Laserfiche WebLink
STATEMENT OF SPECIAL INSI 1 IBC <br />1. THE OWNER SHALL HIRE AN INDEPENDENT TESTING/INSPECTION AGENCY TO PERFORM REQUIRED SPECIAL <br />INSPECTIONS IN ACCORDANCE WITH SECTION 1704.2 OF THE INTERNATIONAL BUILDING CODE (IBC). <br />2. THE STATEMENT OF SPECIAL INSPECTIONS HEREIN IS FULFILLMENT OF THE REQUIREMENTS OF IBC SECTIONS 1704 <br />AND 1705. <br />3. SPECIAL INSPECTIONS AND TESTING SHALL DE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND <br />SPECIFICATIONS, THIS STATEMENT, IBC CHAPTER 17 AND ITS REFERENCED STANDARDS. <br />4. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK FOR COMPLIANCE WITH THE JURISDICTION APPROVED PLANS, <br />SPECIFICATIONS, AND APPLICABLE PROVISIONS OF THE IBC. THE ARCHITECT/ENGINEER'S REVIEWED SHOP DRAWINGS, <br />AND/OR PLACEMENT DRAWINGS, MAY BE USED ONLY AS AN AID TO SPECIAL INSPECTIONS. THE DEFINITIONS FOR <br />ACTIONS OR FREQUENCIES OF INSPECTIONS ARE AS FOLLOWS: <br />A. "CONTINUOUS", FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED <br />SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. <br />B. "PERIODIC", INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED <br />SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED AND AT THE <br />COMPLETION OF THE WORK. <br />C. "OBSERVE" THESE ITEMS ON A RANDOM BASIS (AISC). OPERATIONS NEED NOT BE DELAYED PENDING <br />THESE INSPECTIONS. <br />D. "PERFORM" THESE TASKS FOR EACH BOLTED CONNECTION, WELDED JOINT, OR MEMBER (AISC). <br />5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR INSPECTIONS. THE DAILY REPORTS SHALL REMAIN AT <br />THE JOB SITE WITH THE CONTRACTOR FOR THE BUILDING OFFICIAL'S INSPECTOR. THE REPORTS SHALL INCLUDE THE <br />FOLLOWING. <br />A. NAME OF SPECIAL INSPECTOR AND DATE THE INSPECTION WAS PERFORMED. <br />B. DESCRIPTION OF THE INSPECTIONS, WITH LOCATIONS AND TESTS PERFORMED. <br />C. LIST OF NON -CONFORMING ITEMS. <br />D. HOW NQN-CONFORMING ITEMS WERE RESOLVED OR UNRESOLVED. <br />E. LIST OF CHANGES OR CORRECTIONS TO NON -CONFORMING ISSUES AUTHORIZED BY THE ENGINEER, <br />ARCHITECT, OR BUILDING OFFICIAL'S INSPECTORS. <br />6. THE INSPECTOR SHALL BRING NON -CONFORMING ITEMS TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR, AND <br />NOTE ALL SUCH ITEMS IN THE DAILY REPORT. IF ANY ITEM IS NOT RESOLVED IN A TIMELY MANNER AND IS ABOUT TO BE <br />INCORPORATED IN THE WORK, THE SPECIAL INSPECTORS SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD. <br />7. THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND INSPECTIONS PERFORMED DIRECTLY <br />TO THE BUILDING OFFICIAL, ENGINEER OF RECORD, AND/OR OTHERS AS DESIGNATED. <br />8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE BUILDING OFFICIAL STATING <br />THAT ALL ITEMS REQUIRING SPECIAL INSPECTIONS AND TESTING WERE FULFILLED, ALL DISCREPANCIES WERE <br />CORRECTED OR RESOLVED, AND ALL WORK REQUIRING SPECIAL INSPECTIONS 18 IN CONFORMANCE WITH THE <br />APPROVED DESIGN DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES. ANY ITEMS UNRESOLVED OR <br />DISCREPANCIES IN COVERAGE (I.E. MISSED INSPECTIONS, PERIODIC INSPECTIONS WHEN CONTINUOUS WAS <br />REQUIRED, ETC) SHALL BE SPECIFICALLY ITEMIZED IN THE REPORT. <br />9, SPECIAL INSPECTION AND TEST REQUIREMENTS FOR CERTAIN BUILDING ELEMENTS IMPLIED BY THE STATEMENT OF <br />SPECIAL INSPECTIONS YET LISTED AS EXEMPT BY IBC IS PERMITTED TO BE WAIVED WITH WRITTEN APPROVAL FROM <br />THE ENGINEER OF RECORD. <br />10. REQUIREMENTS FOR WIND RESISTANCE: <br />STATEMENT OF SPECIAL INSPECTION FOR WIND RESISTANCE IS NOT REQUIRED. (REQUIRED IN WIND EXPOSURE <br />CATEGORY B, WHERE THE NOMINAL DESIGN WIND SPEED, VaSd IS 120 MPH OR GREATER. REQUIRED IN WIND <br />EXPOSURE CATEGORY C OR D, WHERE THE NOMINAL DESIGN WIND SPEED, Vasd IS 110 MPH OR GREATER.) <br />11. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF A SYSTEM OR COMPONENT <br />DESCRIBED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER <br />OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN <br />ACCORDANCE WITH IBC 1704.4. REQUIREMENTS FOR SEISMIC RESISTANCE: <br />STATEMENT OF SPECIAL INSPECTION FOR SEISMIC RESISTANCE IS REQUIRED. <br />DESCRIPTION OF SEISMIC FORCE -RESISTING SYSTEM SUBJECT TO SPECIAL INSPECTION AND TESTING FOR SEISMIC <br />RESISTANCE: (REQUIRED FOR SEISMIC DESIGN CATEGORIES C, D, E, OR F IN ACCORDANCE WITH IBC SECTIONS <br />1705.12.1 THROUGH 1705.12.3, 1705.13.1, AND 1705.13.2.) <br />STEEL INTERMEDIATE MOMENT FRAMES <br />EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF A SYSTEM OR COMPONENT <br />DESCRIBED ABOVE SHALL SUBMIT'A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER <br />OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN <br />ACCORDANCE WITH IBC 1704.4. <br />12. THIS STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER OF RECORD WITH THE <br />UNDERSTANDING THAT THE BUILDING OFFICIAL WILL: <br />A. REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS WHO WILL <br />PERFORM THE INSPECTIONS. <br />B. MONITOR SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT THE SPECIAL INSPECTORS ARE <br />QUALIFIED AND PERFORMING THEIR DUTIES AS CALLED FOR IN THE STATEMENT OF SPECIAL INSPECTION. <br />C. REVIEW SUBMITTED INSPECTION REPORTS. <br />D, PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. <br />E. ISSUE CERTIFICATION OF OCCUPANCY AFTER ALL SPECIAL INSPECTION REPORTS AND THE FINAL SPECIAL <br />INSPECTION REPORT HAVE BEEN SUBMITTED AND ACCEPTED. <br />SYM REVISION <br />0 IFC I HBL EXPANSION PACKAGE POSITION 7 <br />BY APPROVED <br />IFC IFC <br />CONCRETE CONSTRUCTION (IBC 1 e " <br />ITEM FREQUENCY OF INSPECTION INSTRUCTIONS <br />VERIFY PRIOR TO PLACING CONCRETE THAT REINFORCING IS OF <br />SPECIFIED TYPE, GRADE AND SIZE; THAT IT IS FREE OF OIL, DIRT <br />AND RUST; THAT IT IS LOCATED AND SPACED PROPERLY; THAT <br />REINFORCING STEEL CONTINUOUS PERIODIC HOOKS, BEND, TIES, STIRRUPS AND SUPPLEMENTAL <br />REINFORCEMENT ARE PLACED CORRECTLY; THAT LAP LENGTHS, <br />STAGGER AND OFFSETS ARE PROVIDED; AND THAT ALL <br />MECHANICAL CONNECTIONS ARE INSTALLED PER THE <br />MANUFACTURER'S INSTRUCTIONS AND/OR EVALUATION REPORT. <br />CAST -IN BOLTS & EMBEDS CONTINUOUS PERIODIC INSPECT ANCHORS CAST IN CONCRETE. <br />ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: ADHESIVE ANCHORS <br />INSTALLED IN HORIZONTALLY OR UPWARDLY <br />CONTINUOUS <br />PERIODIC <br />SHALL BE SPECIALLY INSPECTED AS <br />INCLINED ORIENTATIONS TO RESIST SUSTAINED <br />R <br />REQUIRED <br />REQUIRED BY THE APPROVED ICC-ES REPORT. <br />TENSION LOADS <br />ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: MECHANICAL ANCHORS AND <br />ADHESIVE ANCHORS INSTALLED IN DOWNWARD <br />CONTINUOUS <br />PERIODIC <br />ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS <br />ORIENTATIONS NOT SUBJECTED TO SUSTAINED <br />REQUIRED BY THE APPROVED ICC-ES REPORT. <br />TENSION LOADS <br />USE OF REQUIRED MIX <br />VERIFY THAT ALL MIXES USED COMPLY WITH THE APPROVED <br />DESIGN <br />CONTINUOUS <br />PERIODIC <br />CONSTRUCTION DOCUMENTS; ACI 318;CH 19, 26.4.3, 26.4.4; <br />AND IBC 1904.1, 1904.2, 1908.2, 1908.3 <br />PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR <br />CONCRETE TESTS <br />CONTINUOUS <br />PERIODIC <br />STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, <br />AND DETERMINE THE TEMPERATURE OF THE CONCRETE. <br />CONCRETE PLACEMENT <br />CONTINUOUS <br />PERIODIC <br />INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION <br />TECHNIQUES. <br />VERIFY THAT THE AMBIENT TEMPERATURE FOR CONCRETE IS <br />KEPT AT > 50°F FOR AT LEAST 7 DAYS AFTER PLACEMENT. <br />HIGH -EARLY -STRENGTH CONCRETE SHALL BE KEPT AT >50°F <br />FOR AT LEAST 3 DAYS. ACCELERATED CURING METHODS MAY <br />BE USED (SEE ACI 318:26.4.7 - 26.4.9). THE AMBIENT <br />TEMPERATURE FOR SHOTCRETE SHALL BE >40°F FOR THE <br />CURING TEMPERATURE AND TECHNIQUES <br />CONTINUOUS <br />PERIODIC <br />SAME PERIOD OF TIME AS NOTED FOR CONCRETE. SHOTCRETE <br />SHALL BE KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 <br />HOURS AFTER SHOTCRETING. ALL CONCRETE MATERIALS, <br />REINFORCEMENT, FORMS, FILLERS, AND GROUND SHALL BE <br />FREE FROM FROST. IN HOT WEATHER CONDITIONS ENSURE <br />THAT APPROPRIATE MEASURES ARE TAKEN TO AVOID PLASTIC <br />SHRINKAGE CRACKING AND THAT THE SPECIFIED <br />WATER/CEMENT RATIO IS NOT EXCEEDED. <br />STRENGTH VERIFICATION <br />CONTINUOUS <br />PERIODIC <br />VERIFY THAT ADEQUATE STRENGTH HAS BEEN ACHIEVED PRIOR <br />TO THE REMOVAL OF SHORES AND FORMS OR THE STRESSING <br />OF POST -TENSIONED TENDONS. <br />VERIFY THAT THE FORMS ARE PLACED PLUMB AND CONFORM <br />FORMWORK <br />CONTINUOUS PERIODIC TO THE SHAPES, LINES, AND DIMENSIONS OF THE MEMBERS AS <br />REQUIRED BY THE APPROVED CONSTRUCTION DOCUMENTS. <br />SPECIAL <br />SEISMICI(IBC 1705.12 AND IBC 1705.13) <br />STRUCTURAL L SEISMIC INSPECTIONS I - ) <br />ITEM INSPECTION ACTION INSTRUCTIONS <br />ALL MEMBERS INDICATED AS SFRS SHALL BE SUBJECT TO THE <br />QUALITY ASSURANCE PLAN IN ACCORDANCE WITH CHAPTER J PER <br />AISC 341-10, MT TEST 100% OF ALL PARTIAL PENETRATION WELDS <br />AT COLUMN BASES AND COLUMN SPLICES IN SFRS. AFTER AT <br />LEAST (20)- PJP WELDS HAVE BEEN MT TESTED, THE TESTING <br />INSPECTION OF STRUCTURAL WELDING IN PERFORM OBSERVE RATE MAY BE REDUCED TO 10% PROVIDED THE REJECTION RATE <br />ACCORDANCE WITH AISC SEISMIC IS 5% OR LESS FOR A PARTICULAR WELDER. AT LARGE PARTIAL <br />PROVISIONS PENETRATION WELDS (1" GROOVES AND LARGER), UT TEST 100% <br />CJP GROOVE WELDS AT BRACING REINFORCING PLATES. AFTER <br />(40)- CJP GROOVE WELDS HAVE BEEN UT TESTED, THE TESTING <br />RATE MAY BE REDUCED TO 25% PROVIDED THE REJECTION RATE <br />ID 5% OR LESS FOR A PARTICULAR WELDER. <br />WELDING OF SEISMIC FORCE RESISTING SYSTEM SHALL <br />MEET THE REQUIREMENTS OF AWS D1.8/D1.8M INCLUDING <br />THE FOLLOWING SECTIONS AND ANNEXES: <br />WELDING INSPECTION AND NON-DESTRUCTIVE 1. GENERAL REQUIREMENTS <br />TESTING SHALL MEET REQUIREMENTS OF AWS PERFORM OBSERVE <br />7. INSPECTION <br />D1.8/D1.8M <br />ANNEX F. SUPPLEMENTAL ULTRASONIC TECHNICIAN TESTING. <br />ANNEX G. SUPPLEMENTAL MAGNETIC PARTICLE TESTING <br />PROCEDURES. <br />ANNEX H. FLAW SIZING BY ULTRASONIC TESTING. <br />PROTECTED ZONES <br />PERFORM <br />OBSERVE <br />'this item h <br />VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS ARE o <br />3s been <br />esusf it <br />WITHIN THE PROJECTED ZONE (SEE TABLE J8-1 OF AISC 34 1- 1 0),and sealedand <br />the <br />electronic <br />spies. <br />DATE SYM REVISION BY APPROVED DATE <br />09/01 /22 <br />CONTINUITY PLATES OR STIFFENERS ARE . <br />PERFORM <br />LA <br />OBSERVE <br />NDT PER SECTION J6.2e. <br />PERFORMED IN k-AREA -- <br />COMPLETE -JOINT -PENETRATION (CJP) GROOVE <br />PERFORM <br />OBSERVE <br />NDT PER SECTION J6.2b. PERCENTAGE OF TESTING IS <br />WELDS IN MATERIALS 5/16-INCH THICK OR GREATER <br />PERMITTED TO BE REDUCED PER SECTIONS J6.2g AND J6.2h. <br />BASE METAL THICKER THAN 1-1/2-INCH LOADED IN <br />TENSION IN THE THROUGH -THICKNESS DIRECTION <br />NDT PER SECTION J6.2c. USE ASTM A435 OR ASTM A898 (LEVEL 1 <br />IN TEE AND CORNER JOINTS WHERE THE <br />PERFORM <br />OBSERVE <br />CRITERIA) AS BASIS FOR ACCEPTANCE OF ANY MATERIAL <br />CONNECTED MATERIAL IS > 3/4 INCH AND <br />DISCONTINUITIES. <br />CONTAINS CJP GROOVE WELDS <br />THERMALLY CUT SURFACES OF BEAM COPES AND <br />ACCESS HOLES AT WELDED SPLICES AND <br />PERFORM <br />LLJ <br />OBSERVE <br />NDT PER SECTION J6.2d. <br />CONNECTIONS <br />REDUCED BEAM SECTION (RBS) REPAIR ! PERFORM , OBSERVE <br />NDT PER SECTION J6.2e. <br />WELD TAB REMOVAL SITES <br />PERFORM <br />OBSERVE <br />NDT PER SECTION J6.2f. <br />DESIGNATED I I TEMS (IBC 1705.12.4): <br />ITEM <br />FREQUENCY OF INSPECTION <br />INSTRUCTIONS <br />DESIGNATED <br />INSPECT AND VERIFY THAT THE COMPONENT LABEL, ANCHORAGE,OR <br />SEISMIC SYSTEMS VERIFICATION <br />CONTINUOUS <br />PERIODIC <br />MOUNTING CONFORMS TO THE CERTIFICATE OF COMPLIANCE <br />IN ACCORDANCE WITH SECTION 1705.13.3. <br />ARCHITECTURAL COMPONENTS (IBC17.1 1 .1 .)® <br />ITEM <br />FREQUENCY OF INSPECTION <br />INSTRUCTIONS <br />ANCHORAGE OF ELECTRICAL EQUIPMENT <br />VERIFY THAT ANCHORAGE COMPLIES WITH APPROVED <br />FOR EMERGENCY OR STANDBY POWER <br />CONTINUOUS <br />PERIODIC <br />CONSTRUCTION DOCUMENTS. PERFORMED BY CODE INSPECTION <br />SYSTEMS <br />FIRM. <br />INSTALLATION AND ANCHORAGE OF PIPING <br />VERIFY THAT INSTALLATION AND RESISTANT COMPLY WITH <br />SYSTEMS CARRYING FLAMMABLE, COMBUSTIBLE <br />CONTINUOUS <br />PERIODIC <br />APPROVED CONSTRUCTION DOCUMENTS. PERFORMED BY CODE <br />OR HIGHLY TOXIC MATERIALS <br />INSPECTION FIRM. <br />INSTALLATION AND ANCHORAGE OF HVAC <br />DUCTWORK CONTAINING HAZARDOUS <br />CONTINUOUS <br />PERIODIC F71APPROVED <br />VERIFY THAT INSTALLATION AND RESISTANT COMPLY WITH <br />CONSTRUCTION DOCUMENTS. PERFORMED BY CODE <br />MATERIALS <br />INSPECTION FIRM. <br />INSTALLATION AND ANCHORAGE OF VIBRATION <br />ISOLATION SYSTEMS HAVING A CLEARANCE OF <br />CONTINUOUS <br />PERIODIC <br />VERIFY THAT INSTALLATION COMPLIES WITH APPROVED <br />CONSTRUCTION DOCUMENTS AND MANUFACTURERS <br />1/4" BETWEEN THE EQUIPMENT SUPPORT 6 FRAME <br />AND RESTRAINT. <br />RECOMMENDATIONS. PERFORMED BY CODE INSPECTION FIRM. <br />CONFIRM THAT MANUFACTURERS CERTIFICATION OF COMPLIANCE <br />DESIGNATED SEISMIC SYSTEMS <br />CONTINUOUS El <br />PERIODIC <br />CONFORMS TO THE REQUIREMENTS OF SECTION 13.2 OF ASCE 7-10. <br />VERIFY THAT THE LABEL, ANCHORAGE OR MOUNTING CONFORMS TO <br />THE MANUFACTURER'S CERTIFICATION OF COMPLIANCE. <br />PERFORMED BY CODE INSPECTION FIRM. <br />;lectronically signed and sealed by (0 <br />using a digital signature and data. <br />s document are not considered signed <br />signature must be verified on any <br />09-06- 0Z <br />20 9011 <br />cTUI?AL <br />EXP I RES 01-24-2024 <br />ACCEPTABILITY 'lWCZr <br />R <br />THIS DESIGN AND/OR i <br />SPECIFICATION APPROVED� � <br />i ■* _ry tI <br />_ <br />' 11 I <br />�5 <br />x <br />.,ll <br />I` ) 'EVE T www.brph.com o2022 <br />I�� �D� PERMIT <br />Architects ors, Inc. <br />REV19020 33rd Ave W, Suite #500 State of Washington <br />Ceriifcate of Authorization <br />Lynnwood, Washington, 98036 Architecture No. 603235512 <br />425-921-3500 Engineering No. 3137 <br />SUBTITLE - CURRENT REVISION SYMBOL DATE <br />STATEMENT OF SPECIAL INSPECTIONS 16123 09/01 /22 <br />SHEET <br />TITLE <br />BUILDING 40-023 <br />S2o-b -200 <br />®B No. WO 15/2399-200 <br />STRUCTURAL MASTER EVERETT, WA DWG NO. 40-023- 20-b <br />a <br />0 <br />C4 <br />t <br />C14 <br />fd <br />CO <br />Go <br />