Laserfiche WebLink
PU BLIOVORKS PERMIT Date Applied: 7/22/2020 <br /> City of Everett Permit Services Public Works Permit#: PW2007-035 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B2001-007 <br /> EV E R E I I Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $26,134.61 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CATALYST CAPITAL JOHN DOLENCE <br /> 1800 AVE OF THE STARS,STE 1475 <br /> LOS ANGELES,CA,90067 , <br /> PHONE:4845475530 PHONE:4259572136 <br /> TAX PARCEL ID#:00606200004102 SITE ADDRESS: 220 OLYMPIC BLVD <br /> DESCRIPTION:SITE WORK FOR NEW VA OUTPATIENT CLINIC <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 05/05/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to <br /> be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work <br /> shall be scheduled 3-4 weeks in advance. <br /> 8. Prior to any interruption to the public right-of-way(roadways, parking lanes,or sidewalks)a Traffic Street Use permit shall be <br /> obtained from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of <br /> application. <br /> 9. Prior to the start of construction, provide structural plans and loading calculations to the City for the detention vault.Vaults within a <br /> traveled way which exceed 20 feet in length along the direction of travel shall be designed to meet bridge structural standards in <br /> accordance with the current version of AASHTO LRFD Bridge Design Specifications.Vaults meeting these criteria shall be designed by a <br /> structural engineer licensed in the State of Washington [DCSS 4-4.4(3)]. Refer to the City vehicle loading requirements previously <br /> provided. <br /> 10.To demonstrate detention vault stability where seasonal groundwater may induce flotation,you may:(a)provide engineering <br /> calculations prior to the start of construction or(b)or the geotechnical engineer for the project may evaluate this during construction <br /> and provide a letter to the City. <br /> 11.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 12. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 13.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the <br /> City prior to final approval/close out of the permit. <br /> 14.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 15. Record the stormwater Declaration of Covenant with Snohomish County and provide a copy to the y --'.•r al p r.Eout of the permit. r <br /> CONTINUED ON NEXT PAGE <br /> 1f <br /> KY 13 2021 L <br /> I <br /> P CI Y OF EVERETT <br /> Permit Services <br />