My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i <br /> EVERETT <br /> WASHINGTON <br /> ADDENDUM NO. 1 <br /> TO THE PLANS,SPECIFICATIONS, PROPOSAL,AND CONTRACT <br /> FOR THE <br /> CITY OF EVERETT <br /> ' FLEMING BICYCLE CORRIDOR <br /> FEDERAL AID#CM-0420(027); COE#PW3767 <br /> ISSUED THIS DATE: Friday, October 28, 2022 <br /> BID OPENING: 2:00 pm (PST) on <br /> Tuesday, November 15, 2022 <br /> Via webcast at https://everettwa.gov/319/Procurement <br /> Addendum No.2 shall be incorporated into the Contract Documents. <br /> Acknowledge receipt of this Addendum on the Proposal Signature Sheet (page PR-8). <br /> TO THE PROSPECTIVE BIDDERS: <br /> The attention of the prospective bidders on the above project is directed to the following additions and <br /> modifications to the contract documents. <br /> ADDITIONS, MODIFICATIONS,AND/OR DELETIONS TO THE CONTRACT DOCUMENTS AND <br /> SPECIFICATIONS <br /> ITEM NO. 1—SPECIAL PROVISIONS. <br /> Special Provision 1-06.GR1, Control of Material, 1-06.OPT1.GR1, Buy America,from line 1 on <br /> page 20 to line 22 on page 21, is deleted and replaced with the attached Special Provision 1- <br /> 06.GR1, Control of Material, 1-06.OPT2.GR1, Build America/Buy America. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerely, <br /> 1 Christina Anna Curtis, P.E. <br /> Project Engineer <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.