My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-25
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:37:00 PM
Creation date
1/25/2023 1:21:50 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1911-015
Year
2019
Notes
FOUNDATION PACKAGE FOR SPAR PAINT BOOTH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25'-0" <br />25'-0" <br />25'-0" <br />25'-0" <br />23'-81 /4" <br />PARTIAL FOUNDATION PLAN <br />SCALE: 1/8" = T-O" <br />/4" <br />30'-0" <br />SYM <br />I REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />�0�,�� <br />A <br />777X CWC NEW BUILDING - RECORD WBS 2548317 <br />KRW <br />DPB <br />01103/17 <br />B <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFC FOUNDATION W5983281 <br />HG <br />RLT <br />10.25.19 <br />30'-0" <br />31'-0" <br />LEGEND <br />1. SEE SHEET S2. <br />8'-3" y 2. Cx-xx <br />I <br />CAISSON �L CAISSON <br />DIAMETER, FT LENGTH, "L" FT <br />3. GB-X GRADE BEAM, SEE SHEET S266 <br />FOR GRADE BEAM SCHEDULE <br />4. CAP-X CAISSON CAP, SEE SHEET S265 <br />FOR CAISSON CAP SCHEDULE <br />M <br />M GENERAL NOTES <br />Ifi <br />ISSUED FOR <br />CONSTRUCTION <br />FOUNDATION-10.25.19 <br />I Our difference <br />is engineered. <br />www.harrisgroup.com <br />N ! REVISION "B" ONLY <br />PROJECT NO: 0012630.06 <br />DRAWN: RVP PROJ MGR: REP <br />ENGINEER: KBW APPROVED: RLT <br />CHECKED: AMW DATE: 10.25.19 <br />DRAWN DATE SUBTITLE <br />g0 Al. ACCEPTABILITY MEM 10/09/14 <br />WASA<YTHIS DESIGN AND/OR CAHM KED 10I09114 FOUNDATION PLAN <br />SPECIFICATION IS APPROVED <br />x ENGINEER TITLE PFP SPAR PAINT BOOTH 1 AND 2 <br />APPROVED BY DEPT. DATE DPB 10/09/14 <br />j CHECKED <br />�� 53436 4j4 APPROVED BUILDING 40-058 <br />IST <br />ojONAL REZZ � APPROVED <br />50,9 STRUCTURAL MASTER COL. 3.45-5/13-C <br />L� <br />T/CAISSON CAP ELEV = 97'-0" U.N.O. <br />SPAR TRIM & DRILL MAT FOUNDATION, SEE <br />S504 SHEETS FOR MORE INFORMATION. <br />SPAR TRIM & DRILL CAISSONS, SEE S504 SHEETS <br />FOR MORE INFORMATION. <br />SPAR WASH FOUNDATION, SEE S511 SHEETS <br />FOR MORE INFORMATION. <br />CONSTRUCTION NOTES <br />REFERENCE DRAWINGS <br />1. SEE SHEET S265 FOR CAISSON DETAILS. <br />3 .7 .7 .1 I <br />A <br />B <br />c <br />D <br />E <br />F <br />G <br />H <br />J <br />K <br />L <br />o 3 06 .1 <br />0 4' 8' 16' 24' <br />SCALE: 1/8" =1'-0" <br />CURRENT REVISION SYMBOL DATE <br />W5983281 B 10.25.19 <br />SHEET <br />ooslo-19 <br />JOB N0. COMP NO. <br />W2548317 <br />DWG NO. <br />EVERETT, WA 40-058-OOS10 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.