|
y I , --- q
<br />j
<br />A g jr
<br />V
<br />r
<br />77.
<br />7-1
<br />'D
<br />Bq j
<br />ti� H
<br />K
<br />ALP: NON'
<br />g
<br />g
<br />P1511!sl
<br />AIM rM 'UMA' l",
<br />5IJ
<br />fi
<br />oh"P", ON
<br />V-
<br />n o"'A 01"PRIA "—L ail,
<br />'m g, 1 1- -1
<br />11811
<br />W —g-ag!
<br />S14
<br />MIN Iffi-11 C ;-
<br />R
<br />-rsl -,-p, I,-, , �'k
<br />gj�
<br />& 0
<br />RA
<br />5 M
<br />YAW
<br />y
<br />A R
<br />M
<br />A
<br />a
<br />R2
<br />al
<br />g",
<br />W
<br />Nil
<br />vq,
<br />-,g
<br />R h
<br />la,�
<br />'iM10
<br />YM t', M N1 M
<br />'A
<br />0
<br />r
<br />4K
<br />AV 5
<br />an.
<br />61111
<br />01 0.
<br />59, '411111 N?
<br />vie
<br />0, A ,
<br />g<
<br />A
<br />am q I'A
<br />gy,
<br />�6
<br />vang,
<br />10 1
<br />pi
<br />A
<br />14
<br />`40
<br />lF M, m!
<br />1--111-1-- , s 'n, " 1 51 �j
<br />P ;� -, - " 021 g tn `0
<br />-'Ag om
<br />gr'�, Fft 11040 wamft 04.11,10 F 0
<br />1,K'ag 0-
<br />IV R ilw
<br />x
<br />m
<br />i2`
<br />A
<br />"I MIN
<br />In
<br />kF
<br />"I 'A MIR
<br />ry q4 "I
<br />N
<br />'T"'ha
<br />SE6, W 'AL, 4 i,'El
<br />A
<br />0
<br />A
<br />R tal
<br />'11p
<br />6V
<br />-w
<br />N%it I.
<br />w",
<br />N
<br />-R�
<br />R
<br />N
<br />ol
<br />'y
<br />pL , ta
<br />D. (J)
<br />R"g-RU i`714AO,�� Rmm W r-TA&M �ffl R Lo'
<br />vj�
<br />A
<br />-aI
<br />'4
<br />o
<br />r
<br />ga, --l"
<br />4!A� J, -A - A 5
<br />p'q, gk�,, wq -p '17 �dtlm
<br />lA
<br />S
<br />%;-��k �s A0
<br />Y
<br />% , A
<br />u,
<br />R
<br />10
<br />q p- -A--- Ami�
<br />ji&A.IN & el- A
<br />0 #1 ft t , !mg," V
<br />I % -10� � 4
<br />011N, A-7
<br />Mq
<br />14
<br />Z7, Z.
<br />N
<br />d" 19"
<br />j
<br />A
<br />r
<br />DESCRIPTION OF WORK:
<br />CA
<br />UTILFFIEG, ELECTRICAI AND MECIHANI L'IRORK TO SUPPORFTHE INSTALLATION OF
<br />Two PAINT BOOTHS SPRAY ROOMS; IB(3 416.2)l- AND ARCHITECTURmr, MCE- JIANICAL
<br />AND ELECTRICAL WORK FOR EMPLOYEE ("'HANGING ROOMS WITHIN THE EXISTING
<br />40-058 CONIPOSITE VVING CrENTER BUILDING. NO OTHER CHANGE. TO BUILDING.
<br />SCOPE OF DRAWING PACKAGES:
<br />STRUCTUFIAL� SUPPORTIS FOR MECHANICAL EQUIPINIENTAND DUCT�AJOIRK
<br />MEGHANICAL� EQUIPMENT, DUCT, PIPE AND FIRE PRO -I ECTiON SYSTEMS
<br />3 "UPPOR"- N �j
<br />I AREAS: CHANGING ROOM31055A3 AND 106A3
<br />rj ECTRIGAI LIGHTING, POWER, FIREALARM, AND C OMMUNIC,"MON' SYSTEMS
<br />100 N T RVA C F 0 R
<br />SITE ADDRESS:
<br />D
<br />3003 WE ST CASINO ROAD
<br />EVERETT, WASHINGTON 98204
<br />0 WN E R
<br />BOEINkG' COMMERCIAL AIRPLANE., SEATTLE DISTRICT
<br />RO. BOX 3707, MIS: 1W-10
<br />SEATTLE, VJA. 98124-2207
<br />OWNER CONIACTi
<br />TAXOARCIEL NO:
<br />280411002001100
<br />-70NING
<br />L! (LIGHT !INDUSTRIAL)
<br />ARCHIENGUR. CONTACT:
<br />RON -,rHIRTYACRE, PROJECT MANAGER
<br />HARRIS GROUP ING,
<br />206 49�A-95)50
<br />FAA,
<br />51 V 9Mj 0M.
<br />% h
<br />Uc A y
<br />j 01 1 In
<br />ALL WORK SHALL CONFORM TO APPLICABLE BUILDING, CODES AND AUTHORITIES INCLUDING
<br />BUT NOT LIMITED TOTHEPOLI
<br />11Y r E
<br />OVVING AS ADOPTED) BY THECIT OF EVERETT, WA:
<br />a INTERNATIONAL BUILDING
<br />CODE
<br />UNIFORkI MECHANICAL CODE WAC 51-52
<br />A
<br />N 'ITIONAL ELECTRICAL
<br />CODENFPA 70 AS ADOPTED BY INAC 296-46D
<br />INFFERNATIONIAL FIRE' CODE
<br />ORIGINAL PERNIFF: 2018
<br />INTERNATIONAL BUILDING CODE (IBC) AS AMENDED
<br />THE Sil OF WASHINGTON
<br />OCCUPANCY:
<br />SPECIAL INDUSTRIAL, F-Iffiffl-3/8-11
<br />------- -- -
<br />C 0 N S T f ), U CTI 0 Ill 1 T Y P E:
<br />IIB
<br />ALLOWABLE AREA:
<br />N1101 CHANGE
<br />ALLOWABLE STORIES:
<br />NO CHANGE
<br />ALLOWAF3LE HEIGHT:
<br />NO CHANGE
<br />WASHINGTON [ENERGY
<br />NO CHANGE IN THLERNIAL E:NVELOPE-
<br />CODE COMPLIANCE
<br />DEFERRED SUBMITTALS:
<br />STRUCTURAL, MECHANICAL ANO ELEC FRICAL
<br />A
<br />ilk lk
<br />'M 0
<br />1 . WORK SHALL CONFORM -TO ALL APPLICABLE (30DES AND REGULATIONS,
<br />2. CONTRACTOR SHALL COMPLY VVITH THE CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND SECURITY
<br />REGULA-1 lONS.
<br />3. CONTRACTOR SHALL PROVIDE El'),UIPMENTSUPPORT I!,,ICLUDING SEISMIC RE' STRAMT.
<br />4. REPE H FIVE FEATURES NOT FULLY SHOINN OR NO -FED ON -THE DRAWINGS SHALL BE GOIij1F`LT-rELY PROVIDED AS IF ORAJAIN
<br />IN FUILL.
<br />S. -THE C3ENERAL CONTr-4)1,CFOR AND RESPECTIVE SUBCONTRACTORS SHALL. BE RESPONSIBLE FOR COORDINATION OF
<br />AIRCHITECTURAL, STRUCTURAL, INIECHANICAL & ELECTIRICAl- WORK. ARCHITECTURAL, STRUCTURAL, MIECHANICAL &
<br />EL.E-'CTF-,'ICAi- DRAWINGS SHALL BE REFERRED -10 IN DETAIL FOR COORDINATION OF SPECIFIC REQUiM.EMENTS,
<br />6. CONTRACTOR SHALL PROVIDE ALL WORK SHOWN AND /OR NOTED ON -THESE DRAWINGS. INCLUDING A[ L L BOR,
<br />I- LA
<br />MArERIAUS, AND SERVICES REQUIRED FORTHE SATISFACTORY COMPLETION OF �PVORK SHOkAIN ON THESE DRAWING.
<br />7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND ORDERING MATERIALS AND
<br />SHALL BE RESPONSIBLE FOP, THEJOINING OF THERE WORK 1-0 THE WORK OF Ol-HERTRADES. THE Air"CHITEECT OR
<br />ENGINEEF','SHALL BE NOTIFIED OF ANY DISCREPANCIEGOR INGON1`31STENCIES BEFORE COMMENCING ANY WORK.
<br />& ALL EXISTING CONDITIONS AND DESIGNATIONS SHOWN IN THESE CONSIRUCTION DOCUMENTS, THOUGH BECUEVED 1-0 BE
<br />ACCURATE, SHOULD BE CONSIDERED APPROXIMATE. IT I,") CONTRACTOR'S3 RFSPO!\ISIBILITY TO FIELD VERIFY FIELD
<br />CONDITIONS BE :FORE STARTING WORK. WFIERE EXISTING CONDITIONS F0010 DIFFER FROM THAT REPRESENTED ON
<br />CONTRACT DOCUI`�dlENTS, NOTIFY ARCHITECT IN A WRITT ENI REQU EST FOR, CLARIFICATION, DO NOT PERFORN! AFFEC T
<br />WORK UNTIL CLARIFICATioN IS OBTAINED.
<br />9, THE'ARCHITECT AND ENGINEER SHALL HAVE ACCESS TO THE WORK AT ALL TIMES FOR TrIE PURPOSE OF OBSERVING
<br />CONSTRUCTION.
<br />'10. CONTRACTOR SHALL INSTALL ALL TEN/lPORARY BRAC"INC3 AND S'HORING -10 IINSURE TH'E:SAF-ETY OF THE WORK UNTIL 11' IS
<br />IN ITS CON4PLETED FORM.
<br />11. THE CONTRACTOR SHALL REPAIR AND/OR RE -PAINT ALL AREAS DAMAGED BY DENIOLITION OR CONSTRUCTION ANDSHALL.
<br />FINISH TO MATCH ADJOINING SUIRZFACES.
<br />'12, A COMPLE FE SET OF PRINTS WILL BE PROVIDED AND SHALL. BE INIAIN FAINED IN GOOD ORDER AF THESITE, ALL
<br />DIFFERENCE0 BETVVEEN THE LOCA-1 IONS OR AR',RANGEMENTS INDIC"ATED ON THESIF DRPIWINGS ANDTHOSE OF THE
<br />ACTUAL INSTALLATION SHALL BE RECORDED IN RED PEN ONTII IE DRA0,1INGS f3E-1 � AT THE END OF THE PR',OJECT AND
<br />PRIOR TO FINAL. PAYNIENT,THE CONTRACTOR'SHALL SIGN A ND DATE EACH "FINAL. RECOP\0'D1RvkVV'1ING AS BEING A
<br />C(�RRECT AND ACCURATE RFC-PRESENTA-1-10N OF THE WORK, AND ' SHALL SUBIN11T THE COMPLFTF PACKAGE TO T' 11E
<br />O�AjNER,
<br />13� CONTI--,',AC'l OR SHALL MAINTAIN AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS, ANDSHALL STORE
<br />CONSTRUCTIOIN MATERIALS IN SUIT BLE AREAS ACIIEPTABLE TO OWNE R.
<br />I A r-
<br />14. CONTRAC-l"OR SHALL PREPARE (I.E. BUNDLE, STRAP, PALLETIZE) ALL NIATERIALS 'FOR S"ALVA.,GE AND REUSE AND SHALL
<br />MOVETO O'VVNER APPROVED LOCATION.
<br />f
<br />15� FRAME OPENINGS IN STUD WALLS: ALI OW NO NIORE'TIHAN ANNULAR GAP AND FILL Wl rH SUITAVA'-ESEALANT UN! 'S,,
<br />SPECIFICALLY PROHIBIT ED BY REGULATORY LISTING OF THE PEENETPATING SLA, OPENINGS: '-N,.)!JR' THAT GLAB
<br />OPENINGS REMAINII`1G AFTER INSTALLATION OF DUCTS, PIPING, AND CONDLIII S HAVE BEEN FILLIFID TO THE THICKNEE'ls OF
<br />THE SLAB PENETRATED WITH NIATERIAL NECESSARY -TO RETAIN THE FIRE RATING OFTHE FLOOR. TOP OF FIREVVALLS'i
<br />SHALL BE FIRE STOMPED BETWEEN THE TOP OF THE PARTITION AND ADJACENT STRUCTURE ABOVE. FIRE STOPS)HALL
<br />MAINTAIN THE RATING OF THE FIRE -RATED PARTITION.
<br />16, EXIb-FI1111G EQUIPIVIENTIN ARE' :-ASADJACE N T TO CONSTRUC-1 ION SHALL RZEIMIAIN IN PLACE DURING THE'V110IRK AND SHALL
<br />BE PROTECT E 0 BY THE CONTRACTO R. 000 RDI NA THE PROTECTI ON, MATERIALS AN FJ SC H E M I--, WIT H OWN E R�s
<br />RE
<br />EPRESENTA FIVE FOR APPROVAL.
<br />17, COORDINATE COW STRUCTION ACTIVI-I lES WITH OWNER INCLUDING, BUT NOT LIMITED 1-0, MATERIAL STORAGE, Rl--�CYC'LE
<br />ANOTRASH BINS, DELIVERY ACCESS, NOISE, WORK AREAS AND HOURS, DISPO' SITION OF REMOVED NIATERIALS, AND
<br />TEMPORARY F-ACILITIES,
<br />J
<br />EVERETT FIRE DEPT. REVIEW
<br />,5M,APPROVED
<br />13 APPROVED WITH CHANGES NOTEC)
<br />0 REVISE AND RESUBMIT
<br />0 SEE ATTACHED C-NgCX&jST/"AND0UT
<br />The issuance of a P&MItaball not
<br />be construed as authority to violate,
<br />cancel Or 86t aside any provision of
<br />the Everett Fire Code or other
<br />applicable regulations or jav4s, The
<br />issuance off S PWMit based on
<br />construction documents and other
<br />data shall nOt Prevent the Fire Code
<br />Offic8l frOM re(Viring the COrTOCtion
<br />of errors.
<br />Permit #: B2206-034
<br />Site Address: 3003 W CASINO RD
<br />Owner: BOEING COMPANY
<br />Tenant: [TenNamel
<br />App- Date: 6/W2022
<br />Proposed Use: COMMERCIAL ALTERATIONS
<br />Description: INSTALLCHANGING ROOMS/ (2) SPAR
<br />PAINT BOOTHS
<br />J
<br />Reviewed 13-1�-�,;:�--�41�-Iq Date:R ZA
<br />7 -/-
<br />'1� ffice Set Job Site Set Fire/Planning Set
<br />18. CONTRACT ORSHAL� VERIFY [EXACT SIZE, CONNECTION SIZE, LOCATION AND QUANTITY Or' OWNER FURNISFIED
<br />EQUIPMENT, FIXTURES AND FURNISHINGIS' PRIOR TO INSTALLA-1 I ON, ("ONTRACTORS HALL BE RESPONSIBLEFOR ALL
<br />BACKINIGS, ROUGH -INS AND CONNECT!OiNIS UNLESS OTH'ERWK.')'E NOTED.
<br />I 9� PARTITIONS, WALI-3 AND FURNISHINGS NOT OTHERVAliSE DIINYIENSIONED ISHALL. BOE LOCATED FLUSH 10,11TH ADJACENT
<br />ASSEMBLIES,
<br />20, STAIRSOR LADDERS USED 'FO A TTEND EQUIPMENT OR ROOF SHALL COMPLYVViT H WSHA REGULATIONS AN'D T HE
<br />lNTERNIATIONAL BUILDING CODE,
<br />21. �'NIIC" MEANS "NOT WITHIN THE WORK SCOPE OF -THE PROJECT. `UON" IMEANG �'PROVIDE AS TYPICAL, UNLESS OTHEffilVISE
<br />iN OT E D'
<br />29. UNLESS o rHERINISENOTED ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF STUDS OR CENTEFI)I INE OF
<br />CO L U IM N S.
<br />23. CONTRACTOR SHALL REVIEW DESIGNS, INCLUDING SPECIFIC PRODUCT DATA FOR MECHANICAL, ELECTRICAL,
<br />STRUCTURAL, PIPING, FIRE PROTECTION SYSTEMS ANDS)HAL.L. PROVIDE CONCEALED ELEMENT S 1NICLUDING, BUT NO-r
<br />LIMITED TO, BLOCKING, ANtCHIORAGE, OPENINGS, SLEEVES.
<br />24. VERIFY THAT WITHIN AREA OF PROJECT WORK, EXISTING EQUIPMENTTHAT REQUIRES ACCESS SHALL CON f INUE TO BE
<br />ACCESSIBLE AFTER PROJECT CONIPLETION, FIELD VERIFY AND INFORM ARCHI FECT OF'ANY APPARENT EOUIIPMENT
<br />ACCESS CONCERNS, NO DAMPERS OR OTHE-R COMPONENTSREQUIRII\IG ACCESS SHALL. BE INSTALLED ABOVE FIAPD
<br />CEILHNIG UNLESS AN EQUIPMENT ACCESS DOOR IS PR'OVID'E'D. COORDINIATE. EKACT 1 OCATION OF PIPING AND CONDUIT TO
<br />NIAINTAIN NECE&SARY CLEARANCE ABOVE LIGHT FIXTURES ANDTO AI ACCESS FOR MAINTENANCE OF EQUIPMENT
<br />RIMSION BY APPROVI D Or�FF sym REVISION 2"', A;PPR0VF0 D-1- TABLITY R NNI.AC I SUB -Fill)
<br />ACCEP 1 0, 1,�
<br />628 7 ------ Q22 t` i I ?- r"T
<br />REGISTERED T H QS D E S! G f, J AND fU R CHRIKET) I
<br />0 V F`
<br />R 1" 06,0122
<br />NIE AA(' -2
<br />PFPSPAR PAINT BOOTH I AND 2 PHASF9 SPECIFICATIOr R, PHL't 3,
<br />J
<br />FNGNIIE-10 Ti-fi
<br />Appf DFPT Ait V
<br />0&03,22
<br />F
<br />['11-P SPA t� -) INT 1300flrl I AND2
<br />G r f P1
<br />X
<br />C1 KPF
<br />- �!ZgtW4"
<br />I U. �Y
<br />4 'Ir H E-C.
<br />L E 0, �`rl Q, S GR 0 V E L. COSGROVE 06.03.22
<br />Jr
<br />IRR THIRT
<br />6/03/2022
<br />0 117,
<br />T S TA )IN Gj -4
<br />--J,�i�`POVFD
<br />I IGMERAL MASTFR
<br />MUM FOR
<br />CON ��,S)TRUCTION
<br />'C'ITY OF EVERCETT
<br />REVIEWED FOR PERMIT
<br />CURRENTREVISION SYMBOL
<br /> -
<br />!7NEEF
<br />A
<br />YDB No.
<br />FR'-TT,V`AJA
<br />n
<br />40-058-G0
<br />PROJEa i,.,o. 0012630.06
<br />DATE OU322
<br />Comp N10,
<br />
|