Laserfiche WebLink
r T WAG 295 a9 O: ELECTR CAL PLA REVIEW <br /> EVER <br /> • <br /> -DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to (a) <br /> to tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review <br /> is required, select the box next to (b)and (c)to acknowledge that plan review is required and the electrical plans have been <br /> provided with this permit application. <br /> * If item(a)-(ii, iii, or v)is selected, the work must also comply with section (a)-(vii). See arrow flow chart below. <br /> (3) Electrical plan review. <br /> f l (a) Electrical plan review is not required for: <br /> Q (i) Low voltage systems; <br /> (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> f Q (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution <br /> system does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2; or <br /> (C)A required fire pump system. <br /> 4 Q (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC <br /> 517.2; and <br /> (D)Service or feeder load calculations are increased by 5% or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic, fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vii) For installations in (a)(ii),(iii), and(v)of this subsection to be considered,the following must be <br /> —�Q available to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent <br /> protection for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> ❑ physicians' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> 1 1 (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> r✓ (c) If a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-7 Table 900-2 <br /> Health or Personal Care Facilities <br /> Educational and Institutional Facilities,Places of Assembly,or Other Facilities <br /> Health or Personal Care Facility i Plan Review <br /> Type Required Educational, Institutional.or Plan Review <br /> Other Facility Types Required <br /> NOtef,r `ab ies 900-'and 900-2. <br /> • <br /> _ = PERMIT# Page 2-Plan Review <br />