Laserfiche WebLink
SCALE: 1/8" = TI <br />1 Cn-CAIn <br />B U SLAB ON GRADE, SEE SHEET 8268 FOR SLAB ON GRADE SCHEDULE <br />CJ CONTROL/CONSTRUCTION JOINT, SEE SHEET S280 FOR DETAILS <br />FE EXISTING <br />DEMOIREMOVAL <br />GENErl RAL NOTES <br />B.. 'VI ___ 'VI ___., <br />CONSTRUCTION NOTES <br />EXTENT OF SAWCUT, SAWCUT FULL DEPTH OF SLAB, SEE SLAB SCHEDULE <br />S268. <br />® NOT USED. <br />3 CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EXISTING TUNNEL WALL <br />DURING SAW -CUTTING. <br />4� REMOVE THE (E) TRENCH WALL TO EL 96-0". <br />REMOVE THE (E) TRENCH AND EXCAVATE TO EL 94'-6". <br />REMOVE THE (E) SLAB AND TRENCH WALL TO EL 98'1 <br />7. CONTRACTOR TO VERIFY LOCATION OF EXISTING BURIED UTILITIES PRIOR <br />TO SAWCUTTING AND EXCAVATION. <br />8. CONTRACTOR TO PROVIDE DUST MITIGATION DURING SAWCUTTING, <br />EXCAVATION, AND CONSTRUCTION. <br />REFERENCE D11 RAWINGS <br />40-058-S268 SCHEDULES <br />40-050-S280 CONCRETE DETAILS <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />rx5 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />PROJECT NO: 0012630.09 G GO 7 i a 61 60 <br />DRAWN: RVP PROJ MGR: REP 0 4' 8' 16' 24' <br />ENGINEER: AB APPROVED: RLT <br />SCALE: 1 /8" = l'-0" <br />CHECKED: AMW DATE: 02.13.20 <br />SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br />g® M. ACCEPTABILITY MEM 10109114 <br />A 777X CWC NEW BUILDING - RECORD WBS 2548317 KRW DPB 01/03/17 13 WAsk �� THIS DESIGN AND/OR CHECKED REMOVAL - SLAB PLAN W6164105 c 12.18.19 <br />SPECIFICATION IS APPROVED AHM 10/09/14 SHEET <br />B PGB STRINGER BLADE IFC EXCAVATION/REMOVAL W6164105 HG RLT 12.18.19 ® . ° DPB-ENGINEER 10/09/14 TITLE PGB STRINGER BLADE <br />' � _ � � APPROVED BY DEPT. DATE 1 S60R-25 <br />C PGB STRINGER BLADE - IFC FOUNDATION W6164105 HG RLT 02.13.20 CHECKED <br />� 1�16 53436 � <br />APPROVED BUILDING 40-05 R V JOB NO. <br />r�7 <br />®�' ��GISTEg���� <br />�SSI®NAL �laizozo APPROVED STRUCTURAL MASTER COL..10-1.351D-E EVERETT, WA DWG NO. 40-058-1 S60R <br />I <br />