Laserfiche WebLink
The city has their own plans for deve ment of the Jackson Park area and it doe 40 <br /> f jive with the work that was <br /> designed for the park <br /> This results in a deletion of work for the tribal contractor <br /> #65 Remove and Replace Existing Irrigation System $19,000. (LS) <br /> #66 Remove and Restore Existing Seg2 Landscape $69,500. (LS) <br /> Solution: <br /> (1) Delete the work—Reece would be out of compliance with their contract,the contract and their sub would <br /> be entitled to ask for money to perform nothing <br /> (2) Coordinate with Geoeff Larson and Tom Gallagher with the City of Everett and see if we can take their <br /> design and use our funds to meet their expectations(irrigation for the park) <br /> 2 1� <br />