Laserfiche WebLink
SEE 1 E9-04 <br />1 �E <br />�gg� II <br />3 VACUUM PE4 <br />L <br />3 1= <br />8 <br />E509-2 <br />I"TI 9Q1Ei <br />I ! <br />4 ___. .. <br />VESTIBULE <br />._ <br />r8 <br />I f <br />€ <br />E509-1 / <br />E x, <br />(TYPICAL) <br />3GR? <br />I <br />I uUBSrAkION <br />I <br />I_ <br />1 � <br />t> 3 <br />€ <br />k <br />3 i <br />3 <br />i I <br />I <br />i <br />si ELECTRICAL RM <br />I� it i <br />i II <br />°r ! <br />I44 <br />i <br />Ek <br />i <br />I li �� <br />I II <br />�I <br />I �I <br />3 <br />, �bl € � i <br />FIRE Ri:AF --- § <br />Ir i <br />',l4 I <br />BREAK ROOM <br />77jj � i <br />SEE 1E9-�_ <br />CORPIDO <br />f i <br />l i ES71B sL <br />SYM I REVISION <br />0 ISSUE FOR CONSTRUCTION <br />1 REVISION - RELEASE 32 <br />2 REVISION - RELEASE 37 <br />3 REVISION - RELEASE 43 <br />A 777X CWC NEW BUILDING - RECORD <br />l I_ _1 <br />s- <br />I F <br />F <br />-4— <br />BY <br />APPROVED <br />DATE <br />SYM <br />I REVISION <br />JLM <br />FAK <br />12/05/14 <br />B <br />PGB STRINGER BLADE - IFC FOUNDATION <br />JLM <br />DFC <br />12101/15 <br />JTD <br />DFC <br />020/16 <br />RER <br />DFC <br />05117/16 <br />WBS 2548317 <br />JMG <br />DFC <br />03109/17 <br />i <br />m <br />PARTIAL GROUNDING PLAN <br />SCALE: 1 /16" = V-0" <br />BY APPROVED DATE <br />W6164105 HG RLT 02.13.20 <br />I I <br />i <br />LEGEND <br />SEE LEGEND SHEET EO & E1 FOR ABBREVIATIONS & NOTES. <br />GENERAL NOTES <br />REFER TO SHEETS E509-1, E509-2 & E509-3 FOR GROUNDING <br />DETAILS. COORDINATE WITH DIVISION 27 DRAWINGS AND <br />SPECIFICATIONS FOR GROUNDING REQUIREMENTS. <br />GROUND ROD LOCATIONS SHOWN ARE APPROXIMATE. <br />CONTRACTOR TO ESTABLISH FINAL LOCATIONS. <br />COUNTERPOISE SHALL BE CONNECTED TO STEEL COLUMNS <br />AROUND THE PERIMETER OF THE STRUCTURE AT INTERVALS <br />AVERAGING NOT MORE THAN 60 FEET. <br />GROUNDING SHOWN DIAGRAMMATICAL. CONTRACTOR TO <br />ESTABLISH FINAL ROUTING TO AVOID DOORS AND OTHER <br />OBSTRUCTIONS. <br />ALL GROUNDING SHALL BE IN COMPLIANCE WITH 2O14 NEC, <br />STATE OF WASHINGTON CODES AND REGULATIONS, AND <br />BOEING STANDARDS AND SPECS. <br />#4/0 AWG BARE STRANDED COPPER. MIN. 2'-6" BELOW GRADE. <br />GROUND ROD MIN 24 FROM FOUNDATION WALL (TYP). SEE <br />SHEET E509-2 DETAIL 7. <br />EXOTHERMIC WELD OR BURNDY HYGROUND (TYP). <br />PROVIDE 2" CONDUIT SLEEVE IN SLAB. PROVIDE #4/0 AWG BARE <br />COPPER GROUNDING CONDUCTOR FROM NEAREST BUILDING <br />STEEL OR GROUND LOOP LOCATION. SEAL PENETRATION PER <br />RO P IF T NS <br />y i 9. INSTALL ARMORED EDGE GROUNDING PER DETAIL 4 ON SHEET <br />�" <br />E509-3. <br />€ 10 #4/0 AWG BARE STRANDED COPPER GROUND WIRE INSTALLED <br />i 3 i <br />IN TOOL FOUNDATION. <br />._ I; <br />11 BOND TO FOUNDATION REBAR. <br />. ____ .-75 <br />i 12 BOND TO TOOLING EQUIPMENT AS REQUIRED BY <br />I MANUFACTURER. <br />- — — — <br />v <br />s <br />CONSTRUCTION NOTES <br />^ tl <br />I <br />L <br />1. COORDINATE EXACT LOCATION OF DEVICES AND EQUIPMENT CONNECTIONS IN <br />-w-..._ <br />FIELD BEFORE WORK IS TO BEGIN. <br />- OF TOOL SUPPORTS ARE �- 2. ENSURE THAT EXP <br />OSED METALLIC FEATURES <br />_ --------- <br />------- �.� .�. WELDED TO FOUNDATION STEEL TO PROVIDE A CONTINUOUS BOND WITH THE <br />FOUNDATION GROUNDING SYSTEM. PROVIDE ADDITIONAL BONDING JUMPERS <br />AS NECESSARY. SUCH METALLIC FEATURES SHALL BE BONDED SUCH THAT <br />_______ <br />THEY MEET OR EXCEED THE PERFORMANCE REQ UIREMENTS FOR ELECTRODE <br />07-72 <br />SYSTEM RESISTANCE MEASUREMENTS OUTLINED IN PROJECT SPECIFICATIONS. <br />I ..._ —-..__.__m _ _. ___.__ _.__ 3j : CONTRACTOR SHALL PROVIDE AND TIE-IN #2 AWG BARE STRANDED COPPER <br />CONDUCTOR TO GROUNDING PUCKS BY OTHERS BY BOLTED CONNECTION <br />FOR TOOLING STATIC GROUND. BOND TO #4/0 AWG GROUND CONDUCTOR IN <br />TRENCH, ROUTE GROUND CONDUCTOR UNDER MTB LANES TO PUCK <br />LOCATIONS VIA 2X2 INCH RIBBON TRENCH. PROTECT WITH PVC CONDUIT AS <br />.... � REQUIRED. COORDINATE WITH BOEING FOR FINAL STATIC GROUND LOCATION, <br />}}�gg y F.25 -... CONNECTION POINT AND ROUTING. <br />_ ...a._. ..i..-. _ T �A _ � �,.�.._. <br />_ _ FURNISH AND INSTALL #4/0 AWG BARE STRANDED COPPER CONDUCTOR IN <br />a TRENCH AND PROTECT WITH PVC CONDUIT AS REQUIRED. <br />� Al Al At, <br />D1ts�;N� ACCEPTABILITY JAH <br />OF WA g� j d� THIS DESIGN AND/OR CHE( <br />SPECIFICATION IS APPROVED JTD <br />B®WAZAW" ® r1v _ 00 <br />0 ENGI <br />x APPROVED BY DEPT. DATE DFC <br />CHE( <br />r. <br />� O�51289 w� AM ' ��'GISTEg�' <br />APPF <br />02/1 2020 <br />C6� <br />E SUBTITLE <br />03109/17 <br />03/09/17 <br />TITLE <br />03/09/17 <br />ELECTRICAL MASTER <br />tv.�vw r vn <br />CONSTRUCTION <br />FOUNDATION - 02.13.20 <br />I Our difference <br />is engineered. <br />www.hardsgroup.com <br />REVISION "B" ONLY <br />PROJECT NO: 0012630.09 <br />DRAWN: PF PROJ MGR: REP <br />ENGINEER: NHD APPROVED: RLT <br />CHECKED: MWD DATE: 02.13.20 <br />PARTIAL GROUNDING PLAN <br />PGB STRINGER BLADE <br />BUILDING 40-058 <br />COL. 1.00-1.75/E 25-G.09 <br />REFERENCE DRAWINGS <br />1. FOR LEGENDS AND ABBREVIATIONS SEE SHEET EO AND E1. <br />2. REFER TO SHEETS E509-1, E509-2 & E509-3 FOR GROUNDING DETAILS. <br />3. 1 E9-04. <br />4, 1 E9-10. <br />.7 .7 .1 <br />A <br />3 <br />-1 <br />-2 <br />- <br />I <br />Q -4 <br />I <br />F <br />T <br />-8 <br />-10 <br />f <br />-11 <br />-12 <br />I <br />-13 <br />-14 <br />-15 <br />I <br />7 .710 <br />0 8' 16' <br />1 <br />32' <br />48' <br />SCALE: 1/16" = V-0" <br />CURRENT REVISION <br />W6164105 <br />SYMBOL <br />B <br />DATE <br />02.13.20 <br />< <br />SHEET <br />1 E9-07 <br />JOB NO. <br />COMP NO. <br />40-58-1 E9-07 <br />c <br />EVERETT, WA <br />DWG N0. <br />40-058-1 E9-07 <br />