My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Or 0 — all — r r r r — 11 all 1 - - 0 — 0 <br /> 1 <br /> NOTES <br /> 1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br /> MEET THE REQUIREMENTS OF WSDOT STANDARD <br /> SPECIFICATION SECTION 8-01.3(7). <br /> INSTALL DRIVEWAY CULVERT <br /> IF THERE IS A ROADSIDE DITCH <br /> PRESENT <br /> 25' Ilik° <br /> >_."'--- G ROAD <br /> EXISTIN.. Nfii.,', , �30'MIN TYPICAL <br /> e <br /> `zez_ �lippop------ <br /> PERMEABLE BALLAST TYPICAL SEE <br /> STANDARD SPECIFICATION <br /> ^''� SECTION 9-03.9(2) <br /> 1' MIN �; �i•:4:. <br /> LENGTH AS REQUIRED 100 MIN,EXCEPT DEPTH •. `*. - <br /> MAY BE REDUCED TO 50'MIN FOR <br /> %!%'-- ! <br /> SITES WITH LESS THAN ONE ACRE TYPICAL =i.�4ri3O:4_ gy;1_' <br /> OF EXPOSED SOIL OR APPROVED BY INSPECTOR _-- '� 4''�"1'•'P'Cte <br /> 3 <br /> PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br /> g STABILIZATION FROM THE EDGE OF THE EXISTING PROVIDE FULL WIDTH OF <br /> ROADWAY TO THE CONSTRUCTION ENTRANCE, <br /> 3 OR AS DIRECTED BY THE ENGINEER INGRESS/EGRESS AREA <br /> 1 15'MIN <br /> f <br /> 0 <br /> N <br /> 12 ISOMETRIC VIEW <br /> V. CONSTRUCTION ENTRANCE WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br /> 1a EVERETT PUBLIC WORKS <br /> 'a <br /> WASHINGTON DEPARTMENT <br /> Li n uRY' AN SASS IHEATHFR GRIFFINI uPAULWRHELM I' SH 04/03/2017 <br /> UMIIAMMAVANG <br /> igSo CONSTRUCTION ACCESS 201. <br /> 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.