Laserfiche WebLink
SYM <br />REVISION <br />BY <br />APPROVED <br />DATE SYM <br />A <br />PGB STRINGER BLADE - IFC EXCAVATIONiREMOVAL W6164105 <br />HG <br />RLT <br />12.18.19 <br />B <br />PGB STRINGER BLADE - IFC FOUNDATION W6164105 <br />HG <br />RLT <br />02,13.20 <br />C c a „fub r <br />S <br />rF � <br />77777, <br />'I <br />a 3e ra <br />w <br />0 <br />'.�.� a., �.,.rs:� G_`:,,ss .'}. .; ?_aM>�.�'�" �a •�a v�,.: " � � ,: � ai .a4�:�,$ �. � *� .,'a_� .:. .>:�. e. �,'�"aa <br />2 <br />x <br />.. �s`� � � �- � xis... v �- .��'WASHINGTON <br />v`u`..e..s.. �x�;-°.'7_,±+.,e "k,f,.'r�"n'p. 98203 <br />REVISION I BY I APPROVED I DATE <br />1. WORK SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS, <br />2. CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND SECURITY <br />REGULATIONS. <br />3. CONTRACTOR SHALL PROVIDE EQUIPMENT SUPPORT INCLUDING SEISMIC RESTRAINT. <br />4. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN <br />IN FULL. <br />5. THE GENERAL CONTRACTOR AND RESPECTIVE SUBCONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF <br />ARCHITECTURAL, STRUCTURAL, MECHANICAL & ELECTRICAL WORK. ARCHITECTURAL, STRUCTURAL, MECHANICAL & <br />ELECTRICAL DRAWINGS SHALL BE REFERRED TO IN DETAIL FOR COORDINATION OF SPECIFIC REQUIREMENTS. <br />6. CONTRACTOR SHALL PROVIDE ALL WORK SHOWN AND /OR NOTED ON THESE DRAWINGS, INCLUDING ALL LABOR, <br />MATERIALS, AND SERVICES REQUIRED FOR THE SATISFACTORY COMPLETION OF WORK SHOWN ON THESE DRAWING, <br />7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND ORDERING MATERIALS AND <br />SHALL BE RESPONSIBLE FOR THE JOINING OF HIS WORK TO THE WORK OF OTHER TRADES. THE ARCHITECT OR ENGINEER <br />SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE COMMENCING ANY WORK. <br />8. ALL EXISTING CONDITIONS AND DESIGNATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS, THOUGH BELIEVED TO BE <br />ACCURATE, SHOULD BE CONSIDERED APPROXIMATE. IT IS CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY FIELD <br />CONDITIONS BEFORE STARTING WORK. WHERE EXISTING CONDITIONS FOUND DIFFER FROM THAT REPRESENTED ON <br />CONTRACT DOCUMENTS, NOTIFY ARCHITECT IN A WRITTEN REQUEST FOR CLARIFICATION. DO NOT PERFORM AFFECTED <br />WORK UNTIL CLARIFICATION IS OBTAINED. <br />9. THE ARCHITECT AND ENGINEER SHALL HAVE ACCESS TO THE WORK AT ALL TIMES FOR THE PURPOSE OF OBSERVING <br />CONSTRUCTION. <br />10. CONTRACTOR SHALL INSTALL ALL TEMPORARY BRACING AND SHORING TO INSURE THE SAFETY OF THE WORK UNTIL IT IS <br />IN ITS COMPLETED FORM. <br />11. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY DEMOLITION OR CONSTRUCTION AND SHALL <br />FINISH TO MATCH ADJOINING SURFACES. <br />12. A COMPLETE SET OF PRINTS WILL BE PROVIDED AND SHALL BE MAINTAINED IN GOOD ORDER AT THE SITE, ALL <br />DIFFERENCES BETWEEN THE LOCATIONS OR ARRANGEMENTS INDICATED ON THESE DRAWINGS AND THOSE OF THE <br />ACTUAL INSTALLATION SHALL BE RECORDED IN RED PEN ON THE DRAWINGS SET. AT THE END OF THE PROJECT AND <br />PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL SIGN AND DATE EACH "FINAL RECORD" DRAWING AS BEING A <br />CORRECT AND ACCURATE REPRESENTATION OF THE WORK, AND SHALL SUBMIT THE COMPLETE PACKAGE TO THE <br />OWNER. <br />13. CONTRACTOR SHALL MAINTAIN AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS, AND SHALL STORE <br />CONSTRUCTION MATERIALS IN SUITABLE AREAS ACCEPTABLE TO OWNER. <br />14. CONTRACTOR SHALL PREPARE (LE. BUNDLE, STRAP, PALLETIZE) ALL MATERIALS FOR SALVAGE AND REUSE AND SHALL <br />MOVE TO OWNER APPROVED LOCATION. <br />15. FRAME OPENINGS IN STUD WALLS: ALLOW NO MORE THAN 2' ANNULAR GAP AND FILL WITH SUITABLE SEALANT UNLESS <br />SPECIFICALLY PROHIBITED BY REGULATORY LISTING OF THE PENETRATING ITEM. SLAB OPENINGS: ENSURE THAT SLAB <br />OPENINGS REMAINING AFTER INSTALLATION OF DUCTS, PIPING, AND CONDUITS HAVE BEEN FILLED TO THE THICKNESS OF <br />THE SLAB PENETRATED WITH MATERIAL NECESSARY TO RETAIN THE FIRE RATING OF THE FLOOR. TOP OF FIRE WALLS; <br />SHALL BE FIRE STOPPED BETWEEN THE TOP OF THE PARTITION AND ADJACENT STRUCTURE ABOVE. FIRE STOP SHALL <br />MAINTAIN THE RATING OF THE FIRE -RATED PARTITION. <br />16. EXISTING EQUIPMENT IN AREAS ADJACENT TO CONSTRUCTION SHALL REMAIN IN PLACE DURING THE WORK AND SHALL <br />BE PROTECTED BY THE CONTRACTOR. COORDINATE PROTECTION, MATERIALS AND SCHEME, WITH OWNER'S <br />REPRESENTATIVE FOR APPROVAL. <br />17. COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER INCLUDING, BUT NOT LIMITED TO, MATERIAL STORAGE, RECYCLE <br />AND TRASH BINS, DELIVERY ACCESS, NOISE, WORK AREAS AND HOURS, DISPOSITION OF REMOVED MATERIALS, AND <br />TEMPORARY FACILITIES. <br />m� <br />NONAL <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY DEPT. <br />18. CONTRACTOR SHALL VERIFY EXACT SIZE AND QUANTITY TAKEOFFS, CONNECTION SIZE, LOCATION AND QUANTITY <br />OWNER FURNISHED FOR EQUIPMENT, FIXTURES AND FURNISHINGS PRIOR TO INSTALLATION. CONTRACTOR SHALL BE <br />RESPONSIBLE FOR ALL BACKINGS, ROUGH -INS AND CONNECTIONS UNLESS OTHERWISE NOTED. <br />19. PARTITIONS, WALLS AND FURNISHINGS NOT OTHERWISE DIMENSIONED SHALL BE LOCATED FLUSH WITH ADJACENT <br />ASSEMBLIES, <br />20. STAIRS OR LADDERS USED TO ATTEND EQUIPMENT OR ROOF SHALL COMPLY WITH WSHA REGULATIONS AND THE <br />INTERNATIONAL BUILDING CODE. <br />21. "NIC" MEANS "NOT WITHIN THE WORK SCOPE OF THE PROJECT. "LION" MEANS "PROVIDE AS TYPICAL, UNLESS OTHERWISE <br />NOTED". <br />22. UNLESS OTHERWISE NOTED ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF STUDS OR CENTERLINE OF <br />COLUMNS UNLESS OTHERWISE NOTED. <br />23. CONTRACTOR SHALL REVIEW DESIGNS, INCLUDING SPECIFIC PRODUCT DATA FOR MECHANICAL, ELECTRICAL, <br />STRUCTURAL, PIPING, FIRE PROTECTION SYSTEMS AND SHALL PROVIDE CONCEALED ELEMENTS INCLUDING, BUT NOT <br />LIMITED TO, BLOCKING, ANCHORAGE, OPENINGS, SLEEVES, <br />24. VERIFY THAT WITHIN AREA OF PROJECT WORK, EXISTING EQUIPMENT THAT REQUIRES ACCESS SHALL CONTINUE TO BE <br />ACCESSIBLE AFTER PROJECT COMPLETION. FIELD VERIFY AND INFORM ARCHITECT OF ANY APPARENT EQUIPMENT <br />ACCESS CONCERNS, NO DAMPERS OR OTHER COMPONENTS REQUIRING ACCESS SHALL BE INSTALLED ABOVE HARD <br />CEILING UNLESS AN EQUIPMENT ACCESS DOOR IS PROVIDED. COORDINATE EXACT LOCATION OF PIPING AND CONDUIT TO <br />MAINTAIN NECESSARY CLEARANCE ABOVE. LIGHT FIXTURES AND TO ALLOW ACCESS FOR MAINTENANCE OF EQUIPMENT. <br />H" <br />o S <br />,fI <br />�. r� d r <br />I p _ s �is, s r_' <br />E Rf+ i-f1 4 <br />£'iaa r ,rw 3 tau ems'.°. <br />4 �c.a l.%3�8�,.. ri �.:�8 Cw. 'v ����Is..�• ?���.,. a „3;a ��u <br />DRAINN <br />DATE <br />SUBTITLE <br />R, PINLAC <br />10.03.19 <br />COVER SHEET <br />CHECKED <br />R. PINLAC <br />12A8.19 <br />ENGINEER <br />TITLE P <br />GB STRINGER BLADE <br />DATE J. HUGHES <br />12.18,19 <br />CHECKED <br />A, WARNER <br />12.18,19 <br />BUILDING 40-058 <br />APPROVED <br />R. PLUCINSKI <br />12.18.19 <br />GENERAL MASTER <br />APPROVED <br />R. THiRTYACRE <br />12,18J9 <br />EVRETT, WA IDwG No. <br />Permit#: B2002--042 <br />Site Address: 3003 W CASINO RD 58,E <br />Cwner: BOEING COMPANY <br />Tenant: BOEINO COMPANY <br />App.Date: 2/26/2020 <br />Proposed Use: MFG <br />Description: PG13 STRINGER BLADE FORMING EING <br />#40-53 <br />Reviewed B te r". Date: <br />.k Cffice Set Job Site Set Fire/Planning Set <br />i <br />Our difference <br />Tr l <br />is engineered. <br />apt � www.harrisgroup.com <br />PROJECT NO: 0012630.09 <br />TE <br />02.13.20 <br />COMP NO, <br />