Laserfiche WebLink
MODIFICATIONS BASED ON THE FAILING GENERAL NOTES <br /> STRUCTURAL ANALYSIS FROM B+TGROUP p B+T G R P <br /> DATED 06/24/21 ANDD ACC COMPANIEIED BY <br /> ANALYSIS FROM B+T GROUP DATED 07/19/21 1.1 CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND 1717 S.BOULDER <br /> DIMENSIONS PRIOR TO THE MOBILIZING ON THE SITE FOR INSTALLATION SUITE 300 <br /> NEW PLATFORM REINFORCEMENT KIT, OF THE MOUNT MODIFICATION AND SHALL NOTIFY THE ENGINEER OF TULSA,OK 74119 <br /> SITEPROI#PRK-SFS-L RECORD IF THE FIELD CONDITIONS VARY FROM WHAT IS SHOWN ON PH:(918)587-4830 <br /> RE.2/S1 THE DRAWINGS. IN ADDITION,THE CONTRACTOR SHALL NOTIFY THE wwwbtgrp.com <br /> • ENGINEER OF RECORD PRIOR TO MOBILIZING AT THE SITE IF THE 7 <br /> MOUNT REINFORCEMENT SHOWN WILL NEED TO BE REVISED TO <br /> SATISFY FIELD CONDITIONS <br /> • 1.2 CONTRACTOR SHALL RELOCATE NON-ANTENNA EQUIPMENT ALONG THE 4111110 <br /> EXISTING PIPE MOUNT THAT IT IS MOUNTED TO,TO ALLOW FOR 1 AT&T <br /> INSTALLATION OF MOUNT REINFORCEMENT.ENGINEER OF RECORD `�� <br /> WILL BE NOTIFIED IF NON-ANTENNA EQUIPMENT NEEDS TO BE <br /> ®\I RELOCATED TO ANY OTHER EXISTING MEMBERS TO ALLOW FOR <br /> INSTALLATION OF MOUNT MODIFICATION. <br /> �' ... 1.3 MODIFICATION SHALL BE COMPLETED PRIOR TO ADDING THE <br /> PROPOSED APPURTENANCES. <br /> / 1.4 ALL WORK SHALL COMPLY WITH THE TIA-222-H STANDARD,ANSIlTIA-322 <br /> AND ANSI/ASSE A10.48,AS WELL AS ANY OTHER GOVERNING BUILDING <br /> • CODES. <br /> 1.5 FIELD WORK WILL BE DONE AROUND EXISTING COAXIAL CABLE AND CROWN <br /> EQUIPMENT. ALL WORK SHALL BE DONE IN A MANNER SUCH THAT NO <br /> DAMAGE OCCURS TO THE EXISTING EQUIPMENT OR THE STRUCTURE. CASTLE <br /> Al 1.6 A MINIMUM OF TWO COATS OF ZINGS COLD GALVANIZING COMPOUND a%,::(OR APPROVED EQUIVALENT)SHALL BE APPLIED TO ANY FIELD CUTS OR <br /> FIELD DRILLED HOLES. <br /> 1.7 THE USE OF A GAS TORCH OR WELDER WILL NOT BE PERMITTED ON <br /> THE TOWER WITHOUT THE CONSENT OF THE OWNER. <br /> r 1.9 INLLIEU OF TEMPORAIRY BRACING,CONTRACTOR MAY HAVE A STABOILITY NORPRO <br /> I <br /> / ANALYSIS PERFORMED BY AN ENGINEER LICENSED IN THE STATE THE <br /> TOWER IS LOCATED.THE ANALYSIS SHALL USE A MINIMUM WIND SPEED <br /> ®.- OF 45 mph(3-SEC)PER IA-322 and ANSI/ASSE A10.48 2215 MERRILL CREEK PKWY <br /> • <br /> 1.10 ALL CUTTING AND WELDING ACTIVITIES SHALL BE CONDUCTED IN EVERETT,WA 98203 <br /> %� '• ' I ACCORDANCE WITH CCUSA POLICY"CUTTING AND WELDING PLAN"(DOC <br /> .. . ' �,/ #ENG-PLN-10015)ON AN ONGOING BASIS THROUGHOUT THE ENTIRE SNOHOMISH <br /> LIFE OF THE PROJECT. <br /> 'i - 1.11 DIMENSIONS WITH"3"MUST BE WITHIN 3"OF THE INDICATED EXISTING PLATFORM <br /> DIMENSION. AT 13G'-00^ <br /> ., _ <br /> ® FABRICATION <br /> �� �\ PROJECT NO: 92189.006.01 <br /> 2.1 ALL WORK SHALL BE DONE IN ACCORDANCE WITH A.I.S.C. CHECKED BY: Tv <br /> ' ®0 <br /> I/ "SPECIFICATIONS FOR THE DESIGN,FABRICATION AND ERECTION OF <br /> STRUCTURAL STEEL FOR BUILDINGS." <br /> 2.2 STRUCTURAL STEEL SHALL MEET THE FOLLOWING SPECIFICATIONS: I ISSUED FOR <br /> I� % �.n" , 11, <br /> ,, �• YIELD ASTM SPECS <br /> • - </ STEEL PIPE,U.N.O. 35ksi A53 GR.B REV DATE ORWN DESCRIPTION <br /> _ <br /> A 0 07/19/21 eMS CONSTRUCTION <br /> M. <br /> ..L <br /> I <br /> age 2.3 ALL NEW MATERIAL INCLUDING STRUCTURAL STEEL AND FASTENERS L `- - -' <br /> SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION IN EMT ENGINEERING, INC. <br /> ACCORDANCE WITH ASTM A123 AND A153. 3425 <br /> 2.4 WELDING SHALL MEET ANSI/AWS D1.1 STRUCTURAL WELDING CODE Expires 12 31 <br /> t.:'. \ <br /> (LATEST REVISION).ELECTRODES SHALL BE E80 SERIES. <br /> -^• j, 2.5 CONTRACTOR SHALL PROVIDE SHOP FABRICATION DRAWINGS TO B+T <br /> 4*'16; GROUP 5 DAYS PRIOR TO FABRICATION. <br /> -I ,`, A' <br /> ON <br /> r; � " WASyF,� <br /> A�` <br /> NOTE: p. <br /> O , 0'L :i <br /> RELOCATE EXISTING SUPPORT RAIL TO 6'-3" r <br /> ABOVE MOUNT HORIZONTAL • <br /> MODIFIED PLATFORM • ..A, " / <br /> O SCALE: N.T.S. �F CTV E4461 <br /> w ; <br /> S IT IS A VIOLATION OF UW FOR ANY PERSON. <br /> UNLESS THEY ARE AC11NG UNDER THE DIRECTION <br /> OF A LICENSED PROFESSIONAL ENGINEER. 1 <br /> TO ALTER THIS DOCUMENT. <br /> SHEET NUMBER: REVISION: <br /> QSITE PRO1 PRK-SFS-L REINFORCEMENT KIT S <br /> O <br /> SCALE: N.T.S. <br />