Laserfiche WebLink
t C • • <br /> Sno Isle Welder Outlet Additions <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> MDB <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : March 2022 <br /> Phase to Phase Voltage(Volts) : 480 <br /> Phases(1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 315 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 350.00 KVA <br /> NEC 220.87(2) adjustment factor X 1.25 <br /> Adjusted Peak Demand = 437.50 KVA <br /> ,Seasonal adjustment factor X 1.00 <br /> Seasonal adjustment peak demand = 437.50 KVA. <br /> Occupancy adjustment factor X 1.00 <br /> Occupancy adjustment peak demand = 437.50 KVA <br /> Other adjustement factor(s) X 1.00 <br /> Utility Peak Demand with Adjustments = 437.50 KVA <br /> New Calculated Demand Load Added Panel WW + 9.88 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 447.38 KVA <br /> CALCULATED DEMAND CURRENT : 538 AMPS <br /> Note: See WAC 296-46B-900 (3)(j)for additional metering requirements <br /> L JUN 0 2 2022 ji <br /> CITY OF EVERETT <br /> Permit Services <br />