My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
300 E MARINE VIEW DR 2023-01-30
>
Address Records
>
E MARINE VIEW DR
>
300
>
300 E MARINE VIEW DR 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 9:48:59 AM
Creation date
1/30/2023 9:46:14 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
300
Notes
INSTALL TULALIP WATER PIPELINE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t • , • S <br /> Kirk Brooks <br /> From: Jim Miller <br /> Sent: Friday, March 04, 2016 10:19 AM <br /> To: 'Debbie Bray' <br /> Cc: Tom McKinsey;Tom Gallagher; Mike 011ivant (M011ivant@parametrix.com); Souheil Nasr; <br /> Geoff Larsen; Kirk Brooks <br /> Subject: TWP-Seg. 2 160301 SNN -Jackson Park <br /> Importance: High <br /> Deb: <br /> Our Parks Dept. doesn't have an engineer's estimate, but in their opinion they believe that the restoration <br /> according to the plan that I sent you earlier would be equivalent in cost to the cost of what your contractor would have <br /> had to spend on an "in-kind" restoration of the existing landscaping and irrigation system. <br /> Til later, <br /> Jim <br /> Original Message <br /> From: Debbie Bray [mailto:dbray@tulaliptribes-nsn.gov] <br /> Sent:Tuesday, March 01, 2016 8:21 AM <br /> To:Souheil Nasr; Mike 011ivant(M011ivant@parametrix.com) <br /> Cc:Tom McKinsey;Tom Gallagher;Jim Miller <br /> Subject: Re:TWP-Seg. 2 160301 SNN -Jackson Park <br /> Was an engineers estimate prepared. Our goal was to look at a similar or equivalent option since we will not be doing <br /> you landscaping.This is not a have to do but an option. I would like to talk in house a little more before we propose thus <br /> to the general to bid.The goal is to return the park to the City in good condition and to meet out Tero participation level. <br /> If the generals cost is more than his current contracts landscape budget are adtlitional funds available to complete this <br /> work.Thanks deb <br /> Sent from my BlackBerry 10 smartphone on the Verizon Wireless 4G LTE network. <br /> From: Souheil Nasr <br /> Sent:Tuesday, March 1, 2016 7:41 AM <br /> To: Mike 011ivant(MOIlivant@parametrix.com) <br /> Cc:Tom McKinsey; Debbie Bray;Tom Gallagher;Jim Miller <br /> Subject:TWP-Seg. 2 160301 SNN -Jackson Park <br /> Good Morning Mike, <br /> Attached are the Jackson Park proposed irrigation drawings to be shared with the Contractor for their use. Please let me <br /> know if you have any questions. <br /> Thanks, <br /> Souheil <br /> Souheil Nasr, PE <br /> City of Everett, Public Works I Principal Engineer <br /> 3200 Cedar Street <br /> EID <br />
The URL can be used to link to this page
Your browser does not support the video tag.