Laserfiche WebLink
I <br /> 1 cases, the approved paper construction plans are the official contract documents. If the <br /> 2 Contractor wishes to use the electronic version of the construction plans for the purposes of <br /> 3 providing construction surveying of proposed improvements, it shall be the Contractor's <br /> 4 responsibility to verify that any coordinates used from the electronic file exactly match the <br /> 5 station and offset location given in the contract construction plans. Construction plans are <br /> 6 diagrammatic in nature. The coordinate locations of the various graphic elements within the <br /> 7 electronic files may not necessarily be precisely shown with respect to their coordinate <br /> ' 8 position. In all cases, the location callouts in the contract construction plans shall govern. <br /> 9 <br /> 10 <br /> 11 END DIVISION8.RTF <br /> I12 <br /> 13 END DIVISION 8 <br /> 14 <br /> i <br /> r <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> 1 <br /> I <br /> FLEMING BICYCLE CORRIDOR 83 <br /> PW 3767 November 15, 2022 <br />