My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 S 3RD AVE 2023-05-10
>
Address Records
>
S 3RD AVE
>
4918
>
4918 S 3RD AVE 2023-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 10:00:53 AM
Creation date
2/9/2023 11:01:01 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2210-001 <br />Applied: 10/3/2022 <br />Issued: 10/5/2022 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:10/5/2022 <br />Finaled: 5/8/2023 <br />"SUBJECT TO FIELD INSPECTION" <br />Description: REPLUMB whole house <br />Site Address: 4918 S 3RD AVE <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: dan orme <br />Owner: dan orme <br />Contractor: OWNER <br />SCHEDULED DATE I COMPLETED DATE I TYPE I INSPECTOR I RESULT I REMARKS <br />10/14/2022 I 10/14/2022 I PLUMB 03i-ROUGH I MJASON EY I CORRECTION <br />EQUIRED I eTRAKiT Inspection Request <br />Notes: <br />10/5/2022 2:58 PM dan orme <br />Contact Name: dan orme <br />Site Address: 4918 S 3RD AVE <br />Phone:4253149632 <br />e-Mail: dano@microsoft.com <br />jjm changed Inspection Type from PLUMB 08-FINAL to PLUMB 03-ROUGH IN <br />jjm changed Inspection Type from PLUMB 08-FINAL to PLUMB 03-ROUGH IN <br />- Non code use of San tee fitting on its back being used for closet bend and a wet vent with the lay. 706.3 Horizontal to Horizontal 706.4 Vertical to <br />HorizontalCan be horizontal wet vent but must tie in downstream of closet bend on a 3" by 2" wye fitting per 2018 UPC.*** Per 2018 UPC 310.3 Waste <br />Connection No waste connection shall be made to a closet bend or stub of a water closet or similar fixture.- Caulk pedestal leg to floor and to bottom of <br />basin per 2018 UPC chapter 4.- Install mixing valve on water supply to upstairs bathtub per 2018 UPC 409.4 Limitation of Hot Water in Bathtubs and <br />Whirlpool Bathtubs- Install mid story support on 3" ABS stack in hallway. Per 2018 UPC- Install RPBA back flow device on 1/2" copper supply feeding <br />boiler per 2018 UPC. 602.1 Prohibited Installation.- Fix leaking wax seal on half bath toilet. <br />- Non code use of San tee fitting on its back being used for closet bend and a wet vent with the lay. 706.3 Horizontal to Horizontal 706.4 Vertical to <br />HorizontalCan be horizontal wet vent but must tie in downstream of closet bend on a 3" by 2" wye fitting per 2018 UPC.*** Per 2018 UPC 310.3 Waste <br />Connection No waste connection shall be made to a closet bend or stub of a water closet or similar fixture.- Caulk pedestal leg to floor and to bottom of <br />basin per 2018 UPC chapter 4.- Install mixing valve on water supply to upstairs bathtub per 2018 UPC 409.4 Limitation of Hot Water in Bathtubs and <br />Whirlpool Bathtubs- Install mid story support on 3" ABS stack in hallway. Per 2018 UPC- Install RPBA back flow device on 1/2" copper supply feeding <br />boiler per 2018 UPC. 602.1 Prohibited Installation.- Fix leaking wax seal on half bath toilet. <br />- Non code use of San tee fitting on its back being used for closet bend and a wet vent with the lay. 706.3 Horizontal to Horizontal 706.4 Vertical to <br />HorizontalCan be horizontal wet vent but must tie in downstream of closet bend on a 3" by 2" wye fitting per 2018 UPC.*** Per 2018 UPC 310.3 Waste <br />Connection No waste connection shall be made to a closet bend or stub of a water closet or similar fixture.- Caulk pedestal leg to floor and to bottom of <br />basin per 2018 UPC chapter 4.- Install mixing valve on water supply to upstairs bathtub per 2018 UPC 409.4 Limitation of Hot Water in Bathtubs and <br />Whirlpool Bathtubs- Install mid story support on 3" ABS stack in hallway. Per 2018 UPC- Install RPBA back flow device on 1/2" copper supply feeding <br />boiler per 2018 UPC. 602.1 Prohibited Installation.- Fix leaking wax seal on half bath toilet. <br />I <br />Printed: Monday, 08 May, 2023 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.