My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I 2 Original Quantity Underruns <br /> 3 In the event that Work committed to a DBE firm as part of the COA underruns <br /> 4 the original planned quantities the Contractor may be required to substitute other <br /> I <br /> 5 remaining Work to another DBE. <br /> 6 <br /> 7 Contractor Proposed DBE Substitutions <br /> 8 Requests to substitute a COA DBE must be for good cause (see DBE <br /> 9 termination process below), and requires prior written approval of the Engineer. <br /> 10 After receiving a termination with good cause approval, the Contractor may only <br /> III replace a DBE with another certified DBE. When any changes between <br /> 12 Contract Award and Execution result in a substitution of COA DBE,the substitute <br /> 13 DBE shall have been certified prior to the bid opening on the Contract. <br /> 14 <br /> I <br /> 15 DBE Termination <br /> 16 Termination of a COA DBE (or an approved substitute DBE) is only allowed in <br /> 17 whole or in part for good cause and with prior written approval of the Engineer. <br /> I <br /> 18 19 If the Contractor terminates a COA DBE without the prior written approval of the <br /> Engineer, the Contractor shall not be entitled to payment for work or material <br /> 20 committed to, but not performed/supplied by the COA DBE. In addition, <br /> I <br /> 21 22 sanctions may apply as described elsewhere in this specification. <br /> 23 Prior to requesting approval to terminate a COA DBE, the Contractor shall give <br /> 24 notice in writing to the DBE with a copy to the Engineer of its intent to request to <br /> I 25 terminate DBE Work and the reasons for doing so. The DBE shall have five (5) <br /> 26 days to respond to the Contractor's notice. The DBE's response shall either <br /> 27 support the termination or advise the Engineer and the Contractor of the reasons <br /> I 28 it objects to the termination of its subcontract. <br /> 29 <br /> 30 If the request for termination is approved,the Contractor is required to substitute <br /> I 31 with another DBE to perform at least the same amount of work as the DBE that <br /> 32 was terminated (or provide documentation of GFE). A plan to replace the COA <br /> 33 DBE Commitment amount shall be submitted to the Engineer within 2 days of <br /> 34 the approval of termination. The plan to replace the Commitment shall provide <br /> 35 the same detail as that required in the DBE Utilization Certification. <br /> 36 <br /> 1 <br /> 37 38 The Contractor must have good cause to terminate a COA DBE. <br /> 39 Good cause typically includes situations where the DBE Subcontractor is unable <br /> 40 or unwilling to perform the work of its subcontract. Good cause may exist if: <br /> I41 <br /> 42 • The DBE fails or refuses to execute a written contract. <br /> 43 <br /> I <br /> 44 • The DBE fails or refuses to perform the Work of its subcontract in a <br /> 45 way consistent with normal industry standards. <br /> 46 <br /> I 47 • The DBE fails or refuses to meet the Contractor's reasonable <br /> 48 nondiscriminatory bond requirements. <br /> 49 <br /> I 50 • The DBE becomes bankrupt, insolvent, or exhibits credit unworthiness. <br /> 51 <br /> I <br /> FLEMING BICYCLE CORRIDOR 47 <br /> PW 3767 November 15,2022 <br />