My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> * If a corporation, proposal must be executed in the corporate name by the president or vice-president <br /> (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, <br /> proposal must be executed by a partner. <br /> s APWA-WA Division 1 Committee rev. 1/8/2016 <br /> Proposal for Incorporating Recycled Materials into the Project <br /> ' In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> propose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: 0 percent. <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker,per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> ' 1-06.6 of the Special Provisions. I� ( <br /> Bidder: !�i 11�tit�Ckki)� RC 1� c(laS IR <br /> ' Signature of Authorized Official: <br /> Date: +3121_ <br /> I <br /> I <br /> CITY OF EVERETT PROPOSAL <br /> ' FLEMING BICYCLE CORRIDOR 08/18/2022 <br /> FEDERAL AID#CM-0420(027);COE#PW3767 <br /> ' Page 29 of 30 <br /> ,.-,...;a,-.,a T,Ta T,,.. 7.,,- „.- r.o rnnriitir,nc Arrroomonr cac t.n..w hv'.ra rnm - Alwavc Varifv Sra1P <br />
The URL can be used to link to this page
Your browser does not support the video tag.