My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-30
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 8:15:43 AM
Creation date
1/25/2023 1:29:20 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1911-041
Year
2019
Notes
NEW ROOMS FOR PAINT MIXING, STORAGE, CHANGING ROOMS #40-58
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVEL 1 FINISH SCHEDULE <br />GENERAL FINISH NOTES <br />1. GENERAL CONTRACTOR TO PROVIDE MOCK UPS PRIOR TO INSTALLATION. MOCK UPS TO BE PER ACTUAL FIELD CONDITIONS. <br />LEVEL 1 FINISH SCHEDULE <br />REV <br />NUMBER <br />Name <br />Floor Finish <br />Base Finish <br />Wall Finish <br />Ceiling <br />Finish <br />Notes <br />North <br />East <br />South <br />West <br />101A1 <br />STAIR Al <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101A2 <br />STAIR A2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101A4 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101131 <br />STAIR BOA <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101132 <br />CRANE HOOK <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />10184 <br />FIRE RISER <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 C2 <br />STAIR C2 <br />CON-1 <br />B-1 <br />P-1 <br />P-3 <br />P-1 <br />P-1 <br />EXP <br />101 C3 <br />AUTOCLAVE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101D1 <br />FIRE RISER <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 D2 <br />STAIR D2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 D3 <br />CONTROL ROOM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 E2 <br />STAIR E2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 F2 <br />BREAK ROOM <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 F4 <br />STAIR F4 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101G1 <br />FIRE RISER <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 G2 <br />STAIR G2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 G4 <br />BREAK RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-19 <br />APC-1 <br />101H1 <br />BOILER RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 H4A <br />FIRE RISER <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101J2 <br />STAIR J2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 K2 <br />FREEZER <br />CON-1 <br />101 L1 <br />STAIR L1 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />1011_2 <br />TRUCK DOCK <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />101 L4 <br />STAIR L4 <br />102A2 <br />MOONSHINE <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102132 <br />WEIGHT STG <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102134 <br />BREAK RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-16 <br />APC-1 <br />102C3 <br />AUTOCLAVE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102C4 <br />STAIR C4 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102D1 <br />BREAK ROOM <br />CON-1 <br />B-1 <br />P-16 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />102E1 <br />VESTIBULE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102E2 <br />STRINGER/SLIT/KIT <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102F1 <br />sELECTRICAL RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102F4 <br />ELECTRICAL RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102G1 <br />BREAK ROOM <br />CON-1 <br />B-1 <br />P-19 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />102G4 <br />CORRIDOR <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />102H1 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102H2 <br />COMPOSITE REPAIR <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102H4 <br />CORRIDOR <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />10384 <br />CORRIDOR <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />103D1 <br />CORRIDOR <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />103D2 <br />DUMBWAITER 1 <br />103E1 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />103F4 <br />103G1 <br />FIRE RISER <br />CORRIDOR <br />CON-1 <br />CON-1 <br />B-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />APC-1 <br />103G4 <br />VESTIBULE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-2 <br />103H4 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />103J2 <br />THAW <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />104132 <br />WASTE MNGT <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />10484 <br />VESTIBULE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-2 <br />104D1 <br />VESTIBULE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-2 <br />104G1 <br />VESTIBULE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-2 <br />104G4 <br />MEN RR <br />EP-1 <br />B-2 <br />CWT-1/P-1 <br />P-1 <br />P-1/P-19 <br />P-1 <br />P-2 <br />105A2 <br />TOUR LOBBY <br />CPT-1/CPT <br />_2 <br />B-1 <br />P-1/P-21 <br />P-1 <br />P-21 <br />P-1 <br />APC-1 <br />105134 <br />WOMEN RR <br />EP-1 <br />B-2 <br />P-1/P-16 <br />P-1 <br />CWT-1/P-1 <br />P-1 <br />P-2 <br />105D1 <br />WOMEN RR <br />EP-1 <br />B-2 <br />P-1/P-16 <br />P-1 <br />CWT-1/P-1 <br />P-1 <br />P-2 <br />105G1 <br />WOMEN RR <br />EP-1 <br />B-2 <br />P-1/P-19 <br />P-1 <br />CWT-1/P-1 <br />P-1 <br />P-2 <br />105G2 <br />LOCKER ROOM <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />105G4 <br />JAN <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />106132 <br />WASTE ACCUMULATION AREA <br />EPX-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />106134 <br />JAN <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />106D1 <br />JAN <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-11P-1 <br />EXP <br />106G1 <br />JAN <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />106G2 <br />CHANGE ROOM <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />106G2A <br />CLOAK STOR <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />106G4 <br />WOMEN RR <br />EP-1 <br />B-2 <br />P-1/P-19 <br />P-1 <br />CWT-1/P-1 <br />P-1 <br />P-2 <br />107B2 <br />MMO <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />107134 <br />MEN RR <br />EP-1 <br />B-2 <br />CWT-1/P-1 <br />P-1 <br />P-1/P-16 <br />P-1 <br />P-2 <br />107D1 <br />MEN RR <br />EP-1 <br />B-2 <br />CWT-1/P-1 <br />P-1 <br />P-1/P-16 <br />P-1 <br />P-2 <br />107D2 <br />CHANGE ROOM <br />CONC-1 <br />B-1 <br />P-1 <br />P_1 <br />P-1 <br />P-1 <br />EXP <br />107D2A <br />CLOAK STOR <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />107D213 <br />ELEC. <br />CONC-1 <br />107G1 <br />MEN RR <br />EP-1 <br />B-2 <br />CWT-1/P-1 <br />P-1 <br />P-1/P-19 <br />P-1 <br />P-2 <br />107G4 <br />MECH <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />108134 <br />VACUUM RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />108D2 <br />LOCKER ROOM <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />108G1 <br />STAIR G1 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />109134 <br />MECH <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />109D1 <br />109D2 <br />MECH <br />BREAK ROOM <br />CON-1 <br />CONC-1 <br />B-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />EXP <br />109D2A <br />ELEC <br />109G4 <br />_ <br />VACUUM RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />109H2 <br />STAIR H2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />110B4 <br />SERVICE CL <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE SYM <br />REVISION <br />A <br />777X CVNC NEW BUILDING - RECORD WBS 2548317 <br />AKK <br />GRK <br />01/03/17 <br />B <br />PFP SPAR PAINT BOOTH 1 AND 2 - IFC W5983281 <br />HG <br />RLT <br />11.19.19 <br />C <br />PFP SPAR PAINT BOOTH 1 AND 2 -IFP W5983281 <br />HG <br />RLT <br />11.19.19 <br />Wall Finish Ceiling <br />REV NUMBER Name Floor Finish Base Finish North East South West Finish Notes <br />110D1 <br />SERVICE CL <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />110G1 <br />VACUUM RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />110G4 <br />SERVICE CL <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />110H2 <br />MMO STORAGE <br />CONC-1 <br />B-1 <br />- <br />P-1 <br />P-1 <br />- <br />EXP <br />111D2 <br />SHIPSiDE SUPPORT <br />CPT-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />111 D2A <br />COLLAR <br />CPT-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />111 D2B <br />COLLAR <br />CPT-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />111 D2C <br />PRIVACY <br />CPT-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-1 <br />111G1 <br />MECH <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />111 H2 <br />MMO STORAGE <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />112G1 <br />SERVICE CL <br />EP-1 <br />B-2 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />FRP-1/P-1 <br />EXP <br />— <br />- <br />112H2 <br />TOOL ROOM <br />CONC-1 <br />B-1 <br />- <br />- <br />P-1 <br />P-1 <br />EXP <br />112H2A <br />VEST. <br />112K2 <br />STAIR K2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />113G1 <br />FACP ROOM <br />113K2 <br />RECEIVING <br />CONC-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />102A3 <br />PAINT STORAGE ROOM <br />EPX-1 <br />B-5 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />- <br />— <br />103A3 <br />PAINT MIX ROOM <br />EPX-1 <br />B-5 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />- <br />104A3 <br />105A3 <br />GUN CLEANING ROOM <br />CHANGING ROOM #1 <br />EPX-1 <br />EP-1 <br />B-5 <br />B-2 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 _ <br />P-1 <br />P-1 <br />- <br />P-1 <br />1 <br />2 <br />9 <br />106A3 <br />CHANGING ROOM #2 <br />EP-1 <br />B-2 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />2 <br />- <br />SPAR PAINT BOOTH # 1 <br />EPX-1 <br />- <br />- <br />- <br />- <br />- <br />- <br />3 <br />SPAR PAINT BOOTH # 2 <br />EPX-1 <br />- <br />- <br />- <br />- <br />- <br />3 <br />+]'��199ti�)►1q1 <br />a <br />LEVEL 2 FINISH SCHEDULE <br />Number <br />Name <br />Floor Finish <br />LBase Finish <br />Wall Finish <br />Ceiling <br />Finish <br />Notes <br />North <br />= East <br />- <br />South <br />West <br />201A2 <br />STAIR A2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201 B2 <br />COMM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201C2 <br />STAIR D2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201 D2 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201 E2 <br />STAIR E2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201 F2 <br />COMM <br />SDA <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />201 J2 <br />COMM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />202132 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />- <br />P-1 <br />P-1 <br />EXP <br />202D2 <br />202F2 <br />COMM <br />SYSTEMS <br />SD-1 <br />CON-1 <br />B-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />EXP <br />202H2 <br />202,12 <br />SUBSTATION <br />SYSTEMS <br />CON-1 <br />CON-1 <br />B-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />EXP <br />20382 <br />ELEC RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />203D2 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />203F2 <br />ELEC RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />203J2 <br />204D2 <br />ELEC RM <br />ELEC RM <br />CON-1 <br />CON-1 <br />B-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />EXP <br />209H2 <br />STAIR H2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />212K2 <br />STAIR K2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />219D2 <br />DUMBWAITER 1 <br />DATE <br />5174 <br />REGISTERED <br />ARCHITECT <br />m <br />ROBERTA L. GHIGLIANO <br />STATE OF WASHINGTON <br />11/21/2019 <br />ACCEPTABILITY JXM <br />THIS DESIGN AND/OR <br />CHECKED <br />SPECIFICATION IS APPROVED <br />GRK <br />ENGINEEF <br />APPROVED BY <br />DEPT. <br />DATE <br />GRK <br />CHECKED <br />t SUBTITLE <br />10/09/14 <br />10/09/14 <br />TITLE <br />10/09/14 <br />2. GENERAL CONTRACTOR SHALL PREPARE SUBMITTALS OF ALL INTERIOR FINISHES FOR AhPROVAL BY ARCHITECT PRIOR TO <br />APPLICATION. SAMPLES SHALL BE OBTAINED AND SUBMITTED IN A TIMELY MANNER. <br />3. GENERAL CONTRACTORS AND SUB CONTRACTORS TO REVIEW AND DIRECT PROPER INSTALLATION SEQUENCING OF ALL <br />APPLIED FINISH MATERIALS PRIOR TO INSTALLATION. <br />4. INSTALL ALL FLOORING BEFORE WALL AND BASE TILE. GENERAL CONTRACTOR TO PROVIDE FLOOR SURFACES THAT ARE <br />INSTALLED FLUSH AND EVEN. ADD SUFFICIENT AMOUNTS OF FLOOR PREP MATERIAL TO ACCOMMODATE ALL UNLEVEL <br />CONDITIONS AND TRANSTIONS IN CONCRETE FLOOR SLAB. CREATE FLUSH SURFACES. ALL ADJACENT FLOORS AREAS ARE TO <br />HAVE SMOOTH LEVEL TRANSITION SURFACES. ALL DOORS AND SILLS TRANSITIONS MUST BE TAKEN INTO ACCOUNT PRIOR TO <br />INSTALLATION. FLOORING CONTRACTOR TO ADJUST ALL TILE LAYOUTS PER ACTUAL BUILD OUT CONDITIONS. <br />5. FLOORING CONTRACTORS TO FURNISH AND INSTALL FLOOR TRANSITION MATERIAL WHICH WILL BE METAL SCHLUTER <br />STRIPS UNLESS OTHERWISE NOTED. FINISH TO BE SATIN STAINLESS. FIELD CONDITIONS TO BE VERIFIED BEFORE <br />ORDERING APPROPRIATE FLOORING PROFILES. MULTIPLE PROFILES WILL BE REQUIRED. TRANSITION MATERIAL REQUIRED <br />AT EACH CHANGE OF FLOORING HEIGHT, IN ADDITION TO CONCRETE AND TILE TO CARPET TRANSITIONS. FOLLOW <br />MAUNUFACTURER INSTRUCTIONS FOR EACH SCHLUTER PROFILE. DIVISION SPECIFICATIONS CALL OUT FORA SCHLUTER <br />REPRESENTATIVE TO BE ON SITE FOR PRE -CONSTRUCTION CONFERENCE MEETING. <br />6. ALL GROUT AND SEALANTS TO BE CAREFULLY CLEANED OFF OF TILES, ACCENT TILE, AND QUARTZ TOPS. <br />7. FOR ALL TILE AND BASE AT INSIDE CORNER CONDITIONS, CUT TILE ON AN ANGLE TO FORM NEAT, CLEAN AND ALIGNED <br />MATERIALS. FORM SMOOTH, CONSISTENT FINISHED EDGES AND CORNERS THROUGHOUT. NO JAGGED PIECES WILL BE ALLOWED. <br />8. ALL WALLS SHALL BE PROPERLY PREPARED, SPACKL ED, SANDED, ETC. TO PROVIDE A PERFECTLY SMOOTH FINISH AND <br />SURFACE. PAINT DRIPS MUST BE REMOVED. <br />9. UPON COMPLETION OF PAINTING, CONTRACTOR SHALL REMOVE ALL PAINT FROM SURFACES WHERE IT WAS SPILLED, <br />SPLASHED, SPLATTERED, INCLUDING SWITCH PLATES AND HARDWARE. <br />10. ALL GROUT TO BE LATICRETE, SPECKTRALOCKE PRO. KEEP ALL GROUT JOINTS MINIMAL AS POSSIBLE, SEE PRODUCT <br />RECOMMENDATIONS. <br />11. ALL CEILINGS TO BE PAINTED P-2 UNLESS OTHERWISE NOTED. <br />12. ALL DOOR AND MILLWORK SHOP DRAWINGS TO BE SUBMITTED TO ARCHITECT WITH SAMPLE MATERIALS, PRIOR TO <br />PURCHASE AND FABRICATION OF MATERIALS. <br />13. ALL MILLWORK DIMENSIONS TO BE FIELD VERIFIED PRIOR TO SHOP DRAWINGS AND FABRICATION. <br />14. SEE WRITTEN SPECIFICATION FOR ALL PAINT FINISH TYPES REQUIRED. <br />15. ALL ELECTRICAL, PHONE AND DATA RECEPTACLES LOCATED ABOVE COUNTERTOPS WILL BE MOUNTED INTO THE BACKSPLASH, <br />AND ROTATED HORIZONTALLY, UNLESS OTHERWISE NOTED. <br />16. ALL WOOD MILLWORK AND VENEER SAMPLES TO MATCH ARCHITECTS CONTROL SAMPLE FOR SPECIES, COLOR, AND STAIN. <br />17. PROVIDE ADDITIONAL WOOD WALL BLOCKING AS NECESSARY FOR ARTWORK, TV'S, WALL MICROWAVES ON SHELVES, LIGHT <br />FIXTURES, COUNTERTOPS, ETC. <br />18. ALL KITCHEN AND FOOD PREP EQUIPMENT BY OTHERS. ALL UNDER COUNTER EQUIPMENT AND FREE STANDING EQUIPMENT <br />NEEDS TO BE COORDINATED WITH CABINET SIZES, COUNTER HEIGHTS, UPPER CABINETS, ELECTRICAL AND PLUMBING LOCATIONS. <br />19. REFERENCE INTERIOR FINISH PLANS, FINISH LEGNED, FINISH SCHEDULE, INTERIOR ELEVATIONS AND SECTIONS FOR ADDITIONAL <br />INFORMATION. <br />20. ALL STONE AND QUARTZ COUNTERTOPS TO BE 3CM MATERIAL, STRAIGHT, SQUARE EDGES UNLESS OTHERWISE NOTED <br />FINISH SCHEDULE NOTES <br />FN-1 PROVIDE CWT-1 WALLS TO 8'-0" AT SHOWERS. <br />1. PROVIDE EPX-1 AT TRENCH WALLS AND FLOOR. <br />PROVIDE PRIMER AT METAL ANGLES. SEE FINISH <br />SCHEDULE LEGEND A367. <br />2. PROVIDE CWT-1 AT SHOWER. SEE INTERIOR <br />ELEVATIONS A370. <br />3. PAINT BOOTH BY VENDOR UNDER SEPARATE PERMIT. <br />SEE COATING PLAN ON A499-04 FOR EXTENT OF <br />EPDXY FINISH AT FLOOR AND TRENCHES. <br />LEVEL 3 FINISH SCHEDULE <br />REV <br />Number <br />Name <br />Floor <br />Finish <br />Base <br />Finish <br />Wall Finish <br />Ceiling <br />Finish <br />Notes <br />North <br />I East <br />South_____l <br />West <br />301 A2 <br />STAIR A2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301 B2 <br />COMM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301C2 <br />STAIR D2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301 D2 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301 E2 <br />STAIR E2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301F2 <br />MAIN COMM RM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />301J2 <br />COMM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />30282 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />302D2 <br />COMM <br />SD-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />302F2 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />302H2 <br />SUBSTATION <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />— <br />302J2 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />303132 <br />ELEC RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />303D2 <br />SYSTEMS <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />303F2 <br />ELEC RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />303J2 <br />ELEC <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />304132 <br />OFFICE ALCOVE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />304D2 <br />ELEC RM <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />305132 <br />TOOL STG <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />30682 <br />CRANE <br />MAINTENANCE <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />307132 <br />TOILET RM <br />- <br />EP-1 <br />B-2 <br />CWT-1 <br />P-1 <br />P-1 <br />P-1 <br />APC-2 <br />309H3 <br />STAIR H2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 <br />EXP <br />312K2 <br />STAIR K2 <br />CON-1 <br />B-1 <br />P-1 <br />P-1 <br />P-1 <br />P-1 JEXP <br />ARCHITECTURAL MASTER <br />PERMITISSUED FOR <br />Our difference <br />I <br />is engineered. <br />www.harrisgroup.com <br />: <br />: s REVISION "C" ONLY <br />" PROJECT NO: 0012630.06 <br />CITY Oil EVE DRAWN: RVP PROJ MGR: REP <br />REVIEWED FOR " PERMIT ENGINEER: RLG APPROVED: RLT <br />CHECKED: LCC DATE: 11.19.19 <br />CURRENT REVISION SYMBOL DATE <br />W5983281 11.19.19 <br />SHEET <br />A365 <br />JOB N0. COMP NO. <br />W2548317 <br />DWG NO. <br />EVERETT, WA 40-058-A365 <br />