My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate <br /> 2 resolution, power of attorney, or a letter to such effect signed by the president or vice <br /> 3 president). <br /> 4 <br /> 5 1-03.7.RTF r <br /> 6 1-03.7 Judicial Review <br /> 7 (November 30, 2018 APWA GSP) <br /> 8 <br /> 9 Revise this section to read: <br /> 10 <br /> 11 Any decision made by the Contracting Agency regarding the Award and execution of the 111 <br /> 12 Contract or Bid rejection shall be conclusive subject to the scope of judicial review <br /> 13 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br /> 14 Court of the county where the Contracting Agency headquarters is located, provided that <br /> 15 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br /> 16 jurisdiction. <br /> 18 <br /> 18 1-04.2.RTF <br /> 19 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 20 Specifications, and Addenda <br /> 21 (December 10, 2020 APWA GSP) <br /> 22 <br /> 23 Revise the second paragraph to read: <br /> 24 <br /> 25 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 26 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 27 1. Addenda, r <br /> 28 2. Proposal Form, <br /> 29 3. Special Provisions, <br /> 30 4. Contract Plans, I <br /> 31 5. Standard Specifications, <br /> 32 6. Contracting Agency's Standard Plans or Details (if any), and <br /> 33 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 34 <br /> 35 1-05.GR1 <br /> 36 Control of Work <br /> 37 <br /> 38 1-05.7.RTF <br /> 39 1-05.7 Removal of Defective and Unauthorized Work <br /> 40 (October 1, 2005 APWA GSP) <br /> 41 <br /> 42 Supplement this section with the following: <br /> 43 <br /> 44 If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> 45 in a written notice from the Engineer, or fails to perform any part of the work required by <br /> 46 the Contract Documents, the Engineer may correct and remedy such work as may be <br /> 47 identified in the written notice, with Contracting Agency forces or by such other means as <br /> 48 the Contracting Agency may deem necessary. <br /> 49 <br /> r <br /> FLEMING BICYCLE CORRIDOR 14 <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.