My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
300 E MARINE VIEW DR 2023-01-30
>
Address Records
>
E MARINE VIEW DR
>
300
>
300 E MARINE VIEW DR 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 9:48:59 AM
Creation date
1/30/2023 9:46:14 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
300
Notes
INSTALL TULALIP WATER PIPELINE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . • <br /> Kirk Brooks <br /> From: Josh <josh@reece-construction.com> <br /> Sent: Friday,January 29, 2016 11:32 AM <br /> To: 'Debbie Bray';Jim Miller; 'Tom McKinsey'; 'Nicole' <br /> Cc: Kirk Brooks; Souheil Nasr; andy@reece-construction.com <br /> Subject: RE:TWP-Seg. 2: City Permit <br /> Thanks Deb, I will get on this early next week. <br /> Thank You, <br /> Josh Schoneman <br /> Estimator <br /> Office 360-547-4328 <br /> Fax 360-659-9633 <br /> Cell 425-327-7097 <br /> DBE#D1M0023093 <br /> Original Message <br /> From: Debbie Bray [mailto:dbray@tulaliptribes-nsn.gov] <br /> Sent: Friday,January 29, 2016 11:22 AM <br /> To: 'Jim Miller'<JMiller@everettwa.gov>;Tom McKinsey<tmckinsey@tulaliptribes-nsn.gov>;Josh Schoneman <br /> (josh@reece-construction.com)<iosh@reece-construction.com>; 'Nicole' <br /> <nicole@reece-construction.com> <br /> Cc: Kirk Brooks<KBrooks@everettwa.gov>; Souheil Nasr<SNasr@everettwa.gov> <br /> Subject: RE:TWP-Seg. 2: City Permit <br /> Josh this is a permit that you will need to obtain.Application and directions are contained within this email. <br /> Thanks Deb <br /> Original Message <br /> From:Jim Miller [mailto:JMiller@everettwa.gov] <br /> Sent: Friday,January 29, 2016 10:27 AM <br /> To:Tom McKinsey<tmckinsev@tulaliptribes-nsn.gov> <br /> Cc: Debbie Bray<dbray@tulaliptribes-nsn.gov>; Kirk Brooks<KBrooks@everettwa.gov>;Souheil Nasr <br /> <SNasr@everettwa.gov> <br /> Subject:TWP-Seg. 2: City Permit <br /> Importance: High <br /> Mac: <br /> As to the need for a City permit to construct a pipeline in City of Everett Parks and street rights of way,there is a <br /> City of Everett Public Works Permit required. One permit can cover both the Parks area and the street crossing. <br /> Here's the drill: <br /> 1. Fill out attached permit application. <br /> 2.Attach to the permit 4 copies of the plan sheets related to the area of construction (e.g. Drawing No. C-2). <br /> 3. Submit to Kirk Brooks (email above, phone:425-257-8814) at permit counter on second floor of our building <br /> @3200 Cedar St. <br />
The URL can be used to link to this page
Your browser does not support the video tag.