Laserfiche WebLink
GROUNDING PLAN LEGEND: (_ <br /> ---GROUND WIRE (' COPPER GROUND ROD <br /> • EXOTHERMIC WELD GROUND ROD t, :.,/ AT&T <br /> • MECHANICAL CONNECTION W/ TEST WELL <br /> • <br /> CELL REFERENCE GROUND BAR: POINT OF GROUND REFERENCE <br /> FOR ALL COMMUNICATIONS EQUIPMENT FRAMES. ALL BONDS ARE <br /> MADE WITH #2 STRANDED GREEN INSULATED COPPER <br /> CONDUCTORS. BOND TO GROUND RING WITH (2) #2 SOLID CROWN <br /> NEW ANTENNA NEW ANTENNA NEW ANTENNA TINNED COPPER CONDUITS (ATT—TP-76416 7.6.7). <br /> AND/OR RADIO AND/OR RADIO AND/OR RADIO CASTLE <br /> EQUIPMENT (SEE EQUIPMENT (SEE EQUIPMENT (SEE HATCH PLATE GROUND BAR: BOND TO THE INTERIOR GROUND <br /> SHEET C-3 FOR SHEET C-3 FOR SHEET C-3 FOR RING WITH (2) #2 STRANDED GREEN INSULATED COPPER 1505 WESTLAKE AVENUE NORTH,SUITE 800 <br /> MODEL AND MODEL AND MODEL AND CONDUCTORS. WHEN A HATCH—PLATE AND A CELL REFERENCE SEATTLE,WA 98109 <br /> QUANTITY) QUANTITY) QUANTITY) sevSiRm raR GROUND BAR ARE BOTH PRESENT, THE CELL SITE REFERENCE <br /> DEVICEGROUND BAR MUST BE CONNECTED TO THE HATCH—PLATE AND <br /> 1 TO THE INTERIOR GROUND RING USING (2) #2 STRANDED GREEN <br /> INSULATED COPPER CONDUCTORS. D O <br /> A <br /> I I I EXTERIOR CABLE ENTRY PORT GROUND BARS: LOCATED AT THE O <br /> ENTRANCE TO THE CELL SITE BUILDING. BOND TO GROUND RING <br /> I WITH A #2 SOLID TINNED COPPER CONDUCTORS WITH AN P.MARSHALL&ASSOCIATES <br /> 1 1 EXOTHERMIC WELD AND INSPECTION SLEEVE (ATT—TP-76416 <br /> • 7.6.7.2). <br /> SECTOR GROUND BAR SECTOR GROUND BAR SECTOR GROUND BAR <br /> 1 I I DURING ALL DC POWER SYSTEM CHANGES INCLUDING DC SYSTEM <br /> CHANGE OUTS, RECTIFIER REPLACEMENTS OR ADDITIONS, BREAKER <br /> DISTRIBUTION CHANGES, BATTERY ADDITIONS, BATTERY <br /> REPLACEMENTS AND INSTALLATIONS OR CHANGES TO DC L I J CONVERTER SYSTEMS IT SHALL BE REQUIRED THAT SERVICES \ 9 <br /> CONTRACTORS VERIFY ALL DC POWER SYSTEMS ARE EQUIPPED <br /> WITH MASTER DC SYSTEM RETURN GROUND CONDUCTOR FROM <br /> TOWER TOP COLLECTOR GROUND BAR •— J THE DC POWER SYSTEM COMMON RETURN BUS DIRECTLY BU #: 826263 <br /> CONNECTED TO THE CELL SITE REFERENCE GROUND BAR PER MUKILTEO HEIGHTS <br /> TP76300 SECTION H 6 AND TP76416 FIGURE 7-11 <br /> MIDPOINT GROUND BAR REQUIREMENTS. <br /> (AS NEEDED) 2215 MERRILL CREEK PKWY <br /> EVERETT, WA 98203 <br /> TOWER EXIT GROUND BAR <br /> I <br /> I <br /> REV DATE DESCRIPTION <br /> TOWER GROUND RING I A 8/4/21 PRELIMS <br /> L I 1 0 9/10/21 FOR CONSTRUCTION <br /> I I <br /> I— <br /> I I EQUIPMENT GROUND RING <br /> EXISTING EQUIPMENT AREA <br /> 1 <br /> NEW GROUND <br /> EQUIPMENT (SEE <br /> SHEET C-1.2 <br /> FOR MODEL AND <br /> QUANTITY) DESIGNED:JLB <br /> � <br /> DRAWN: JLB <br /> I <br /> 1 drif;:-! '' ) CHECKED: PWM <br /> JOB#: <br /> I '11 21CCAO6M-0055 <br /> 1 U81 NUMBER:604-106-184 <br /> CELL REE RERCE GROUND BMR <br /> __. -_ - _ - _ _ � - T I <br /> I I GROUNDING <br /> L -j J SCHEMATIC <br /> GROUNDING SCHEMATIC G-1 <br />