My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 N BROADWAY REFINED COFFEE 2023-02-06
>
Address Records
>
N BROADWAY
>
902
>
REFINED COFFEE
>
902 N BROADWAY REFINED COFFEE 2023-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2023 8:34:19 AM
Creation date
2/6/2023 8:33:36 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
902
Tenant Name
REFINED COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/8/2P22 Page 4 f t City of Everett <br /> 6:42:J VI <br /> INSPECTION ACTIVITY REPORT <br /> 7/11/2022 7/11/2022 PLUMB 08-FINAL JJM CORRECTION eTRAKiT Inspection 7/7/2022 1:35 PM J H B LTD <br /> Request AM if possible <br /> Contact Name:J H B LTD <br /> Site Address:902 N BROADWAY#B <br /> Phone:4257100650 <br /> e-Mail:info@jhbconstructioncom <br /> (7/11/2022 2:38 PM JJM) <br /> -Install ADA compliant toilet in ADA <br /> restroom with floor to bowl height 17"to <br /> 19"tall including seat.Per 2010 ADA <br /> requirements section 604.4 Seats <br /> - Install mechanical vent on 11/2"ABS <br /> pipe/vent for floor sink under coffee bar <br /> counter. <br /> -Install RPBA before water supply to ice <br /> machine and espresso machine per UPC <br /> and city of Everett backflow requirements. <br /> One device should work to supply both <br /> units from under counter.New Device will <br /> need to be tested by a licensed back-flow <br /> assembly tester before final plumbing <br /> approval can be given.Make sure backflow <br /> device has sufficient access for tessting and <br /> servicing per UPC. <br /> -Install 1"minimum air-gap on all tubing <br /> or other drains running into floor sink under <br /> coffee bar per UPC. <br /> 7/26/2022 7/26/2022 PLUMB 08-FINAL JJM CANCELLED eTRAKiT Inspection 7/25/2022 11:21 AM J H B LTD <br /> Request AM preferred.30 minute heads up if <br /> possible. <br /> Contact Name:J H B LTD <br /> Site Address:902 N BROADWAY#B <br /> Phone:4257100650 <br /> e-Mail:info@jhbconstructioncom <br /> 7/26/2022 7/26/2022 PLUMB 08-FINAL JJM CORRECTION (7/26/2022 12:16 PM JJM) <br /> -Need back flow assembly test report sent <br /> in to the city. <br /> (7/26/2022 1:42 PM JJM) <br /> -Install ADA toilet in mens restroom per <br /> ADA requirements. <br /> -Install indirect hub drain for three <br /> compartment sink per UPC and health <br /> department requirements. <br /> 8/1/2022 8/1/2022. PLUMB 08-FINAL JJM RESCHEDULE eTRAKiT Inspection 7/29/2022 2:21 PM J H B LTD <br /> Request 30 minute heads up if possible <br /> Contact Name:J H B LTD <br /> Site Address:902 N BROADWAY#B <br /> Phone:4257100650 <br /> e-Mail:info@jhbconstructioncom <br /> 8/1/22-contractor called to request <br /> cancellation of inspection.Sent Teams <br /> message to Jason. <br /> 8/5/2022 8/5/2022 PLUMB 08-FINAL JJM APPRVD-PERK plumbing complete 8/4/2022 11:49 AM J H B LTD <br /> AM if possible.Call 30 minutes ahead if <br /> possible.206-235-9909 <br /> Contact Name:J H B LTD <br /> Site Address:902 N BROADWAY#B <br /> Phone:4257100650 <br /> e-Mail:info@jhbconstructioncom <br /> INSP12 Cr S'dSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.