My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, <br /> I <br /> 2 must request the explanation or interpretation in writing soon enough to allow a written <br /> 3 reply to reach all prospective Bidders before the submission of their Bids. <br /> 4 <br /> I 5 COE 1-02.5.RTF <br /> 6 1-02.5 Proposal Forms <br /> 7 (July 31, 2017 APWA GSP & City of Everett) <br /> I 8 <br /> 9 Delete this section and replace it with the following: <br /> 10 <br /> 11 The Proposal Form will identify the project and its location and describe the work. It will <br /> 12 also list estimated quantities, units of measurement, the items of work, and the materials <br /> 13 to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal <br /> 14 form that call for, but are not limited to, unit prices; extensions; summations; the total bid <br /> ' 15 amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment <br /> 16 of addenda; the bidder's name, address, telephone number, and signature; the bidder's <br /> 17 UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor's <br /> I 18 Registration Number; and a Business License Number, if applicable. Bids shall be <br /> 19 completed by typing or shall be printed in ink by hand, preferably in black ink. The <br /> 20 required certifications are included as part of the Proposal Form. <br /> I 21 <br /> 22 The Contracting Agency reserves the right to arrange the proposal forms with alternates <br /> 23 and additives, if such be to the advantage of the Contracting Agency. The bidder shall <br /> I <br /> 24 bid on all alternates and additives set forth in the Proposal Form unless otherwise <br /> 25 specified. <br /> 26 <br /> 27 <br /> 28 1-02.6.GR1 <br /> 29 Preparation of Proposal <br /> 30 <br /> I 31 1-02.6.OptionA.RTF <br /> 32 1-02.6 Preparation of Proposal <br /> 33 (December 10, 2020 APWA GSP, Option A) <br /> I 34 <br /> 35 Supplement this section with the following: <br /> 36 <br /> I <br /> 37 38 The Bidder shall submit with the Bid a completed Disadvantaged Business Enterprise <br /> (DBE) Utilization Certification, when required by the Special Provisions. For each and <br /> 39 every DBE firm listed on the Bidder's completed Disadvantaged Business Enterprise <br /> 40 Utilization Certification, the Bidder shall submit written confirmation from that DBE firm <br /> I41 that the DBE is in agreement with the DBE participation commitment that the Bidder has <br /> 42 made in the Bidder's completed Disadvantaged Business Enterprise Utilization <br /> 43 Certification. <br /> I <br /> 44 <br /> 45 WSDOT Form 422 031 (Disadvantaged Business Enterprise Written Confirmation <br /> 46 Document) is to be used for this purpose. Bidder must submit good faith effort <br /> I <br /> 47 48 documentation only in the event the bidder's efforts to solicit sufficient DBE participation <br /> have been unsuccessful. <br /> 49 <br /> I 50 The Bidder shall submit a DBE Bid Item Breakdown form defining the scope of work to <br /> 51 be performed by each DBE listed on the DBE Utilization Certification. <br /> I <br /> FLEMING BICYCLE CORRIDOR 5 <br /> 1 PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.