My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2020 BLDG 40-58 Plans 2023-01-27
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2020 BLDG 40-58 Plans 2023-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2023 3:09:30 PM
Creation date
1/25/2023 1:44:46 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B2002-042
Year
2020
Notes
PGB STRINGER BLADE FORMING-BOEING #40-58.1
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL TUNNEL PLAN - LEVEL 1 <br />LEGEND <br />1. SEE SHEET S2. <br />2. T - X TUNNEL TYPE, SEE SHEET S267 FOR <br />TYP TUNNEL SECTION AND SCHEDULE <br />GENERAL NOTES <br />CONSTRUCTION NOTES <br />REFERENCE DRAWINGS <br />.3 .7 .7 .1 <br />A <br />B <br />c <br />D <br />E <br />F <br />®T G <br />R M 16 T. <br />H <br />CONSTRUCTION J <br />FOUNDATION - 02.13.20 <br />K <br />I Our difference <br />is engineered. <br />L <br />www.harrisgroup.com <br />REVISION "B" ONLY <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />[ml <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />SCALE: 1/8" =1'-O" V PROJECT NO: 0012630.09 0 @ .3 .7 .7 .1 <br />v DRAWN: RVP PROJ MGR: REP 0 4' 8' 16' 24' <br />ENGINEER: AB APPROVED: RLT <br />SCALE: 1 /8" = l'-0" <br />CHECKED: AMW DATE: 02.13.20 <br />DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br />W6164105 <br />SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �gO M. T,> ACCEPTABILITY MEM 10/09/14 <br />�F WAs� � THIS DESIGN AND/OR CHECKED TUNNEL PLAN - LEVEL 1 <br />A 777X CWC NEW BUILDING - RECORD WBS 2548317 KRW DPB 01/03/17 5� J�'��, j� SPECIFICATION IS APPROVED AHM 10/09/14 SHEET <br />� <br />B PGB STRINGER BLADE - IFC FOUNDATION W6164105 HG RLT 02.13.20 o ENGINEER TITLE PGB STRINGER BLADE O r APPROVED BY DEPT. DATE ppg 10/09/14 TWS10-40 <br />CHECKED <br />� 5343APPROVED - BUILDING 40 058 <br />JOB N0. COMP N0. 6 � W� <br />�GISTEg�'' <br />`SSIONAL E��� 13/2020 APPROVED STRUCTURAL MASTER COL. 1-1.30/G-H EVERETT, WA °wGNo. 40-058-TN1S10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.