My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD 2023-02-06
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD 2023-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2023 3:24:19 PM
Creation date
2/6/2023 3:24:04 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t C • • <br /> Sno Isle Welder Outlet Additions <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> MDB <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : March 2022 <br /> Phase to Phase Voltage(Volts) : 480 <br /> Phases(1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 315 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 350.00 KVA <br /> NEC 220.87(2) adjustment factor X 1.25 <br /> Adjusted Peak Demand = 437.50 KVA <br /> ,Seasonal adjustment factor X 1.00 <br /> Seasonal adjustment peak demand = 437.50 KVA. <br /> Occupancy adjustment factor X 1.00 <br /> Occupancy adjustment peak demand = 437.50 KVA <br /> Other adjustement factor(s) X 1.00 <br /> Utility Peak Demand with Adjustments = 437.50 KVA <br /> New Calculated Demand Load Added Panel WW + 9.88 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 447.38 KVA <br /> CALCULATED DEMAND CURRENT : 538 AMPS <br /> Note: See WAC 296-46B-900 (3)(j)for additional metering requirements <br /> L JUN 0 2 2022 ji <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.