Laserfiche WebLink
I <br /> Local Agency Name Cl�01 (;r�(We <br /> Local Agency Address <br /> '23200 CedaV St1te,4 Local Agency Subcontractor List <br /> I <br /> vev H W t22Qf Prepared in compliance with RCW 39.30.060 as amended <br /> To Be Submitted with the Bid Proposal <br /> Project Name Fleming Bicycle Corridor <br /> 111 Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> work of structural steel installation,rebar installation,heating,ventilation and air conditioning, plumbing,as described in <br /> Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> Ithe same work will result in your bid being non-responsive and therefore void. <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar installation, heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> Idescribed in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. <br /> To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> Ilisted below to perform such work,the bidder certifies that the work will either(i)be performed by the bidder itself,or(ii)be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder. <br /> Subcontractor Name P(qnz. C04` YacTd1' IUtc4,s tC+hVt �Y\l CQS to <br /> Work to be performed Pcvi-o YY) vi n i Sfi-ee I pcS-t wi tclI�ck-ti L✓1 <br /> I <br /> Subcontractor Name <br /> IWork to be performed <br /> I <br /> Subcontractor Name <br /> Work to be performed <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> I * Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes, etc,are considered <br /> electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical <br /> current is connected during the project. <br /> I DOT Form 271-015A Page 9 of 30 <br /> Revised 06/2020 <br /> ,r,, ;,ao.a tr, 11,1;1r9orc Rvr},mnrr. of wn_ Tnr Pnr naaae rnnr1ii-ions Aareemenr see www.bxwa.com - Always Verify Scale <br />