My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> 2 they were installed. The Physical Completion Date cannot be established until testing <br /> 3 and corrections have been completed to the satisfaction of the Engineer. <br /> 4 <br /> ' 5 6 The costs for power, gas, labor, material, supplies, and everything else needed to <br /> successfully complete operational testing, shall be included in the unit contract prices <br /> 7 related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> r8 <br /> 9 Operational and test periods, when required by the Engineer, shall not affect a <br /> 10 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 11 <br /> I 12 <br /> 13 1-05.13.RTF <br /> 14 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 15 (August 14, 2013 APWA GSP) <br /> 16 <br /> 17 Delete the sixth and seventh paragraphs of this section. <br /> 18 <br /> 19 1-05.14.GR1 <br /> 20 Cooperation With Other Contractors <br /> 21 <br /> 22 1-05.14.INST1.GR1 <br /> 23 Section 1-05.14 is supplemented with the following: <br /> ' 24 <br /> 25 1-05.14.OPT1.FR1 <br /> 26 (March 13, 1995) <br /> 27 Other Contracts Or Other Work <br /> 28 It is anticipated that the following work adjacent to or within the limits of this project will <br /> 29 be performed by others during the course of this project and will require coordination of <br /> 30 the work: <br /> I 31 <br /> 32 *** 2023 Pavement Overlay *** <br /> 33 <br /> 34 1-05.15.RTF <br /> 35 1-05.15 Method of Serving Notices <br /> 36 (March 25, 2009 APWA GSP) <br /> 37 Revise the second paragraph to read: <br /> 38 <br /> 39 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 40 correspondence from the Contractor constituting any notification, notice of protest, notice <br /> 41 of dispute, or other correspondence constituting notification required to be furnished <br /> 42 under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> 43 service to the Project Engineer's office. Electronic copies such as e-mails or <br /> 44 electronically delivered copies of correspondence will not constitute such notice and will <br /> 45 not comply with the requirements of the Contract. <br /> 46 <br /> I <br /> I <br /> FLEMING BICYCLE CORRIDOR 17 <br /> 111 PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.