Laserfiche WebLink
Ig ting, otor an• ectnca n equirements ist, pg 1 o 1 <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by©2022 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> Project: <br /> Joint Chiropractic-Mill Creek-2018 WSEC <br /> 12906 Bothell-Everett Hwy - <br /> B ° ' <br /> Everett,WA 98208 JUN 1 4 2422 <br /> Date:2022-03-08 <br /> �� ,.Ye t <br /> Applies Code Section Component Compliance Information R f ayrof Aic o in, I 1 Building Department <br /> Documentation Permit simovosets Notes <br /> LIGHTING SCOPE <br /> C103.1 Construction For a shell&core or tenant space(first build- <br /> documents-General ;out)project,indicate if there is no lighting <br /> scope included in the project. <br /> YES i C103.1 Construction i For an alteration project,indicate if there is I(A1.2 <br /> documents-General no lighting scope included in the project. <br /> LIGHTING CONTROLS <br /> YES C405.2 Lighting controls, For all lighting fixtures,indicate lighting switching shown- <br /> general control method on plans for spaces and other controls and <br /> lighting zone(s)served,or exception taken sensors provided <br /> under the electrical <br /> contractors permit <br /> C405.2. Luminaire level indicate on plans all fixtures provided with <br /> Option 2 lighting controls LLLC in lieu of C405.2 lighting controls; <br /> 1 }(LLLC) provide dssription of control capabilities and ! i <br /> performance parameters <br /> C405.2.5, 1 Lighting in dwelling i Indicate method of automatic control of all <br /> Item 3 j units(dormitory, i installed luminaires in dwelling units in <br /> C405,2.1.1 I hotel and all other j buildings other than multifamily(occupancy <br /> C405.2.3.1 i than multifamily) or light reduction controls) <br /> C405.2.5, Lighting in sleeping Tndicate method of automatic off control of <br /> Rein 2 units { all installed ltinti.naires in sleeping units <br /> (vacancy or key card control):also refer to <br /> I i <br /> I i (Receptacles <br /> YES C405.2.3 Manual controls Indicate on plans the method of manual general switching <br /> C405.2.3.1 lighting control,location of manual control shown-final switching <br /> C405.2.5 device and the area or specific application it by electrical <br /> serves contractor under their <br /> permit <br /> NO C405.2.3.1 Manual interior light Indicate on plans which method of manual general switching <br /> C405.2.1.1 reduction controls 50%lighting load reduction is provided,or shown-final switching <br /> C405.2.4 indicate applicable exception by electrical <br /> contractor under their <br /> permit <br /> NO C405.2.1 Method of automatic Indicate on plans the method of automatic general switching <br /> C405.2.2.1 shut-off control shut-off control during unoccupied periods shown-final switching <br /> C405.2.1, (occupancy sensor,time switch or digital by electrical <br /> Exception 3 timer switch)for all lighting zones contractor under their <br /> permit <br /> NO C405.2.1 Occupant sensor Indicate on plans all luminaires that are general switching <br /> controls controlled by occupant sensor controls; shown-final switching <br /> indicate controls are configured to turn by electrical <br /> } luminaires 100%off when the space is contractor under their <br /> L_ unoccupied permit <br /> Page 1/11 <br />