My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 a. Covered Area means the geographical area described in the solicitation 1 <br /> 3 from which this contract resulted; <br /> 4 <br /> 5 b. Director means Director, Office of Federal Contract Compliance Programs, I <br /> 6 United States Department of Labor, or any person to whom the Director <br /> 7 delegates authority; <br /> 8 I 9 c. Employer Identification Number means the Federal Social Security number <br /> 10 used on the Employer's Quarterly Federal Tax Return, U. S. Treasury <br /> 11 Department Form 941; <br /> 12 1 13 d. Minority includes: <br /> 14 <br /> 15 (1) Black, a person having origins in any of the Black Racial Groups I <br /> 16 of Africa. <br /> 17 <br /> 18 (2) Hispanic, a fluent Spanish speaking, Spanish surnamed person of I <br /> 19 Mexican, Puerto Rican, Cuban, Central American, South <br /> 20 American, or other Spanish origin. <br /> 21 '22 (3) Asian or Pacific Islander, a person having origins in any of the <br /> 23 original peoples of the Pacific rim or the Pacific Islands, the <br /> 24 Hawaiian Islands and Samoa. <br /> 25 <br /> 26 (4) American Indian or Alaskan Native, a person having origins in any <br /> 27 of the original peoples of North America, and who maintain cultural <br /> 28 identification through tribal affiliation or community recognition. <br /> 29 <br /> 30 2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of <br /> 31 the work involving any construction trade, it shall physically include in each I <br /> 32 subcontract in excess of $10,000 the provisions of these specifications and the <br /> 33 Notice which contains the applicable goals for minority and female participation and <br /> 34 which is set forth in the solicitations from which this contract resulted. <br /> 35 <br /> 36 3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan <br /> 37 approved by the U.S. Department of Labor in the covered area either individually or 1 <br /> 38 through an association, its affirmative action obligations on all work in the Plan area <br /> 39 (including goals and timetables)shall be in accordance with that Plan for those trades <br /> 40 which have unions participating in the Plan. Contractors must be able to demonstrate <br /> 41 their participation in and compliance with the provisions of any such Hometown Plan. <br /> 42 Each Contractor or Subcontractor participating in an approved Plan is individually <br /> 43 required to comply with its obligations under the EEO clause, and to make a good <br /> 44 faith effort to achieve each goal under the Plan in each trade in which it has I <br /> 45 employees. The overall good faith performance by other Contractors or <br /> 46 Subcontractors toward a goal in an approved Plan does not excuse any covered <br /> 47 Contractor's or Subcontractor's failure to take good faith effort to achieve the Plan <br /> 48 goals and timetables. <br /> 49 <br /> 50 4. The Contractor shall implement the specific affirmative action standards provided in <br /> 51 paragraphs 7a. through 7p of this Special Provision. The goals set forth in the <br /> I <br /> FLEMING BICYCLE CORRIDOR 30 <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.