Laserfiche WebLink
r <br /> 1 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate <br /> 2 resolution, power of attorney, or a letter to such effect signed by the president or vice <br /> 3 president). <br /> 4 <br /> 5 1-03.7.RTF r <br /> 6 1-03.7 Judicial Review <br /> 7 (November 30, 2018 APWA GSP) <br /> 8 <br /> 9 Revise this section to read: <br /> 10 <br /> 11 Any decision made by the Contracting Agency regarding the Award and execution of the 111 <br /> 12 Contract or Bid rejection shall be conclusive subject to the scope of judicial review <br /> 13 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br /> 14 Court of the county where the Contracting Agency headquarters is located, provided that <br /> 15 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br /> 16 jurisdiction. <br /> 18 <br /> 18 1-04.2.RTF <br /> 19 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 20 Specifications, and Addenda <br /> 21 (December 10, 2020 APWA GSP) <br /> 22 <br /> 23 Revise the second paragraph to read: <br /> 24 <br /> 25 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 26 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 27 1. Addenda, r <br /> 28 2. Proposal Form, <br /> 29 3. Special Provisions, <br /> 30 4. Contract Plans, I <br /> 31 5. Standard Specifications, <br /> 32 6. Contracting Agency's Standard Plans or Details (if any), and <br /> 33 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 34 <br /> 35 1-05.GR1 <br /> 36 Control of Work <br /> 37 <br /> 38 1-05.7.RTF <br /> 39 1-05.7 Removal of Defective and Unauthorized Work <br /> 40 (October 1, 2005 APWA GSP) <br /> 41 <br /> 42 Supplement this section with the following: <br /> 43 <br /> 44 If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> 45 in a written notice from the Engineer, or fails to perform any part of the work required by <br /> 46 the Contract Documents, the Engineer may correct and remedy such work as may be <br /> 47 identified in the written notice, with Contracting Agency forces or by such other means as <br /> 48 the Contracting Agency may deem necessary. <br /> 49 <br /> r <br /> FLEMING BICYCLE CORRIDOR 14 <br /> PW 3767 November 15, 2022 <br />