My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1) The data shown is representative of laboratory test 28 day cured samples at 50% <br /> 2 humidity. 1 <br /> 3 2) Test sample must be prepared by overlaying 1/4" (6mm) of product on 12.5mm HMA <br /> 4 sample. , <br /> 5 3) A SRI of greater than 29 can be obtained by using pigments or changing the color <br /> 6 index of the aggregate. It is not applicable where color pigments are requested. <br /> 7 4) Only applicable for projects where a LEED certification credit is a requirement of the <br /> 8 surfacing or where a reflective surfacing is specified. <br /> 9 5) Required to provide balance between flexibility, minimal permeability and therefore I <br /> 10 maximum durability. <br /> 11 6) Use the same loading rate as for the ASTM C-109 test above. <br /> 12 7) Quality assurance tests for site I <br /> 13 <br /> 14 8-26.2(2) Chemical Admixtures/Pigments <br /> 15 <br /> 16 Any chemical admixtures and/or color pigments used, the dosage rates and the conditions <br /> 17 for use in the PCSS shall be approved by the manufacturer. <br /> 1811 <br /> 19 <br /> 20 <br /> 21 <br /> I <br /> 22 8-26.2(3) Delivery, Storage and Handling <br /> 23 The material shall be delivered to site in weatherproof containers and stored in a covered <br /> 24 and ventilated location. <br /> 25 <br /> 26 8-26.2(4) Equipment <br /> 27 The equipment to be used shall be approved by the manufacturer or an approved installer. I <br /> 28 The installer shall demonstrate that the equipment shall be capable of handling materials, <br /> 29 performing the work, maintaining proper material temperature, maintaining the minimum <br /> 30 level of required productivity, and producing a product of the specified quality and be 1 <br /> 31 maintained in good mechanical condition. The contractor shall also provide sufficient <br /> 32 equipment to enable the prosecution of the work in accordance with the project schedule <br /> 33 and completion of the work in the specified time. <br /> 34 <br /> 35 8-26.2(5) Material Handling Equipment <br /> 36 The equipment shall be capable of handling and transferring the dry materials and <br /> 37 liquids to the approved mixer without causing spillage, segregation, or contamination. I <br /> 38 <br /> 39 8-26.3 Construction Requirements <br /> 40 <br /> 41 8-26.3(1) Weather limitations <br /> 42 <br /> 43 A. Required Conditions I <br /> 44 <br /> 45 PCSS shall only be placed when all of the following conditions are met: <br /> 46 • The pavement surface is dry. <br /> 47 • Ambient and substrate temperatures are 50° F (10° C) and rising and <br /> I <br /> FLEMING BICYCLE CORRIDOR 78 <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.