My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Local Agency Name Cl�01 (;r�(We <br /> Local Agency Address <br /> '23200 CedaV St1te,4 Local Agency Subcontractor List <br /> I <br /> vev H W t22Qf Prepared in compliance with RCW 39.30.060 as amended <br /> To Be Submitted with the Bid Proposal <br /> Project Name Fleming Bicycle Corridor <br /> 111 Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> work of structural steel installation,rebar installation,heating,ventilation and air conditioning, plumbing,as described in <br /> Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> Ithe same work will result in your bid being non-responsive and therefore void. <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar installation, heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> Idescribed in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. <br /> To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> Ilisted below to perform such work,the bidder certifies that the work will either(i)be performed by the bidder itself,or(ii)be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder. <br /> Subcontractor Name P(qnz. C04` YacTd1' IUtc4,s tC+hVt �Y\l CQS to <br /> Work to be performed Pcvi-o YY) vi n i Sfi-ee I pcS-t wi tclI�ck-ti L✓1 <br /> I <br /> Subcontractor Name <br /> IWork to be performed <br /> I <br /> Subcontractor Name <br /> Work to be performed <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> I * Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes, etc,are considered <br /> electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical <br /> current is connected during the project. <br /> I DOT Form 271-015A Page 9 of 30 <br /> Revised 06/2020 <br /> ,r,, ;,ao.a tr, 11,1;1r9orc Rvr},mnrr. of wn_ Tnr Pnr naaae rnnr1ii-ions Aareemenr see www.bxwa.com - Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.