Laserfiche WebLink
SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />A <br />B <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFC REMOVAL W5983281 <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFC FOUNDATION W5983281 <br />HG <br />HG <br />RLT <br />RLT <br />08.09.19 <br />10.25.19 <br />C <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFC N15983281 <br />HG <br />RLT <br />11,19.19 <br />D <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFP GN5983281 <br />HG <br />RLT <br />11,19.19 <br />SYM <br />2': ,-v ;4..M?..� .r A : -�. u..v:. a. .. .- . ,*} L!#9a.. -.em.. .... L. .e... SH ., r:. ...-. .... .-�.�..... w ..r__ .�r. `v ..._.. ':.�':s _ mafF»c. f '...#. ✓;yel.: ��.aa�'Ka <br />i <br />n <br />a <br />II �; <br />fs � �:.» ,... ,... �; , �, fir.#, xi; ��. t: •V.• �r`� ,;" +. r!���. f .k r'� S°` .a.. nru <br />w <br />k <br />rr �.'� t a=�` ,=S'.+s;& T � G=".s � k rrr•. .:�5� ',«"'�. x "'3 s,� r a�*. ,� �' �* X h=c *y. <br />si+-,iM ix rei.. .,"fin v:i - 4 �_ '§� ax�� 98203 <br />� � �[�.,� �'� a�3ex�.,_ .� "?�� r k � �� k F}= �i.<.�aw�ar� $ '�� � ,. � ��,� ,",�$ _ � off"'r3 '_ v�aa3`',.� <br />REVISION i BY I APPROVED I DATE <br />F '•�..x . ,n :LAP" �.` } �" y-d � <br />1. WORK SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS. <br />2. CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND SECURITY <br />REGULATIONS. <br />3. CONTRACTOR SHALL PROVIDE EQUIPMENT SUPPORT INCLUDING SEISMIC RESTRAINT. <br />4. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN <br />IN FULL. <br />5. THE GENERAL CONTRACTOR AND RESPECTIVE SUBCONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF <br />ARCHITECTURAL, STRUCTURAL, MECHANICAL & ELECTRICAL WORK. ARCHITECTURAL, STRUCTURAL, MECHANICAL & <br />ELECTRICAL DRAWINGS SHALL BE REFERRED TO IN DETAIL FOR COORDINATION OF SPECIFIC REQUIREMENTS. <br />6. CONTRACTOR SHALT_ PROVIDE ALL WORK SHOWN AND /OR NOTED ON THESE DRAWINGS, INCLUDING ALL LABOR, <br />MATERIALS, AND SERVICES REQUIRED FOR THE SATISFACTORY COMPLETION OF WORK SHOWN ON THESE DRAWING. <br />7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND ORDERING MATERIALS AND <br />SHALL BE RESPONSIBLE FOR THE JOINING OF THERE WORK TO THE WORK OF OTHER TRADES. THE ARCHITECT OR <br />ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE COMMENCING ANY WORK, <br />8. ALL EXISTING CONDITIONS AND DESIGNATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS, THOUGH BELIEVED TO BE <br />ACCURATE, SHOULD BE CONSIDERED APPROXIMATE. IT IS CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY FIELD <br />CONDITIONS BEFORE STARTING WORK. WHERE EXISTING CONDITIONS FOUND DIFFER FROM THAT REPRESENTED ON <br />CONTRACT DOCUMENTS, NOTIFY ARCHITECT IN A WRITTEN REQUEST FOR CLARIFICATION. DO NOT PERFORM AFFECTED <br />WORK UNTIL CLARIFICATION IS OBTAINED, <br />9. THE ARCHITECT AND ENGINEER SHALL HAVE ACCESS TO THE WORK AT ALL TIMES FOR THE PURPOSE OF OBSERVING <br />CONSTRUCTION. <br />10. CONTRACTOR SHALL INSTALL ALL TEMPORARY BRACING AND SHORING TO INSURE THE SAFETY OF THE WORK UNTIL IT IS <br />IN ITS COMPLETED FORM. <br />11. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY DEMOLITION OR CONSTRUCTION AND SHALL <br />FINISH TO MATCH ADJOINING SURFACES. <br />12. A COMPLETE SET OF PRINTS WILL BE PROVIDED AND SHALL BE MAINTAINED IN GOOD ORDER AT THE SITE, ALL <br />DIFFERENCES BETWEEN THE LOCATIONS OR ARRANGEMENTS INDICATED ON THESE DRAWINGS AND THOSE OF THE <br />ACTUAL INSTALLATION SHALL BE RECORDED IN RED PEN ON THE DRAWINGS SET. AT THE END OF THE PROJECT AND <br />PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL SIGN AND DATE EACH "FINAL RECORD" DRAWING AS BEING A <br />CORRECT AND ACCURATE REPRESENTATION OF THE WORK, AND SHALL SUBMIT THE COMPLETE PACKAGE TO THE <br />OWNER. <br />13. CONTRACTOR SHALL MAINTAIN AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS, AND SHALL STORE <br />CONSTRUCTION MATERIALS IN SUITABLE AREAS ACCEPTABLE TO OWNER. <br />14. CONTRACTOR SHALL PREPARE (I.E. BUNDLE, STRAP, PALLETIZE) ALL MATERIALS FOR SALVAGE AND REUSE AND SHALL <br />MOVE TO OWNER APPROVED LOCATION. <br />15. FRAME OPENINGS IN STUD WALLS: ALLOW NO MORE THAN 2" ANNULAR GAP AND FILL WITH SUITABLE SEALANT UNLESS <br />SPECIFICALLY PROHIBITED BY REGULATORY LISTING OF THE PENETRATING ITEM. SLAB OPENINGS: ENSURE THAT SLAB <br />OPENINGS REMAINING AFTER INSTALLATION OF DUCTS, PIPING, AND CONDUITS HAVE BEEN FILLED TO THE THICKNESS OF <br />THE SLAB PENETRATED WITH MATERIAL NECESSARY TO RETAIN THE FIRE RATING OF THE FLOOR. TOP OF FIRE WALLS; <br />SHALL BE FIRE STOPPED BETWEEN THE TOP OF THE PARTITION AND ADJACENT STRUCTURE ABOVE. FIRE STOP SHALL <br />MAINTAIN THE RATING OF THE FIRE -RATED PARTITION. <br />16. EXISTING EQUIPMENT IN AREAS ADJACENT TO CONSTRUCTION SHALL REMAIN IN PLACE DURING THE WORK AND SHALL <br />BE PROTECTED BY THE CONTRACTOR. COORDINATE PROTECTION, MATERIALS AND SCHEME, WITH OWNER'S <br />REPRESENTATIVE FOR APPROVAL, <br />17. COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER INCLUDING, BUT NOT LIMITED TO, MATERIAL STORAGE, RECYCLE <br />AND TRASH BINS, DELIVERY ACCESS, NOISE, WORK AREAS AND HOURS, DISPOSITION OF REMOVED MATERIALS, AND <br />TEMPORARY FACILITIES. <br />5174 <br />REGISTERED <br />ARCHITECT <br />ROBERTA L. GH(GLIANO <br />STATE OF WASHINGTON <br />11/21/2019 <br />Permit#: B1911-01 <br />Site Address: 3003 W CASINO RD 058 <br />Owner BOEING COMPANY <br />Tenants BEING <br />App-Date: 11/27/2019 <br />Proposed Use: MEG <br />Description: NEW ROOMS FOR PAINT MIXING, <br />STORAGE, CHANGING ROOMS- -058 <br />1,Date)<?> > ? y/ <br />Reviewed Bye ems; 7 <br />Office Set lad Site Set F re -/Planning Set <br />tjvc <br />y-� @ <br />3VVA .982011 q} y <br />ens I +sJ N .3 v � pa <br />18. CONTRACTOR SHALL VERIFY EXACT SIZE, CONNECTION SIZE, LOCATION AND QUANTITY OF OWNER FURNISHED <br />EQUIPMENT, FIXTURES AND FURNISHINGS PRIOR TO INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL <br />BACKINGS, ROUGH -INS AND CONNECTIONS UNLESS OTHERWISE NOTED. <br />19. PARTITIONS, WALLS AND FURNISHINGS NOT OTHERWISE DIMENSIONED SHALL BE LOCATED FLUSH WITH ADJACENT <br />ASSEMBLIES, <br />20. STAIRS OR LADDERS USED TO ATTEND EQUIPMENT OR ROOF SHALL COMPLY WITH WSHA REGULATIONS AND THE <br />INTERNATIONAL BUILDING CODE. <br />21. "NIC" MEANS "NOT WITHIN THE WORK SCOPE OF THE PROJECT. "LION" MEANS "PROVIDE AS TYPICAL, UNLESS OTHERWISE <br />NOTED". <br />22. UNLESS OTHERWISE NOTED ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF STUDS OR CENTERLINE OF <br />COLUMNS. <br />23. CONTRACTOR SHALL REVIEW DESIGNS, INCLUDING SPECIFIC PRODUCT DATA FOR MECHANICAL, ELECTRICAL, <br />STRUCTURAL, PIPING, FIRE PROTECTION SYSTEMS AND SHALL PROVIDE CONCEALED ELEMENTS INCLUDING, BUT NOT <br />LIMITED TO, BLOCKING, ANCHORAGE, OPENINGS, SLEEVES. <br />24. VERIFY THAT WITHIN AREA OF PROJECT WORK, EXISTING EQUIPMENT THAT REQUIRES ACCESS SHALL CONTINUE TO BE <br />ACCESSIBLE AFTER PROJECT COMPLETION. FIELD VERIFY AND INFORM ARCHITECT OF ANY APPARENT EQUIPMENT <br />ACCESS CONCERNS, NO DAMPERS OR OTHER COMPONENTS REQUIRING ACCESS SHALL BE INSTALLED ABOVE HARD, ; <br />CEILING UNLESS AN EQUIPMENT ACCESS DOOR IS PROVIDED. COORDINATE EXACT LOCATION OF PIPING AND CONDUIT TO <br />MAINTAIN NECESSARY CLEARANCE ABOVE LIGHT FIXTURES AND TO ALLOW ACCESS FOR MAINTENANCE OF EQUIPMENT. <br />ACCEPTABILITY <br />UrAM4 <br />R. PINLAC <br />II' SUBTITLE <br />11,17.18 <br />COVER <br />THIS DESIGN AND/OR <br />CHECKED <br />SPECIFICATION ISAPPROVED <br />R. PINLAC <br />08.09,19 <br />TITLE <br />PFP SPAR PAINT BOOTH 1 AND 2 <br />ENGINEER <br />APPROVED BY DEFT. DATE <br />R, GHIGLIANO <br />08.0919 <br />CHECKED <br />L. COSGROVE <br />08,09.19 <br />BUILDING 40-058 <br />APPROVED <br />R, THIRTYACRE <br />08.09.19 <br />GENERAL MASTER <br />APPROVED <br />Y_,7;e 1... 1`i �.17i r<'�iKt �:" <br />vi:j ) i'"OR THE E SL <br />WORKS MIECH NICGALL FIRE <br />�10N,IE*LECTRICAI,_ 0 =; <br />PWi4il'',B P E RMITS <br />Additional Permits Are Required <br />For This Project To Include: <br />3 Plumbing ri kl r <br />Mechanical Firs; Alarm <br />Electrical <br />CITY OF EVERETT <br />REVIEWED FOR FERMI` <br />CURRENT REVISION <br />W5983281 <br />SHEET <br />ISSUED <br />—t <br />Our difference <br />is engineered, <br />www.harrisgroup.com <br />GO <br />JOB NO. <br />W5983281 <br />DWG N0. <br />EVERETT VVA <br />