SYM
<br />REVISION
<br />BY
<br />APPROVED
<br />DATE SYM
<br />A
<br />PGB STRINGER BLADE - IFC EXCAVATIONiREMOVAL W6164105
<br />HG
<br />RLT
<br />12.18.19
<br />B
<br />PGB STRINGER BLADE - IFC FOUNDATION W6164105
<br />HG
<br />RLT
<br />02,13.20
<br />C c a „fub r
<br />S
<br />rF �
<br />77777,
<br />'I
<br />a 3e ra
<br />w
<br />0
<br />'.�.� a., �.,.rs:� G_`:,,ss .'}. .; ?_aM>�.�'�" �a •�a v�,.: " � � ,: � ai .a4�:�,$ �. � *� .,'a_� .:. .>:�. e. �,'�"aa
<br />2
<br />x
<br />.. �s`� � � �- � xis... v �- .��'WASHINGTON
<br />v`u`..e..s.. �x�;-°.'7_,±+.,e "k,f,.'r�"n'p. 98203
<br />REVISION I BY I APPROVED I DATE
<br />1. WORK SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS,
<br />2. CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND SECURITY
<br />REGULATIONS.
<br />3. CONTRACTOR SHALL PROVIDE EQUIPMENT SUPPORT INCLUDING SEISMIC RESTRAINT.
<br />4. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN
<br />IN FULL.
<br />5. THE GENERAL CONTRACTOR AND RESPECTIVE SUBCONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF
<br />ARCHITECTURAL, STRUCTURAL, MECHANICAL & ELECTRICAL WORK. ARCHITECTURAL, STRUCTURAL, MECHANICAL &
<br />ELECTRICAL DRAWINGS SHALL BE REFERRED TO IN DETAIL FOR COORDINATION OF SPECIFIC REQUIREMENTS.
<br />6. CONTRACTOR SHALL PROVIDE ALL WORK SHOWN AND /OR NOTED ON THESE DRAWINGS, INCLUDING ALL LABOR,
<br />MATERIALS, AND SERVICES REQUIRED FOR THE SATISFACTORY COMPLETION OF WORK SHOWN ON THESE DRAWING,
<br />7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND ORDERING MATERIALS AND
<br />SHALL BE RESPONSIBLE FOR THE JOINING OF HIS WORK TO THE WORK OF OTHER TRADES. THE ARCHITECT OR ENGINEER
<br />SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE COMMENCING ANY WORK.
<br />8. ALL EXISTING CONDITIONS AND DESIGNATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS, THOUGH BELIEVED TO BE
<br />ACCURATE, SHOULD BE CONSIDERED APPROXIMATE. IT IS CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY FIELD
<br />CONDITIONS BEFORE STARTING WORK. WHERE EXISTING CONDITIONS FOUND DIFFER FROM THAT REPRESENTED ON
<br />CONTRACT DOCUMENTS, NOTIFY ARCHITECT IN A WRITTEN REQUEST FOR CLARIFICATION. DO NOT PERFORM AFFECTED
<br />WORK UNTIL CLARIFICATION IS OBTAINED.
<br />9. THE ARCHITECT AND ENGINEER SHALL HAVE ACCESS TO THE WORK AT ALL TIMES FOR THE PURPOSE OF OBSERVING
<br />CONSTRUCTION.
<br />10. CONTRACTOR SHALL INSTALL ALL TEMPORARY BRACING AND SHORING TO INSURE THE SAFETY OF THE WORK UNTIL IT IS
<br />IN ITS COMPLETED FORM.
<br />11. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY DEMOLITION OR CONSTRUCTION AND SHALL
<br />FINISH TO MATCH ADJOINING SURFACES.
<br />12. A COMPLETE SET OF PRINTS WILL BE PROVIDED AND SHALL BE MAINTAINED IN GOOD ORDER AT THE SITE, ALL
<br />DIFFERENCES BETWEEN THE LOCATIONS OR ARRANGEMENTS INDICATED ON THESE DRAWINGS AND THOSE OF THE
<br />ACTUAL INSTALLATION SHALL BE RECORDED IN RED PEN ON THE DRAWINGS SET. AT THE END OF THE PROJECT AND
<br />PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL SIGN AND DATE EACH "FINAL RECORD" DRAWING AS BEING A
<br />CORRECT AND ACCURATE REPRESENTATION OF THE WORK, AND SHALL SUBMIT THE COMPLETE PACKAGE TO THE
<br />OWNER.
<br />13. CONTRACTOR SHALL MAINTAIN AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS, AND SHALL STORE
<br />CONSTRUCTION MATERIALS IN SUITABLE AREAS ACCEPTABLE TO OWNER.
<br />14. CONTRACTOR SHALL PREPARE (LE. BUNDLE, STRAP, PALLETIZE) ALL MATERIALS FOR SALVAGE AND REUSE AND SHALL
<br />MOVE TO OWNER APPROVED LOCATION.
<br />15. FRAME OPENINGS IN STUD WALLS: ALLOW NO MORE THAN 2' ANNULAR GAP AND FILL WITH SUITABLE SEALANT UNLESS
<br />SPECIFICALLY PROHIBITED BY REGULATORY LISTING OF THE PENETRATING ITEM. SLAB OPENINGS: ENSURE THAT SLAB
<br />OPENINGS REMAINING AFTER INSTALLATION OF DUCTS, PIPING, AND CONDUITS HAVE BEEN FILLED TO THE THICKNESS OF
<br />THE SLAB PENETRATED WITH MATERIAL NECESSARY TO RETAIN THE FIRE RATING OF THE FLOOR. TOP OF FIRE WALLS;
<br />SHALL BE FIRE STOPPED BETWEEN THE TOP OF THE PARTITION AND ADJACENT STRUCTURE ABOVE. FIRE STOP SHALL
<br />MAINTAIN THE RATING OF THE FIRE -RATED PARTITION.
<br />16. EXISTING EQUIPMENT IN AREAS ADJACENT TO CONSTRUCTION SHALL REMAIN IN PLACE DURING THE WORK AND SHALL
<br />BE PROTECTED BY THE CONTRACTOR. COORDINATE PROTECTION, MATERIALS AND SCHEME, WITH OWNER'S
<br />REPRESENTATIVE FOR APPROVAL.
<br />17. COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER INCLUDING, BUT NOT LIMITED TO, MATERIAL STORAGE, RECYCLE
<br />AND TRASH BINS, DELIVERY ACCESS, NOISE, WORK AREAS AND HOURS, DISPOSITION OF REMOVED MATERIALS, AND
<br />TEMPORARY FACILITIES.
<br />m�
<br />NONAL
<br />ACCEPTABILITY
<br />THIS DESIGN AND/OR
<br />SPECIFICATION IS APPROVED
<br />APPROVED BY DEPT.
<br />18. CONTRACTOR SHALL VERIFY EXACT SIZE AND QUANTITY TAKEOFFS, CONNECTION SIZE, LOCATION AND QUANTITY
<br />OWNER FURNISHED FOR EQUIPMENT, FIXTURES AND FURNISHINGS PRIOR TO INSTALLATION. CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR ALL BACKINGS, ROUGH -INS AND CONNECTIONS UNLESS OTHERWISE NOTED.
<br />19. PARTITIONS, WALLS AND FURNISHINGS NOT OTHERWISE DIMENSIONED SHALL BE LOCATED FLUSH WITH ADJACENT
<br />ASSEMBLIES,
<br />20. STAIRS OR LADDERS USED TO ATTEND EQUIPMENT OR ROOF SHALL COMPLY WITH WSHA REGULATIONS AND THE
<br />INTERNATIONAL BUILDING CODE.
<br />21. "NIC" MEANS "NOT WITHIN THE WORK SCOPE OF THE PROJECT. "LION" MEANS "PROVIDE AS TYPICAL, UNLESS OTHERWISE
<br />NOTED".
<br />22. UNLESS OTHERWISE NOTED ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF STUDS OR CENTERLINE OF
<br />COLUMNS UNLESS OTHERWISE NOTED.
<br />23. CONTRACTOR SHALL REVIEW DESIGNS, INCLUDING SPECIFIC PRODUCT DATA FOR MECHANICAL, ELECTRICAL,
<br />STRUCTURAL, PIPING, FIRE PROTECTION SYSTEMS AND SHALL PROVIDE CONCEALED ELEMENTS INCLUDING, BUT NOT
<br />LIMITED TO, BLOCKING, ANCHORAGE, OPENINGS, SLEEVES,
<br />24. VERIFY THAT WITHIN AREA OF PROJECT WORK, EXISTING EQUIPMENT THAT REQUIRES ACCESS SHALL CONTINUE TO BE
<br />ACCESSIBLE AFTER PROJECT COMPLETION. FIELD VERIFY AND INFORM ARCHITECT OF ANY APPARENT EQUIPMENT
<br />ACCESS CONCERNS, NO DAMPERS OR OTHER COMPONENTS REQUIRING ACCESS SHALL BE INSTALLED ABOVE HARD
<br />CEILING UNLESS AN EQUIPMENT ACCESS DOOR IS PROVIDED. COORDINATE EXACT LOCATION OF PIPING AND CONDUIT TO
<br />MAINTAIN NECESSARY CLEARANCE ABOVE. LIGHT FIXTURES AND TO ALLOW ACCESS FOR MAINTENANCE OF EQUIPMENT.
<br />H"
<br />o S
<br />,fI
<br />�. r� d r
<br />I p _ s �is, s r_'
<br />E Rf+ i-f1 4
<br />£'iaa r ,rw 3 tau ems'.°.
<br />4 �c.a l.%3�8�,.. ri �.:�8 Cw. 'v ����Is..�• ?���.,. a „3;a ��u
<br />DRAINN
<br />DATE
<br />SUBTITLE
<br />R, PINLAC
<br />10.03.19
<br />COVER SHEET
<br />CHECKED
<br />R. PINLAC
<br />12A8.19
<br />ENGINEER
<br />TITLE P
<br />GB STRINGER BLADE
<br />DATE J. HUGHES
<br />12.18,19
<br />CHECKED
<br />A, WARNER
<br />12.18,19
<br />BUILDING 40-058
<br />APPROVED
<br />R. PLUCINSKI
<br />12.18.19
<br />GENERAL MASTER
<br />APPROVED
<br />R. THiRTYACRE
<br />12,18J9
<br />EVRETT, WA IDwG No.
<br />Permit#: B2002--042
<br />Site Address: 3003 W CASINO RD 58,E
<br />Cwner: BOEING COMPANY
<br />Tenant: BOEINO COMPANY
<br />App.Date: 2/26/2020
<br />Proposed Use: MFG
<br />Description: PG13 STRINGER BLADE FORMING EING
<br />#40-53
<br />Reviewed B te r". Date:
<br />.k Cffice Set Job Site Set Fire/Planning Set
<br />i
<br />Our difference
<br />Tr l
<br />is engineered.
<br />apt � www.harrisgroup.com
<br />PROJECT NO: 0012630.09
<br />TE
<br />02.13.20
<br />COMP NO,
<br />
|