />C. TIE -DOWNS X <br />2. <br />SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHEN THE WORK IS DONE ON <br />SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET <br />A. CONCRETE EXPANSION ANCHORS: HILTI KWIK BOLT TZ ESR-1917 <br />THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED BY THE BUILDING <br />APPLICABLE REQUIREMENTS <br />2. <br />"PROD DATA" - SUBMIT ADEQUATE DOCUMENTATION THAT THE PRODUCT <br />OFFICIAL TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. CERTIFICATES OF <br />vi. (PER) PRE -INSTALLATION VERIFICATION TESTING BY INSTALLATION <br />B. CONCRETE UNDERCUT ANCHORS HILTI HDA ESR-1546 <br />PROPOSED TO BE USED MEETS THE REQUIREMENTS ON THESE PLANS AND <br />COMPLIANCE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FROM THE <br />PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND <br />THE PROJECT SPECIFICATIONS. <br />FABRICATORS OR MANUFACTURERS OF THE FOLLOWING COMPONENTS: <br />METHODS USED <br />C. GROUTED REINFORCED <br />CMU EXPANSION ANCHORS HILTI KWIK BOLT 3 ESR-1385 <br />3. <br />"SHOP DWGS" - SUBMIT COMPLETE SHOP DRAWINGS SUFFICIENT TO SHOW <br />3. <br />ALL PREPARED SOIL -BEARING SURFACES SHALL BE INSPECTED BY THE SOILS <br />vii. (PER) PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND <br />QUANTITIES AND KINDS OF MATERIALS, METHODS OF ASSEMBLY, AND ALL <br />ENGINEER PRIOR TO PLACEMENT OF REINFORCING STEEL, <br />OTHER FASTENER COMPONENTS <br />3, <br />DRILLING SHALL BE PERFORMED WITH A ROTARY HAMMER DRILL AND CARBIDE TIPPED <br />IR <br />DATA REQUIRED FOR FABRICATION ERECTION AND INSTALLATION. THE <br />DRILL BIT IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND THE <br />PURPOSE THESE DRAWINGS DEMONSTRATE THAT THE CONTRACTOR <br />4. <br />EPDXY OR EXPANSION TYPE ANCHORS SHALL BE APPROVED BY THE BUILDING <br />E. BOLTS, DURING BOLTING <br />APPLICABLE ICC EVALUATION REPORT. <br />UNDERSTANDS THE DESIGN CONCEPT DOCUMENTED HEREIN. SUBMITTALS <br />OFFICIAL FOR THEIR USE AND SHALL BE INSTALLED ACCORDING TO THE <br />i. (PER) FASTENERS ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL <br />CONSISTING OF DRAWINGS TAKEN DIRECTLY FROM THESE PLANS WILL NOT <br />MANUFACTURER'S RECOMMENDATIONS AND ICC PRODUCT APPROVAL CONDITIONS. <br />HOLES <br />4. <br />BORE HOLE CLEANING PROCEDURES MUST COMPLY WITH THE MANUFACTURER'S <br />BE APPROVED. <br />AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED <br />INSTRUCTIONS AND THE APPLICABLE ICC EVALUATION REPORT IN ORDER TO PRODUCE <br />5. <br />NONDESTRUCTIVE INSPECTION OF ALL WELDS, SHOP AND FIELD, OF <br />A DRY, DUST -FREE HOLE. <br />4. <br />"TEST RESULTS" - SUBMIT RESULTS FOR ANY TESTING REQUIRED BY <br />MOMENT -RESISTING FRAMES SHALL BE PROVIDED IN ACCORDANCE WITH THE <br />ii. (PER) JOINT BROUGHT TO THE SNUG -TIGHT CONDITION PRIOR TO THE <br />BUILDING CODE OR THESE PLANS. <br />GOVERNING CODE. <br />PRETENSIONING OPERATION <br />5. <br />INJECTION OF ADHESIVE SHALL BE PERFORMED IN ACCORDANCE WITH <br />iii. (PER) FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED <br />MANUFACTURER'S INSTRUCTIONS AND THE APPLICABLE ICC EVALUATION REPORT IN <br />5. <br />CALLS - SUBMIT CALCULATIONS SIGNED AND SEALED BY A DESIGN <br />6. <br />SUMMARY REPORTS OF ALL INSPECTIONS AND TEST RESULTS SHALL BE <br />FROM ROTATING <br />ORDER TO PRODUCE AN AIR -VOID FREE INJECTION. <br />PROFESSIONAL AUTHORIZED TO PERFORM WORK IN THE PROJECT <br />DISTRIBUTED TO THE OWNER, ARCHITECT, STRUCTURAL ENGINEER, AND <br />iv. (PER) FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC <br />JURISDICTION. <br />BUILDING OFFICIAL WITH DEFICIENCIES CLEARLY NOTED, <br />SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT <br />6. <br />SPECIAL CONDITIONS SUCH AS WATER SATURATED CONCRETE, WATER -FILLED HOLES, <br />UNDERWATER AND OVERHEAD INSTALLATIONS MUST BE APPROVED BY THE ENGINEER <br />6. <br />"BLDG DEPT" - IF CHECKED, THE SUBMITTALS SHALL BE REVIEWED AND <br />7. <br />DEFICIENCIES SHALL BE REPORTED TO THE CONTRACTOR ON A DAILY BASIS. <br />TOWARD THE FREE EDGES <br />OF RECORD AND COMPLY WITH THE APPLICABLE ICC-ES REPORT. <br />APPROVED BY THE BUILDING OFFICIAL PRIOR TO FABRICATION AND/OR <br />INSTALLATION <br />�3. <br />DEFINITIONS OF SPECIAL INSPECTIONS AND TESTING FREQUENCY: <br />F. BOLTS, AFTER BOLTING <br />7. <br />STEEL ANCHORING ELEMENTS SHALL BE THE SIZE AND GRADE SHOWN ON THE <br />. <br />i. (CONT) DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS <br />DRAWINGS AND MUST BE CLEAN, DRY AND FREE OF ANY OIL OR CONTAMINANTS. <br />7. <br />THE CONTRACTOR SHALL REVIEW, STAMP AND APPROVE SUBMITTALS PRIOR TO REVIEW <br />"CONTINUOUS" - THE FULL-TIME OBSERVATION OF WORK REQUIRING <br />BY THE STRUCTURAL ENGINEER. UNREVIEWED OR UNSTAMPED SUBMITTALS WILL BE <br />SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS <br />STRUCTURAL OBSERVATION <br />6. <br />SUBSTITUTIONS FOR ANCHOR SYSTEMS MUST BE APPROVED BY THE STRUCTURAL <br />RETURNED TO THE CONTRACTOR UNREVIEWED. <br />PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. <br />ENGINEER OF RECORD PRIOR TO INSTALLATION AND SHALL HAVE A VALID ICC-ES <br />1. <br />STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN <br />EVALUATION IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE. <br />6. <br />THE CONTRACTOR SHALL ALLOW TWO WEEKS FOR REVIEW OF SUBMITTALS. <br />"PERIODIC" - THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK <br />ACCORDANCE WITH THE GOVERNING CODE. STRUCTURAL OBSERVATION IS THE <br />COMMENTS OR MARKS ON SUBMITTALS ARE A NORMAL AND EXPECTED PART OF THE <br />REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO <br />VISUAL OBSERVATION OF THE ELEMENTS AND CONNECTIONS OF THE STRUCTURAL <br />9. <br />ALL ANCHOR EMBED DEPTHS SPECIFIED ON THESE DRAWINGS ARE EFFECTIVE <br />SUBMITTAL PROCESS AND SHALL NOT BE USED AS A BASIS FOR CHANGE ORDERS. <br />IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING <br />SYSTEMS AT SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE <br />EMBEDMENT DEPTHS. ADDITIONAL ANCHOR LENGTH AND OR HOLE DEPTH SHALL BE <br />TIME REQUIRED TO REVISE AND RESUBMIT ANY SUBMITTAL SHALL BE CONSIDERED <br />PERFORMED AND AT THE COMPLETION OF THE WORK. <br />FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS. <br />PROVIDED AS REQUIRED BY THE ANCHOR MANUFACTURER AND ASSOCIATED CODE <br />INHERENT TO THE SUBMITTAL REVIEW PROCESS AND SHALL NOT BE DEEMED A <br />STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE <br />APPROVALS. <br />CHANGE ORDER. <br />9. <br />STEEL INSPECTIONS <br />INSPECTIONS REQUIRED OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR. <br />9. <br />RESUBMITTALS SHALL HAVE ALL REVISIONS CLEARLY IDENTIFIED WITH DRAWING <br />A. WELDS, PRIOR TO WELDING <br />2. <br />THE OWNER SHALL EMPLOY AN ENGINEER OR ARCHITECT LICENSED TO PERFORM <br />CLOUDS AND REVISION DATES. THE STRUCTURAL ENGINEER SHALL NOT BE <br />i. (CONT) WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE. <br />STRUCTURAL OBSERVATION IN THE PROJECT JURISDICTION. <br />RESPONSIBLE FOR THE REVIEW OF ANY UNMARKED REVISIONS. <br />ii. (CONT) MANUFACTURE CERTIFICATIONS FOR WELDING CONSUMABLES <br />AVAILABLE. <br />3. <br />THE STRUCTURAL OBSERVER SHALL PROVIDE A LETTER TO BE SUBMITTED TO THE <br />10. <br />CONTRACTOR REQUESTED CHANGES OR SUBSTITUTIONS SHALL BE SUBMITTED IN <br />WRITING TO THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR <br />iii. (PER) MATERIAL IDENTIFICATION (TYPE/GRADE). <br />BUILDING OFFICIAL, AS REQUIRED BY THE JURISDICTION, BEFORE THE FIRST SITE <br />CONSTRUCTION CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS <br />iv. (PER) WELDER IDENTIFICATION SYSTEM - THE FABRICATOR OR ERECTOR, <br />VISIT. THE STRUCTURAL OBSERVER SHALL ALSO INFORM THE OWNER OF THE <br />REQUIREMENT. CONTRACTOR WILL BE RESPONSIBLE FOR ANY ADDITIONAL <br />AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO <br />REQUIREMENTS FOR A PRECONSTRUCTION MEETING AND SHALL PRESIDE OVER THIS <br />ENGINEERING ERROR AND ASSOCIATED FEES REQUIRED FOR REVIEW AND APPROVAL <br />HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. <br />MEETING. <br />OF REQUESTED CHANGES AND SUBSTITUTIONS. <br />v. (PER) FIT -UP OR GROVE WELDS (INCLUDING JOINT GEOMETRY) <br />4. <br />THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE COMMUNICATION <br />vi. (PER) CONFIGURATION AND FINISH OF ACCESS HOLES <br />BETWEEN THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN, <br />vii. (PER) FIT -UP OF FILLET WELDS <br />STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND SPECIAL <br />viii. (PER) CHECK WELDING EQUIPMENT <br />INSPECTORS. THE PURPOSE OF THIS COMMUNICATION SHALL BE TO IDENTIFY THE <br />MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL AND <br />B. WELDS, DURING WELDING <br />LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW SCHEDULING OF THE <br />i. (PER) USE OF QUALIFIED WELDERS <br />REQUIRED OBSERVATIONS. <br />ii. (PER) CONTROL AND HANDLING OF WELDING CONSUMABLES <br />5. <br />REPORTS SHALL BE ISSUED FOR EACH STRUCTURAL OBSERVATION AND ISSUED TO <br />iii. (PER) NO WELDING OVER CRACKED WELDS. <br />THE OWNER, ARCHITECT, CONTRACTOR AND BUILDING OFFICIAL. A RECORD OF THE <br />iv. (PER) ENVIRONMENTAL- CONDITIONS <br />PRECONSTRUCTION MEETING NOTED ABOVE SHALL BE INCLUDED IN THE FIRST <br />v. (PER) WPS FOLLOWED <br />OBSERVATION REPORT. <br />vi. (PER) WELDING TECHNIQUES <br />6. <br />THE CONTRACTOR SHALL SCHEDULE EACH OBSERVATION AT LEAST TWO WEEKS PRIOR <br />TO DATE OF THE PROPOSED OBSERVATION. <br />C. WELDS, AFTER WELDING <br />i. (PER) WELDS CLEANED <br />7. <br />THE STRUCTURAL OBSERVER SHALL PERFORM OBSERVATIONS AT THE FOLLOWING <br />ii. (CONT) SIZE, LENGTH AND LOCATION OF WELDS <br />SIGNIFICANT CONSTRUCTION STAGES: <br />iii. (CONT) WELDS MEET VISUAL ACCEPTANCE CRITERIA <br />CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE OBSERVED: <br />iv. (CONT) ARC STRIKES <br />v. (CONT) K-AREA (WHEN WELDING OF DOUBLER PLATES, CONTINUITY <br />A) AT SUBSTANTIAL COMPLETION OF THE PRIMARY STRUCTURE. <br />PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA, VISUALLY <br />INSPECT THE WEB K-AREA FOR CRACKS WITHIN 31N OF THE WELD. <br />vi. (CONT) BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED) <br />vii. (CONT) REPAIR ACTIVITIES <br />viii. (CONT) DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT <br />OR MEMBER <br />lsz)uED FOR Po"'ERMIT <br />04 / 0`8 / 2 0 19 <br />arhO 1y <br />