Laserfiche WebLink
I <br /> 1 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> 2 they were installed. The Physical Completion Date cannot be established until testing <br /> 3 and corrections have been completed to the satisfaction of the Engineer. <br /> 4 <br /> ' 5 6 The costs for power, gas, labor, material, supplies, and everything else needed to <br /> successfully complete operational testing, shall be included in the unit contract prices <br /> 7 related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> r8 <br /> 9 Operational and test periods, when required by the Engineer, shall not affect a <br /> 10 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 11 <br /> I 12 <br /> 13 1-05.13.RTF <br /> 14 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 15 (August 14, 2013 APWA GSP) <br /> 16 <br /> 17 Delete the sixth and seventh paragraphs of this section. <br /> 18 <br /> 19 1-05.14.GR1 <br /> 20 Cooperation With Other Contractors <br /> 21 <br /> 22 1-05.14.INST1.GR1 <br /> 23 Section 1-05.14 is supplemented with the following: <br /> ' 24 <br /> 25 1-05.14.OPT1.FR1 <br /> 26 (March 13, 1995) <br /> 27 Other Contracts Or Other Work <br /> 28 It is anticipated that the following work adjacent to or within the limits of this project will <br /> 29 be performed by others during the course of this project and will require coordination of <br /> 30 the work: <br /> I 31 <br /> 32 *** 2023 Pavement Overlay *** <br /> 33 <br /> 34 1-05.15.RTF <br /> 35 1-05.15 Method of Serving Notices <br /> 36 (March 25, 2009 APWA GSP) <br /> 37 Revise the second paragraph to read: <br /> 38 <br /> 39 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 40 correspondence from the Contractor constituting any notification, notice of protest, notice <br /> 41 of dispute, or other correspondence constituting notification required to be furnished <br /> 42 under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> 43 service to the Project Engineer's office. Electronic copies such as e-mails or <br /> 44 electronically delivered copies of correspondence will not constitute such notice and will <br /> 45 not comply with the requirements of the Contract. <br /> 46 <br /> I <br /> I <br /> FLEMING BICYCLE CORRIDOR 17 <br /> 111 PW 3767 November 15, 2022 <br />